   ROAD WORK WEEKLY REPORT

Scheduled roadwork for week beginning September 1, 2002, for the Department of Design & Construction – Civil Design and Engineering (Construction Management Branch), Wastewater Design and Engineering (Construction Management Branch).  Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

AIEA

 

Curb Ramps at Various Locations, FY 2001(1) – Hinu Place and Noelani Street, Kamahao Street and Noelani Street, Koaheahe Street and Noelani Street, Moanalua Road/Kaonohi Street/Moanalua Loop, Ulune Street/Kaamilo Street/Wiliko Street:

Construct new curb ramps, sidewalks and driveways.  Install traffic signal and streetlight system, traffic signs, striping, markings and markers.

 

            (Estimated completion date, October 2002)

 

Curb Ramps at Various Locations, FY 2001(3) – Ulune Street and Wiliko Street:

Installing striping, markings and markers.

 

            (Estimated completion date, November 2002)

 

EWA BEACH

 

Curb Ramps at Various Locations, FY 2001(1) – Papipi Place and Papipi Road, Ihipehu Street and Pohakupuna Road, Pohahawai Place and Pohahawai Street:

Localized pavement, curb ramp, striping and marker repairs at various areas.

 

            (Estimated completion date, October 2002)

 

HAWAII KAI

Curb Ramps at Various Locations, FY 2001(2) – Lunalilo Home Road/Nawiliwili Street, Nawiliwili Street/Poipu Drive, Poipu Drive/Lunalilo Home Road, Kawaihae Street/Hakalau

Place:

Construct new curb ramps, transitional sidewalks, curbs and gutters, and pavement markings.

 

            (Estimated completion date, November 2002)

 

HONOLULU

 

PROJECT SUSPENDED ~ WORK WILL RESUME IN AUGUST 2002 ~

Ala Moana Boulevard Beautification, Kalia Road to Kalakaua Avenue: 

Install new concrete sidewalk and curb ramps.  Install new street lighting and traffic signal systems.  Install landscape planting and irrigation system. 

             

 

Curb Ramps at Various Locations, FY 2000(1) – Adams Lane/Bishop Street, Alakea Street/Merchant Street, Alakea Street/Queen Street, Alakea Street between South King Street & South Beretania Street, Bethel Street/Chaplain Lane, Maunakea Street/North Pauahi Street, Bishop Street/Merchant Street, Bishop Street/Queen Street, Chaplain Lane/Nuuanu Avenue, Maunakea Street/North Kukui Street: 

Construct new curb ramps, transitional sidewalks, curbs and gutters & pavement markings. 

 

            (Estimated completion date, August 2002)

 

Curb Ramps at Various Locations, FY 2000(2) – Smith Street/Pauahi Street, Nuuau Avenue/Pauahi Street, Merchant Street/Richards Street, Queen Street/Richard Street, Queen Street/Mililani Street, Kapiolani Boulevard/Cooke Street, Liona Street/Kaheka Street, Rycroft Street/Ahana Street, Kanunu Street/Keeaumoku Street, Rycroft Street/Kaheka Street, Kanunu Street/Kaheka Street, South Beretania Street/Artesian Street, South Beretania Street/Alexander Street, South Beretania Street/Farrington Street, South Beretania Street/Griffiths Street, South Beretania Street/Hoawa Lane, South Beretania Street/Isenburg Street, South King Street/Coolidge Street, South King Street/Kahoaloha Lane, Date Street/Kamoku Street, Date Street/Laau Street, Kalakaua Avenue/South Beretania Street:

Localized pavement, curb ramp, striping and marker repairs at various areas. 

 

            (Estimated completion date, August 2002)

 

Curb Ramps at Various Locations, FY 2001(2) – 10th Avenue/La’i Road, 10th Avenue/Hardesty Street, 10th Avenue/Kiwila Street, 10th Avenue/Maluhia Street; Kilauea Avenue/Malia Street,

Pueo Avenue/Pahoa Avenue:

Construct new curb ramps, transitional sidewalks, curbs and gutters and pavement transitions.

