February 13, 2003

ROAD WORK WEEKLY REPORT

Scheduled roadwork for the week beginning February 16, 2003, for the Department of Design & Construction. Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

AIEA

Curb ramps —Ulune Street and Wiliko Street:  installing, striping, markings and markers.

 (Estimated completion date, March 2003)

 

EWA

Old Fort Weaver Road, Mokuola Street & North Road Sidewalk Improvements - Old Fort Weaver Road from Farrington Highway to Fort Weaver Road: Construct new asphalt concrete sidewalk, curb, CRM wall, and driveway aprons.

(Estimated completion date, March 2003)

 

HAWAII KAI

6716 Pukoo Street Restoration:  Restore grade, landscape and construct fence.

            (Estimated completion date, February 2003)

 

HONOLULU

Reconstruction of Sidewalks, Ala Moana Area – Alohi Way, Elm Street, Pensacola Street, Piikoi Street, Hoolai Street, Kamaile Street, Alder Street, Birch Street, Cedar Street, Liona Street, Sheridan Street, Keeaumoku Street, Rycroft Street, Lauula Way, Makaloa Street:

Demolish and reconstruct existing concrete sidewalks.

            (Estimated completion date, August 2003)

 

Curb ramps – Pensacola Street/Wilder Avenue, Piikoi Street/Pensacola Street: construct new curb ramps, transitional sidewalks, curbs and gutters and pavement transitions.

            (Estimated completion date, January 2003)

 

Curb ramps – Alakea Street/Merchant Street, Alakea Street/Queen Street, Alakea Street between South King Street & South Beretania Street, Bishop Street/Queen Street:  construct new curb ramps, transitional sidewalks, curbs,and gutters and pavement markings.            (Estimated completion date, March 2003)

 

Rehabilitation of streets - Mooheau Avenue, Nuuanu Avenue, Dole Street and McCully Street: reconstruct road pavement, sidewalks, curbs, gutters and driveways.  Construct curb ramps, bus pads and drainage system.  Relocate and/or adjust existing electrical facilities for HECO, Verizon, traffic signal, street light and appurtenances.  Resurface, adjust manhole frame and cover to new grade and restripe.  Install traffic signs.

(Estimated completion date, April 2003)

 

Curb Ramps - Piikoi Street/Pensacola Street, Beretania Street from Piikoi Street to Waiau Place, Piikoi Street/Kinau Street, Dole Street/East-West Road:  Construct new curb ramps, transitional sidewalks, curbs and gutters, and pavement transitions.

(Estimated completion date, March 2003)

 

Lusitana Street/Ladd Lane Emergency Sewer Line Reconstruction –Lusitana Street between the Pauoa Road Intersection and Auwaiolimu Intersection:  Road will be one-way flowing from Pauoa Road toward Auwaiolimu Street.  Sewer line repair work (cured in place pipe, approximately 160’).

            (Estimated completion date, February 2003)

 

KAILUA

Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive.

(Estimated completion date, December 2003)

 

Oneawa sidewalk improvements, Oneawa Street from Olomana Street to Kawainui Street: construct new asphalt concrete sidewalk, curb ramps, curbs and gutters and pavement markings.                      (Estimated completion date, February 2003)

 

KAIMUKI

Curb ramps – 13th Avenue and Mahina Avenue, 21st Avenue and Pahoa Avenue, Olokele Avenue and Winam Avenue:  install striping, markings and markers.

(Estimated completion date, February 2003)

 

KALIHI

Curb ramps - Houghtailing Street/North King Street/Waiakamilo Road, Bernice Street/Houghtailing Street:  Replace traffic signal system. Construct new curb ramps, sidewalks, curbs, gutters and pavement transition.  Install traffic signs, striping, markings and markers.

(Estimated completion date, February 2003)

Curb ramps - Kapalama Avenue and North School Street, and Houghtailing Street and North School Street:

Construct new curb ramps, sidewalks, and driveways.  Replace traffic signal and streetlight system, traffic signs, striping, markings and markers.

