You are here:  Main / Customer Services / Public Communications Division / Honolulu News 2002 / ROAD WORK, PARADES AND OTHER STREET ACTIVITIES

March 28, 2002 

ROAD WORK, PARADES AND OTHER STREET ACTIVITIES 

The departments of Facility Maintenance (FM) and Design & Construction (DC), and the Board of Water Supply (WS) have scheduled the following roadwork for the week of March 31 between 8:30 a.m. and 3:30 p.m. unless otherwise noted. Estimated completion date is in parentheses.

Contacts: Facility Maintenance: 523-4472; Design & Construction: 523-4049; Water Supply: 527-6148 

Continuing Projects:

Aiea: Curb ramps at Laumima Street (Completion by 5/02) DC

            Rehabilitation of Aiea Heights Drive. (Completion by 8/02) DC 

Haleiwa: Install water lines and equipment along Haleiwa Road, Kaika Place, Nalimu Road, Naoiwi Lane, Niuula Road and Walikanahele Road. (Completion by 6/02) WS

Hawaii Kai: RMY Construction, Inc. is installing an eight-inch main along Hawaii Kai Drive, from Pohoiki Place to Pepeekeo Street, and four-inch mains along various side streets in between. In addition, the contractor will install a 12-inch main along Kawaihae Street from Kalanianaole Highway to May Way, and eight-inch mains along May Way from Maunalua Avenue to Makaniolu Place, and along the entire length of Makaniolu Place. (Completion by 12/ 2002) WS
 
Honolulu: Reconstruct King Street from Liliha Street to River Street and Bethel Street to Richards Street. The work will be done March 7 10 day and night. (Completion by 7/02) DC

            Install new water main on Dillingham Boulevard between Waiakamilo Road and Lilihia Street. (Completion by 9/02) WS

            Reconstruct Nuuanu Avenue, Nuuanu Pali Drive, and Booth Road. (Completion by 6/02) DC

            Curb ramps at various locations downtown (Completion by 5/02). DC

                        Construct sewer line on Lusitania Street from Pauoa Road to Auwaiolimu Street. The street will be closed 8:30 a.m. to 3:30 p.m., Monday Friday. (Completion by 5/15/02) DC

            Reconstruct curb and gutter and install detectors at Ward Avenue and Kinau Street. (Completion by 7/26/02) DC

            Reconstruct Alewa Drive and Alencastre Street. (Completion by 9/02) DC 

Kahala: Renovation of Kealahou Street. (Completion by 8/02) DC 

Kahuku: Pualalea Street improvements. (Completion by 4/02) DC 

Kaimuki: Curb ramps and widened sidewalks along Waialae Avenue (Completion by 4/2/02) DC 

Kaneohe: A 42-inch water main with fire hydrants is being placed along Kahekili Highway from Ahuimanu Road to Haiku Road and from Kulukeoe Street to Likelike Highway, Likelike Highway from Kahekili Highway to Kamehameha Highway. (Completion by 6/8/02) WS 

Manoa-McCully: Reconstruct Manoa Road, Oahu Avenue, Dole and McCully streets. DC 

Makiki: Mott Smith Drive repaving. (Completion by 8/02) DC 

Moiliili: Install 8-inch water mains on (Completion by 7/02) WS

      Kaaha Street from Kapiolani Boulevard to Kaaloa Street;

      Kaaloa Street from Kaaha Street to Nakookoo Street;

      Nakookoo Street from Kahuna Lane to the end;

      Kahoaloha from Nakookoo Street to Kuulei Lane and Kahuna Lane. 

Pearl City: Reconstruct Waimano Home Road from Komo Mai Drive to end. (Completion by 8/02) DC

        Curb ramps at various locations. (Completion by 5/02) DC

Sunset Beach: Install 12-inch to 16-inch water main along Kamehameha Highway from Paumalu Place to Kahae Road. (Completion by 12/02) WS 

Wahiawa: Rehabilitation of Nonohe Street between California Avenue and Puninoni Street, Puninoni Street and Royal Palm Drive. (Completion by 8/02) DC 

Waialua:  Install water lines along Aikaula, Haona, Kanalu, Kuoha, Naluahi and Nauahi streets and Goodale Avenue. (Completion by 6/02) WS

      Reconstruct Kaukonahua Road between Kamehameha Highway and Wilikina Street and Wailaua Beach Road between Kuoha and Au streets. (Completion by 9/02) DC 

Waianae:  Reconstruction and resurfacing of Lualualei Homestead Road between Pokai Bay Street and Hale Ekahi Drive, Paakea Road, between Hakimo Road and Mailiili Road, and Makaha Valley Road. (Completion by 8/10/02) DC 

Waipahu: Rehabilitate Waipahu Street between Kunia Road and Mahoe Street. (Completion by 8/02) DC

Curb ramp construction at various intersections. (Completion by 5/02) DC 

Parades, Walks, Races & Other Street Closures

Contact Transportation Services:(http://www.co.honolulu.hi.us/dts/usage/events.htm) for the current information. 

April 3, 2002 Wednesday
6:30PM Starts
8:30PM Ends

Salute to Youth Parade sponsored by The World of Pageantry. The event will have 1,000 marchers, 6 vehicles, 2 floats, 12 bands.  It will start at Fort DeRussy, to Kalakaua Ave., to Monsarrat Ave to end at Queen Kapiolani Park. Contact Harvey Berish/John Riggle (Kam. School) at (714) 952-2263 Fax: (714)535-355

April 5, 2002 Friday
10:00AM Starts
11:00AM Ends

CELEBRATION OF Youth Parade sponsored by Polynesian Cultural Center. The event will have 1,000 marchers, 30 vehicles, 5 floats, & 5 bands. It will start: Kalakaua/Saratoga Ave., to Kalakaua Ave.,  to Monsarrat Ave., to end at Queen Kapiolani Park. Contact: Norris Alaiasa 926-2244 Fax: 926-4448

 The above is based on the most current information available from the event organizers as of March 28, 2002 to the Department of Transportation Services.

###

Tuesday, July 09, 2002

© Copyright 2002-2006 City and County of Honolulu, Hawaii
Privacy Statement | Technical Support | Customer Service | Policy | Accessibility | Diversity Statement