 

            (Estimated completion date, November 2002)

 

Curb Ramps at Various Locations, FY 2001(4) – Fern/Hoawa, Isenberg/Fern, Isenberg/Lime, Hobron/Kaioo, Ena Road/Hobron, Seaside/Manukai, Kaiulani/Prince Edward, Prince Edward/Uluniu, Wyllie midblock, Hihiwai/Kamoku, Kamoku/Lauiki, King/Kapaakea, Kapiolani/Kaaha, Alohea/Kepuhi, Kiwili/Ahe, Dole/Wilder, Dole Midblock, Kaipue/Mahiai, Mahiai/Kapiolani, Maunalei Midblock, Kalawao/Lowery:

Construct new curb ramps, transitional sidewalks, curbs and gutters and pavement markings.

 

            (Estimated completion date, September 2002)

 

Curb Ramps at Various Locations, FY 2001(5) – Ainakoa/Aliikoa, 22nd/Kaimuki, Ahuli/Pahoa, Moho/Pahoa, Moa/Pahoa, Moa/Pueo, Ahuawa/Kilauea, Pikake/Wyllie, Wyllie/Wyllie Place, Hele/Lekeona:  Construct new curb ramps, transitional sidewalks, curbs and gutters and pavement marking.

 

            (Estimated completion date, November 2002)

 

PROJECT SUSPENDED ~ WORK WILL RESUME IN LATE 2002~

Punchbowl Street Improvements, Phase I: 

Reconstruct curb ramps and restripe at King Street and Beretania Street intersection. 

 

Reconstruction of Streets, Unit III - Alencastre Street and Alewa Drive: 

Install street striping and raise pavement markings. 

 

            (Estimated completion date, August 2002)

 

Rehabilitation of Streets, Unit III-97 - Mooheau Avenue, Monsarrat Avenue, Booth Road, Nuuanu Avenue, Dole Street and McCully Street: 

Reconstruct road pavement, sidewalks, curbs, gutters, curb ramps, driveways and drainage system.  Relocate and/or adjust existing electrical facilities for HECO, Verizon, traffic signal, street light and appurtenances.  Resurface, adjust manhole frame and cover to new grade and restripe. 

 

**AREAS IN BOLD – INDICATE WORK IN PROGRESS FOR THIS WEEK**

 

            (Estimated completion date, December 2002) 

 

PROJECT SUSPENDED ~AWAITING CONSULTANT’S REVISIONS ~

Rehabilitation of Streets, Unit 7A - Lusitana Street (Pauoa Road to Iolani Avenue): 

 

            (Estimated completion date, August 2002)

 

Rehabilitation of Streets, Unit 20 - Nuuanu Pali Drive, Diamond Head Road, Judd Street, Mott Smith Drive, Punahou Street: 

Reconstruct and resurfacing of roadways, adjust manhole covers and restore pavement striping. 

 

            (Estimated completion date, August 2002)

 

Reconstruction of Streets, Unit 26, Various Areas – University Avenue (Sea View Avenue to Oahu Avenue), Old Pali Road:

Reconstruct roadway pavement and base.  Adjust manhole frames and covers, street monument covers, and utility boxes to grade.  Install striping and pavement markers.

 

            (Estimated completion date, October 2002)

 

KAHUKU

 

PROJECT SUSPENDED ~AWAITING CONSULTANT’S REVISIONS~

Sidewalk Improvements at Pualalea Street:

Localized remedial work.

 

KALIHI

 

Curb Ramps at Various Locations, FY 2001(1) – Houghtailing Street/North King Street/Waikamilo Road, Houghtailing Street and Olomea Street, Bernice Street and Houghtailing Street, Mookaula Street and Waikamilo Road, Houghtailing and Monte Cooke Place, Houghtailing and Peter Buck, Houghtailing Street and Kohou Street, Koapaka Street/Lagoon Drive/Waiwai Loop:

Construct new curb ramps, sidewalksss and driveways.  Install traffuc sugnal and streetlight system, traffic signs, striping, markings and markers.