(Estimated completion date, March 2003)

 

 

MAKIKI

Emergency Wall Repair at Kamamalu Avenue – At the Rear of Property 1619 Lusitana Street: Construct foundation and concrete wall with guardrail.  Demolish existing CRM wall and gunite slope.

            (Estimated completion date, February 2003)

 

MILILANI

Rehabilitation of Streets – Kuahelani Avenue and Meheula Avenue: construct new curb ramps, sidewalks, driveways.  Install traffic signal system, streetlight system, traffic signs, striping, markings and markers.

(Estimated completion date, March 2003)

 

MOANALUA

Curb ramps – Mahiole Street (mid-block) between Onipa’a Street and Pineapple Place, Maalahi Street and Mahiole Street: installing striping, markings and markers.

(Estimated completion date, March 2003)

 

NUUANU

Fencing at 2527A  Henry Street:  Cleaning of existing drainage ditch and constructing a debris fence.

                                          (Estimated completion date, February 2003)

 

SALT LAKE

Curb ramps- Ala Akulikuli Street and Ala Laulani Street, Ala Lilikoi Street and Ala Loke Street, Ala Ilima Street and Ala Nioi Place, Ala Makahala Place and Ala Napunani Street, Ala Napunani Street and Ala Poha Place, Ala Napunani Street and Likini Street: install striping, markings and markers.

(Estimated completion date, March 2003)

 

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:

Upgrade roadway to include 2 additional lanes in each direction, with designated left and right turning lanes. Provide traffic controls, mass grading, temporary security fencing and electrical overhead lines, sidewalks, curbs, gutters, curb ramps and property adjustments, including demolishing and reconstructing new structures and constructing new walls. Install detention basins, drainage, water, sewer, traffic signal, streetlights, underground electrical system, oil lines, gas lines, pavement striping, markings and markers, and traffic signs, irrigation and landscaping.

            (Estimated completion date, June 2004)

 

WAHIAWA

Curb Ramps at Various Locations, FY 2001(6) – California Avenue/Rose Street:

Construct new curb ramps, transitional sidewalks, curbs and gutters, and pavement transitions.

            (Estimated completion date, February 2003)

 

 

WAIANAE

Mailiilii Stream Slope Lining Repairs:

Construct new channel lining.  Install new metal guardrail.

(Estimated completion date, February 2003)

 

WAIPAHU

Curb Ramps at - Puamano Place and Waipahu Street: Installing striping, markings and markers.

            (Estimated completion date, March 2003)

 

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

February 16, 2003 Sunday
9:00AM Starts
1:00PM Ends

BRUNCH ON THE BEACH STREET FESTIVAL sponsored by the Waikiki Improvement Assn./C&C Honolulu.  The event is expected to have 5,000+ participants.  Traffic will be diverted starting 3:30 am for setup. The event will close Kalakaua Avenue, all lanes from Kaiulani Avenue to Liliuokalani Avenue. Contact: DTS-TST Div. 527-6009

February 17, 2003 Monday
6:50AM Starts
11:00AM End

GREAT ALOHA RUN 2003 sponsored by Great Aloha Run/Carole Kai Charities. The event is expected to have 26,000 runners. It will start on Nimitz Hwy. at Nuuanu Ave., to Nimitz Hwy., ewa bound, to Kamehameha Hwy then under the H-1 viaduct, to Kamehameha Hwy., to Aloha Stadium service road into the main gate of Aloha Stadium, to finish in the north end zone of Aloha Stadium. Contact Alan Sunio 528-7388.  For more info, visit their website: www.greataloharun.com

 

The above is based on the most current information available from the event organizers as of February 13, 2003. TST Division, Department of Transportation Services Phone: 808-527-6009 Fax: 808-523-4446

 

Thursday, February 13, 2003