You are here:  Main / Customer Services / Public Communications Division / Honolulu News Releases 2004 / Road Work Weekly Report

ROAD WORK WEEKLY REPORT

 

Scheduled roadwork for the week beginning May 23, 2004, for the Department of Design & Construction. Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

EWA

Curb Ramps at - Papipi Road & Papipi Place, Koka Street & Kolowaka Drive, Waimomona Place & Kolowaka Drive, Waihua Place & Kolowaka Drive, Waiapo Place & Kolowaka Drive, Wailewa Place & Kolowaka Drive, Poowai Place & Kolowaka Drive, Pahika Street & Renton Road, Renton Road at West Loch Villages: Construct new curb ramps, sidewalk transition and pavement markings.

            (Estimated completion date, May 2004)

 

HONOLULU

Curb Ramps at - Iolani Avenue & Miller Street, Iolani Avenue & Pele Street: Construct new curb ramps, sidewalk transition and pavement markings.

            (Estimated completion date, April 2004)

 

Curb ramps at Kalakaua Avenue/Keoniana Street, Lewers Street/Aloha Drive, Royal Hawaiian Avenue/Lauula Street, Aloha Drive/Royal Hawaiian Avenue, Royal Hawaiian Avenue/Manukai Street, Seaside Avenue/Lauula Street, Aloha Drive/Seaside Avenue and Kaiulani Avenue/Koa Avenue, Kaiulani Avenue/Tusitala Street/Uluniu Avenue/Koa Avenue, Liliuokalani Avenue/Mountain View Drive, Paoakalani Avenue/Lemon Road, Paoakalani Avenjue/Pualani Way, Winam Avenue/Ekela Avenue, Kapahulu Avenue/Paliuli Street, Kapahulu Avenue/Hoolulu Street:  construct new curb ramps, sidewalks, driveways.  Install striping, marking and markers.

(Estimated completion date, August 2004)

 

Resurfacing of a Portion of King Street South Street to McCully Street: Reconstruction and resurfacing of asphalt roadways (night work), adjustment of utility manholes and installation of permanent pavement markings (day work).

            (Estimated completion date, September 2004)

 

Emergency Resurfacing of Kuakini Street Lanikila Avenue and Pali Highway: utility manhole adjustment.

            (Estimated completion date, April 2004)

 

Rehabilitation of McCully Street:  Reconstruct road pavement, sidewalks, curbs, gutters and driveways.  Construct curb ramps, bus pads and drainage system.  Relocate and/or adjust existing electrical facilities for HECO, Verizon, traffic signal, street light and appurtenances.  Resurface, adjust manhole frame and cover to new grade and restripe.  Install traffic signs.

(Estimated completion date, July 2004)

 

Monsarrat Avenue Road Rehabilitation, BWS Job No. 02-0595: Install pavement markings and adjust manhole utility to grade.             (Estimated completion date, April 2004)

 

Emergency Resurfacing of Nuuanu Avenue - School Street to King Street: Reconstruction and resurfacing of asphalt pavement, utility manhole adjustment, pavement markings and traffic loop sensors.

            (Estimated completion date, May 2004)

 

Palolo Avenue Water System Improvements, Part I:  Ahinahina Place, Hoanoho Place, Kanekopa Place, Kehau Place, Kekona Place, Kilihune Place, Paliahina Place, Palolo Terrace Place, Uilani Place, Wiliana Place and Palolo Avenue from Waialae Avenue to Kilihune Place.  Cold mill and resurface roadway, adjust utility manholes to grade and install pavement markings.

            (Estimated completion date, May 2004)

 

Curb Ramps at Pensacola Street/Wilder Avenue: Construct new sidewalks.

            (Estimated completion date, June 2004)

 

Rehabilitation of St. Louis Drive, Dole Street, Frank Street, Eugene Place, Alphonse Place, Robert Place, Maigret Street:  Installation of water mains, hydrants & service materials.  Reconstruction and resurfacing of roadway, installation of pavement markings.

            (Estimated completion date, February 2005)

 

KAILUA

Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive.

(Estimated completion date, January 2005)

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Dune Circle: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6 p.m.  During non-work hours, one lane for northbound traffic along Kalaheo Avenue will be re-opened with the other lane closed as an on-site staging are for equipment.

 

KAIMUKI

Curb Ramps at - 13th Avenue & Mahina Avenue, 21st Avenue & Pahoa Avenue, Olokele Avenue & Winam Avenue: Complete minor curb ramp and pavement deficiencies.

            (Estimated completion date, May 2004)

 

KAKAAKO

Curb Ramps at - Mission Lane & Queen Street, Keawe Street & Queen Street, Emily Street & Kawaiahao Street: Construct new curb ramps, sidewalk transition and pavement markings.

            (Estimated completion date, May 2004)

 

KANEOHE

Curb Ramps at - Kahuhipa Street & Lolii Street, Kahuhipa Street & Kawa Street, Haiku Road & Heeia Street, Haiku Road & Ohala Street: Construct new curb ramps, sidewalk transition and pavement markings.

            (Estimated completion date, May 2004)

 

Lulani Street Water Systems Improvements, BWS Job No. 02-059M:  Lulani Street, Lulani Place & portions of Kamehameha Highway between Lulani Street to Laenani Drive. Roadway resurfacing and pavement marking restoration.