 

            (Estimated completion date, November 2002)

 

Curb Ramps At Various Locations FY 2001 (3) –Halina Street and Naai Street, Kaua Street and Middle Street, Haumana Place / Middle Street / Notley Street, Ahonui Street and North School Street, Dement Street and North School Street, Bernice Street and Kapalama Avenue, Gregory Street and Kapalama Avenue, Kapalama Place and Palapala Place, Kapalama Avenue and North School Street, Kaikuahine Street and Kapalama Avenue, Houghtailing Street and North School Street, Aupuni Street and North School Street, North School Street and Nad Pohaku Street, Kokea Street and North School Street, Kamenani Street and North King Street, Long Lane and North King Street, Morris Lane and North King Street, Hoapili Lane and North King Street,

Kokea Street and North King Street, Hikina Lane and North King Street, Kanoa Street and Palama Street, Lopez Lane and Palama Street, Kanoa Street and Pua Lane, Emmeluth Lane and Iao Lane, Alneo Street (Mid-block) between Kuakini Street and North School Street, North School Street (Mid-block) between Momolio Street and Liliha Street, Holokahana Lane and Liliha Street, Liliha Street and Liliha Street, Halapia Street and Liliha Street, Kaliawa Street and Sand Island Access Road, Auiki Street and Puuhale Road, Iwilei Road and Kuwili Street, Iwilei Road and Pacific Street, Puuhale Place and Puuhale Road, Kahai Street and Kalihi Street, Democrat Street and Libby Street, Hart Street and Waiakamilo Road, Kalani Street and McNeill Street, Colburn Street and Waikamilo Road, Kaumualii Street and McNeill Street, Kaiwiula Street and McNeill Street, Alokele Street and Kaiwiula Street, Moonui Street and Moowaa Street, Kaumualii Street and Moowaa Street, Kaumualii Street and Kohou Street.

Construct new curb ramps, sidewalks, and driveways.  Install traffic signal and streetlight system, traffic signs, striping, markings and markers.

 

**AREAS IN BOLD – INDICATE WORK IN PROGRESS FOR THIS WEEK**

 

            (Estimated completion date, November 2002)

 

Rehabilitation of Streets, Unit 29 – West Bound Lanes of Dillingham Boulevard between Kokea Street and Waikamilo Road:

Traffic loop detectors. 

 

            (Estimated completion date, August 2002)

 

KANEOHE

 

Rehabilitation of Streets, Unit 21 – 47-357 Ahuimanu Road, Hakuhale Street, Waipaipai Street, Henoheno Street & Henoheno Place, Waipua Place, Kinana Way, Ahulimanu Way, Ahuilimanu Place, Hio Place, Apau Loop, Apau Place, Poomau Street, Keohapa Place, Kapehe Street, Kialua Street, Hoopala Street, Hui Kelu Street & Hui Kelu Place, Hui Akiki Place, Hui Akepa Place, Miomio Loop, Hinalani Place & Hinalani Street, Hinapu Street, Kohina Street, Halaulani Street, Ahu Nani Place, Kalimaloa Street, Heeia Street, Hilinama Street, Humu Street & Place, Kapea Street & Place, Nana Place, Nahiku Street & Place, Punalei Place, Nakoa Place, Keoe Way & Place, Yacht Club Street & Place, Grote Road & Place, Haleloke Place, Haunani Place, Seabury Place, Halliday Place, 45-227 Kahanahou Circle, Wailele Road, Kailiwai Place, William Henry Road, Makena Place and Street, Kuneki Street, Holouka Place, Maeha Place, Kauhaa Place, Kumoo Loop & Place, Pilina Way & Place, Kuahulu Way, Kulukeoe Place & Street:

Reconstruction and resurfacing of roadways, adjust utility manholes and pavement markings. 

