May 1, 2003 ROAD WORK WEEKLY REPORT Scheduled roadwork for the week beginning May 4, 2003, for the Department of Design & Construction. Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted. HONOLULU Rehabilitation of Streets - Dillingham Boulevard from King Street to Waiakamilo Street: Pavement Markings. (Estimated completion date, April 2003) Reconstruction of Sidewalks, Ala Moana Area – Alohi Way, Elm Street, Pensacola Street, Piikoi Street, Hoolai Street, Kamaile Street, Alder Street, Birch Street, Cedar Street, Liona Street, Sheridan Street, Keeaumoku Street, Rycroft Street, Lauula Way, Makaloa Street: Demolish and reconstruct existing concrete sidewalks. (Estimated completion date, August 2003) Rehabilitation of streets - Nuuanu Avenue and McCully Street: reconstruct road pavement, sidewalks, curbs, gutters and driveways. Construct curb ramps, bus pads and drainage system. Relocate and/or adjust existing electrical facilities for HECO, Verizon, traffic signal, street light and appurtenances. Resurface, adjust manhole frame and cover to new grade and restripe. Install traffic signs. (Estimated completion date, April 2003) KAILUA Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive. (Estimated completion date, April 2003) Kalaheo Avenue Reconstructed Sewer, from Kainalu Drive to Dune Circle: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6 p.m. During non-work hours, one lane for northbound traffic along Kalaheo Avenue will be re-opened with the other lane closed as an on-site staging are for equipment. (Estimated completion date, March 2004) KAIMUKI Curb ramps – 13th Avenue and Mahina Avenue, 21st Avenue and Pahoa Avenue, Olokele Avenue and Winam Avenue: install striping, markings and markers. (Estimated completion date, April 2003) KALIHI Emergency Sewer Repair: Amelia Street/Kalihi Stream (March 17, 2003 to May 2, 2003) Curb Ramps - Bernice Street and Kapalama Avenue, Kapalama Place and Palapala Place, Kapalama Avenue and North School Street, Houghtailing Street and North School Street: Construct new curb ramps, sidewalks, and driveways. Replace traffic signal and streetlight system, traffic signs, striping, markings and markers. (Estimated completion date, April 2003) LAIE Kahawainui Stream Flood Control Project - Poohaili Street Improvements: Construction of roadway, including grading, installation of guardrails and steel posts, and asphaltic concrete paving. (Estimated completion date, August 2003) MAKIKI Curb Ramps at Various Locations - Piikoi Street and Wilder Avenue, Liholiho Street and Wilder Avenue: Construct new curb ramps and sidewalks. Replace traffic signal system, traffic signs, striping, marking and markers. (Estimated completion date, April 2003) MILILANI Rehabilitation of Streets - Kuahelani Avenue and Meheula Avenue: Construct new curb ramps, sidewalks, driveways. Install traffic signal system, streetlight system, traffic signs, striping, markings and markers. (Estimated completion date, May 2003) MOANALUA Curb Ramps - Maalahi Street and Mahiole Street: Remedial A.C. pavement patch work. (Estimated completion date, April 2003) SALT LAKE Rehabilitation of Streets - Hoolaulea Street from Waimano Home Road to Hookahi Street: Asphalt pavement markings. (Estimated completion date, April 2003) Curb ramps - Ala Ilima Street and Ala Nioi Place, Ala Napunani Street and Likini Street: install striping, markings and markers. (Estimated completion date, April 2003) Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street: Upgrade roadway to include 2 additional lanes in each direction, with designated left and right turning lanes. Provide traffic controls, mass grading, temporary security fencing and electrical overhead lines, sidewalks, curbs, gutters, curb ramps and property adjustments, including demolishing and reconstructing new structures and constructing new walls. Install detention basins, drainage, water, sewer, traffic signal, streetlights, underground electrical system, oil lines, gas lines, pavement striping, markings and markers, and traffic signs, irrigation and landscaping. (Estimated completion date, June 2004) WAIALUA Waialua Beach Road Sidewalk Improvements, Phase I – Install new sidewalks, curb ramps, walls, drain system, curbs, gutters, pavement restoration, irrigation system, landscaping and traffic signs. (Estimated completion date, August 2003) PARADES, WALKS, RACES & OTHER STREET CLOSURES
The above is based on the most current information available from the event organizers as of 4/24/03. TST Division, Department of Transportation Services Phone: 808-527-6009 Fax: 808-523-4446. |
|||||
| Thursday, May 01, 2003 |