August 7, 2003

 

ROAD WORK WEEKLY REPORT

Scheduled roadwork for the week beginning August 10, 2003, for the Department of Design & Construction. Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

 

AIEA

Curb Ramps At Various Locations, - Pali Momi Street and Haukapila Road.  Construct new curb ramps.  Install pedestrian push buttons, pullboxes, striping, marking and markers.

            (Estimated completion date, January 2004)

 

HONOLULU

Rehabilitation of McCully Street: reconstruct road pavement, sidewalks, curbs, gutters and driveways.  Construct curb ramps, bus pads and drainage system.  Relocate and/or adjust existing electrical facilities for HECO, Verizon, traffic signal, street light and appurtenances.  Resurface, adjust manhole frame and cover to new grade and restripe.  Install traffic signs.

(Estimated completion date, August 2003)

 

Monsarrat Avenue Road Rehabilitation: Construct new curb ramp, reconstruct and resurface asphalt pavement, install traffic markings.

            (Estimated completion date, December 2003)

 

Reconstruction of Concrete Sidewalks, Upper Kapahulu Area in Honolulu - Hoohulu Street, Herbert Street, Castle Street, Brokaw Street, Catherine Street, Duval Street, Esther Street, Francis Street, George Street, Hayden Street, James Street, Wela Street, Edna Street, Kepuhi Street, McCorristan Street, Makini Street, Kaunaoa Street, Hinano Street, Lakimau Street, Hollinger Street, Leahi Street, Paki Avenue, Kanaina Ave., Campbell Avenue, Winam Ave., Trousseau Street, Alohea Street, and Monsarrat Avenue: Remove and reconstruct damaged concrete sidewalks, trim street trees and cut and remove tree roots, install root barriers, and adjust utility boxes to new grade.

            (Estimated completion date, April 2004)

 

KAILUA

Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive.

(Estimated completion date, January 2005)

 

Kalaheo Avenue Reconstructed Sewer, from Kainalu Drive to Dune Circle: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6 p.m.  During non-work hours, one lane for northbound traffic along Kalaheo Avenue will be re-opened with the other lane closed as an on-site staging are for equipment.

                                    (Estimated completion date, March 2004)

 

KAIMUKI

Curb ramps 13th Avenue and Mahina Avenue, 21st Avenue and Pahoa Avenue, Olokele Avenue and Winam Avenue:  install striping, markings and markers.

(Estimated completion date, July 2003)

LAIE

Kahawainui Stream Flood Control Project - Poohaili Street Improvements: Construction of roadway, including grading, installation of guardrails and steel posts, and asphaltic concrete paving.

            (Estimated completion date, August 2003)

 

MAKIKI

Mott-Smith Drive, Pensacola Street and Makiki Street Sidewalk Improvements: Construct new sidewalks, curb ramps, driveways, curbs, gutters, walls, pavement restoration and and install traffic signs.

            (Estimated completion date, January 2004)

 

MILILANI

Kamehameha Highway Trunk Sewer Reconstruction: Work along Kamehameha Highway in Mililani from Meheula Parkway to Hokuioli Street.

            (Estimated completion date, October 2003)

 

MOANALUA

Curb Ramps - Maalahi Street and Mahiole Street: Remedial A.C. pavement patch work.

            (Estimated completion date, July 2003)

 

PEARL CITY

Rehabilitation of Streets - Hoolaulea Street from Waimano Home Road to Hookahi Street: Adjust utility covers.

            (Estimated completion date, August 2003)

 

SALT LAKE

Curb ramps - Ala Ilima Street and Ala Nioi Place, Ala Napunani Street and Likini Street: remedial A.C. pavement work.

            (Estimated completion date, July 2003)

 

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:

Upgrade roadway to include 2 additional lanes in each direction, with designated left and right turning lanes. Provide traffic controls, mass grading, temporary security fencing and electrical overhead lines, sidewalks, curbs, gutters, curb ramps and property adjustments, including demolishing and reconstructing new structures and constructing new walls. Install detention basins, drainage, water, sewer, traffic signal, streetlights, underground electrical system, oil lines, gas lines, pavement striping, markings and markers, and traffic signs, irrigation and landscaping.

            (Estimated completion date, June 2004)

 

WAHIAWA

Curb Ramps at Various Locations, FY 2001(6) California Avenue/Rose Street: construct new curb ramps, transitional sidewalks, curbs and gutters, and pavement transitions.

            (Estimated completion date, October 2003)

 

WAIALUA

Waialua Beach Road Sidewalk Improvements, Phase I Install new sidewalks, curb ramps, walls, drain system, curbs, gutters, pavement restoration, irrigation system, landscaping and traffic signs.

            (Estimated completion date, August 2003)

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

 

No events scheduled this week.

 

The above is based on the most current information available from the event organizers as of date on bottom. TST Division, Department of Transportation Services Phone: 808-527-6009 Fax: 808-523-4446.

Thursday, August 07, 2003