 

            (Estimated completion date, January 2003)

 

PROJECT SUSPENDED ~ AWAITING CONSULTANT ‘S REVISIONS ~

Rehabilitation of Streets, Unit 18 – Kaneohe Bay Drive (Kaimalu Place to Mokapu Road):

Completing minor deficiencies.

 

Rehabilitation of Streets, Unit 29 – Kamehameha Highway from Heeia Street to Long Bridge:

Utility manhole adjustment and pavement markings.

 

            Estimated completion date, August 2002)

 

MAKAKILO

 

Curb Ramps At Various Locations FY 2001(1)Panana Street and Weio Street:

Localized pavement, curb ramp, striping and marker repair work at various areas.

 

            (Estimated completion date, October 2002)

 

MILILANI

 

Curb Ramps at Various Locations, FY 2001(6) – Anania Drive/Noholoa Loop, Kaholo Street/Anania Drive, Kaholo Street/Kapuahi Street, Kaholo Street/Anania Drive, Hokualii

Court/Hokualii Street/Welehu Street, Makapipipi Street/Makohilani Street, Hokulewa Loop/Hokulewa Street/Kuahelani Avenue, Nawenewene Circle, Waihau Street/Waimakua Drive:

Construct new curb ramps, transitional sidewalks, curbs and gutters and pavement transitions.

 

            (Estimated completion date, October 2002)

 

Rehabilitation of Streets, Unit 12B - Kuahelani Avenue and Meheula Avenue:

Construct new curb ramps, sidewalks, driveways.  Install traffic signal system, streetlight system, traffic signs, striping, markings and markers.

 

            (Estimated completion date, December 2002)

 

MOANALUA

 

Curb Ramps at Various Locations, FY 2001(3) – Mahiole Street (Mid-block) between Onipa’a Street and Pineapple Place, Maalahi Street and Mahiole Street:

Installing striping, markings and markers.

 

            (Estimated completion date, November 2002)

 

PEARL CITY

 

Curb Ramps at Various Locations, FY 2001(2) – Aalii Place/Auhuhu Street, Anini Place/Auhuhu Street:

Construct new curb ramps, transitional sidewalks, curbs and gutters and pavement transitions.

 

            (Estimated completion date, November 2002)

 

Rehabilitation of Streets, Unit 11B – Hooni Place/Komo Mai Drive, Hoolehua Street/Komo Mai Drive, Hookupa Street/Komo Mai Drive, Hooulu Street/Komo Mai Drive; Hoomalu Street/Komo Mai Drive:

Construct new curb ramps, transitional sidewalks, curbs and gutters, and pavement transitions.

 

            (Estimated completion date, December 2002)

 

SALT LAKE

 

Curb Ramps at Various Locations, FY2001(2) – Palahinu Place/Piikea Street, Ekupane Street/Hakupapa Street, Haloa Drive/Hakupapa Street, Haloa Drive/Molina Street, Manuwa Street/Keaka Drive, Ala Lilikoi Street/Ala Lilikoi Place, Ala Ilima Street/Ala Laulani Street, Lunalilo Home Road, Kawaihae Street/Hakalau Place:

Construct new curb ramps, transitional sidewalks, curbs and gutters, and pavement transitions. 

 

            (Estimated completion date, November 2002)

 

Curb Ramps At Various Locations FY 2001 (3) – Ala Akulikuli Street and Ala Laulani Street, Ala Lilikoi Street and Ala Loke Street, Ala Ilima Street and Ala Nioi Place, Ala Makahala Place and Ala Napunani Street, Ala Napunani Street and Ala Poha Place, Ala Napunani Street and Likini Street:

Installing striping, markings and markers.