            (Estimated completion date, May 2004)

 

MCCULLY

Reconstruction of Concrete Sidewalks - University Avenue, Algaroba Street, Wiliwili Street, Makahiki Way, Waiola Street, Waiola Way, Paani Street, Citron Street, Fern Street, Hoawa Street, Lime Street, Coolidge Street, and Date Street: Remove and reconstruct concrete sidewalks, curbs and gutters, trim street trees and cut and remove tree roots, install root barriers, and adjust utility boxes to new grade.

            (Estimated completion date, May 2004)

 

MILILANI

Curb Ramps at Aaahi Street & Aaahi Place, Aaahi Street & Elau Place, Aaahi Street & Kupulau Place, Ahiku Street & Lanikuhana Avenue, Ahiku Street & Ualalehu Street, Kaloapau Street & Kehepue Loop, Kailiula Loop & Kaloapau Street Kipapa Drive & Wehewehe Loop, Kipapa Drive & Nawenewene Circle, Kanamee Street & Noholoholo Street, Kipapa Drive at Mililani Shopping Center, Kipapa Drive at Jack in the Box, Kipapa Drive & Wainihi Street, Wakalani Drive &  Waikalani Place, Ainamakua Drive & Ainamakua Drive, Ainamakua Drive & Meheula Parkway, Ukuwai Street & Makaikai Street, Ainamakua Drive & Meheula Parkway, Ukuwai Street & Makaikai Street, Ainamakua Drive & Makaikai Street, Kaapeha Drive & Meheula Parkway, Koolani Drive & Meheula Parkway:  Construct new curb ramps, pedestrian push button, sidewalk transition and pavement markings.

            (Estimated completion date, June 2004)

 

Kamehameha Highway Trunk Sewer Reconstruction: Work along Kamehameha Highway in Mililani from Meheula Parkway to Hokuioli Street.

(Estimated completion date, April 2004)

 

MOANALUA

Curb Ramps at - Ala Ilima Street & Ala Nioi Place, Ala Napunani Street & Likini Street, Maalahi Street & Mahiole Street: Complete minor curb ramp and pavement deficiencies.

            (Estimated completion date, May 2004)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:

Upgrade roadway to include 2 additional lanes in each direction, with designated left and right turning lanes. Provide traffic controls, mass grading, temporary security fencing and electrical overhead lines, sidewalks, curbs, gutters, curb ramps and property adjustments, including demolishing and reconstructing new structures and constructing new walls. Install detention basins, drainage, water, sewer, traffic signal, streetlights, underground electrical system, oil lines, gas lines, pavement striping, markings and markers, and traffic signs, irrigation and landscaping.

            (Estimated completion date, July 2004)

 

WAIKELE

Curb Ramps at Various Locations, FY 2002(3) Aoku Street & Lumiauau Street, Alau Street & Lumiauau Street, Pulelo Street & Lumiaina Street, Paiwa Street & Pakela Street: Construct new curb ramps, sidewalk transition and pavement markings.     (Estimated completion date, May 2004)

 

WAIPAHU

Curb Ramps at - Kupuna Loop & Kupuohi Street (both intersections), Kaaholo Street & Kaaoki Place:  Construct new curb ramps, sidewalk transition and pavement markings.

            (Estimated completion date, May 2004

 

Hikimoe Street Improvements for City Express Bus Service Waipahu Depot Road to Mokuola Street:  Reconstruction of concrete roadway pavement, bus shelters, restroom facilities, and street lighting.

            (Estimated completion date, June 2004)

 

Village Park Connector Road: Construction of a two-way connector road between Kupuna Loop in Village Park and Loaa Street in Waipahu.  Work includes roadway grading, construction of roadways, sidewalks, curb ramps and CRM and CMU walls; and installation of water lines, drain lines, electrical lines, streetlights, irrigation lines and landscaping.

            (Estimated completion date, March 2005)

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

 

May 28, 2004 Friday to

May 31, 2004 Monday

5:00AM Starts

7:30PM Ends

MEMORIAL DAY PARKING RESTRICTIONS sponsored by City and County of Honolulu.  Parking will be prohibited on: 1) PUOWAINA DRIVE, both sides, between Hookui Street and the gates to the National Memorial Cemetery of the Pacific at Punchbowl., 2) HOOKUI STREET, both sides, between Puowaina Drive and Auwaiolimu Street. Contact: DTS-TST Div. 527-6009

 

May 29, 2004 Saturday to

May 31, 2004 Monday

6:30AM Starts

5:30PM Ends

MEMORIAL DAY PARKING RESTRICTIONS sponsored by City and County of Honolulu.   Parking will be prohibited on: 1) AIPO LANE, both sides. 2) NUUANU AVENUE, Ewa side, Robinson Lane to Judd Street, 3) ROBINSON LANE, both sides, 4) 22nd AVENUE, Ewa side, 100 feet in both direction from the driveway of Diamond Head Memorial Park, 5) EAST MANOA ROAD, Koko Head side, from the makai apex of the triangle to the gates of the Old Chinese Cemetery,  6) CRAIGSIDE PLACE, mauka side, from Nuuanu Avenue to the driveway into Nuuanu Memorial Park. Contact: DTS-TST Div. 527-6009.

 

The above is based on the most current information available.  TST Division, Department of Transportation Services  Phone: 808-527-6009  Fax: 808-523-4446.

- 30 -

Thursday, May 20, 2004

© Copyright 2002-2006 City and County of Honolulu, Hawaii
Privacy Statement | Technical Support | Customer Service | Policy | Accessibility | Diversity Statement