 

            (Estimated completion date, November 2002)

 

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:

Upgrade roadway to include 2 additional lanes in each direction, with designated left and right turning lanes. Provide traffic controls, mass grading, temporary security fencing, sidewalks, curbs, gutters, curb ramps and property adjustments, including demolishing and reconstructing new structures and constructing new walls. Install detention basins, drainage, water, sewer, traffic signal, streetlights, underground electrical system, oil lines, gas lines, pavement striping, markings and markers and traffic signs.

 

            (Estimated completion date, June 2004)

 

VILLAGE PARK

 

Curb Ramps at Various Locations, FY2001(1) – Kaaholo Street and Kimi Street, Kaaholo Street and Kupuna Loop, Kahakea Street and Kupuna Loop, Kehela Street and Kupuna Loop:

Installing traffic signs, striping, markings and markers.

 

            (Estimated completion date, October 2002)

 

WAHIAWA

 

Rehabilitation of Streets, Unit 23 – Puninoni Street, Puninoni Place, Kaliko Drive, Dole Road, Rose Street, Loko Drive, Loki Place, Kilau Place, Plum Street, Neal Avenue, Lemi Street, Olive Avenue, Mala Street, Ilima Street:

Reconstruct and resurface roadways, adjust manholes, monuments and gratings to new road grade and restore pavement striping.

 

**AREAS IN BOLD – INDICATE WORK IN PROGRESS FOR THIS WEEK**

 

            (Estimated completion date, October 2002)

 

WAIPAHU

 

Curb Ramps At Various Locations FY 2001 (1) – Hiapo Street and Mahoe Street, Hikimoe Street and Kahuailani Street, Hikimoe Street and Kahuailani Street and Mokuola Street, Honowai Street and Kipou Street, Leoku Street and Farrington Highway/Leolua Street, Mahoe Place and Mahoe Street, Pupukahi Street and Pupumomi Street, Pupukahi Street and Pupupuhi Street, Pupukupa Street and Pupupuhi Street and Waikele Road, Pupumomi Street and Pupunohe Street, Pupumomi Street and Pupupuhi Street, Pupunohe Street and Pupupuhi Street, Pupuole Street and Pupupuhi Street.

Installing striping, markings and markers.

 

            (Estimated completion date, October 2002)

 

Curb Ramps At Various Locations FY 2001 (3) – Puamano Place and Waipahu Street:

Installing striping, markings and markers.

 

            (Estimated completion date, November 2002)

 

Roadway Improvements for Mokuola Street (Kahuailani Street to Nali Street):  Reconstruct roadway pavement and base, curbs and gutters, sidewalks and driveway.  Install striping and pavement markings.  Pavement rehabilitation work on Hikimoe Street and Mokuola Street:  Reconstruct roadway pavement, resurface and restripe.

 

            (Estimated completion date, October 2002)

 

WAIPIO

 

Curb Ramps at Various Locations, FY 2001(1) – Lelepua Street and Waipio Uka Street:

Construct new curb ramps, sidewalks and driveways.  Install traffic signal and streetlight system, traffic signs, striping, markings, and markers.

 

            (Estimated completion date, November 2002)

 

WEST LOCH

 

Curb Ramps At Various Locations FY 2001 (1) – Olepekupe Street, Nahawele Street, Pa Street, Panapanapuhi Street, Paua Place:

Localized pavement, curb ramp, striping and marker repairs at various areas.

 

            (Estimated completion date, October 2002)

 

 

Parades, Walks, Races & Other Street Closures

 

August 25, 2002 Sunday
6:00AM Starts
8:00AM Ends
HAWAII STATE ROAD RACE sponsored by Tradewind Cycling Team.  The event is expected to have 70 cyclists.  It will start on Kaukonahua Rd. above Wilikina Dr. start/finish area, to Thompson Corner, to Weed Circle, to Kamehameha Hwy., to Kamananui Rd., to Kaukonahua Rd., to end at Kaukonahua start/finish area.  Contact: Faye Saiki 593-8079   

The above is based on the most current information available from the event organizers as of August 8, 2002 to the Department of Transportation Services.

-30-