ROAD WORK WEEKLY REPORT

 

Scheduled roadwork for the week beginning April 4, 2004, for the Department of Design & Construction. Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

AHUIMANU

Curb Ramps At - Hui Aeko Place & Hui Aeko Way: Construct new curb ramps, sidewalk transition and pavement markings.

            (Estimated completion date, July 2004)

 

EWA

Curb Ramps at - Papipi Road & Papipi Place, Koka Street & Kolowaka Drive, Waimomona Place & Kolowaka Drive, Waihua Place & Kolowaka Drive, Waiapo Place & Kolowaka Drive, Wailewa Place & Kolowaka Drive, Poowai Place & Kolowaka Drive, Pahika Street & Renton Road, Renton Road at West Loch Villages: Construct new curb ramps, sidewalk transition and pavement markings.

            (Estimated completion date, July 2004)

 

HAWAII KAI

Curb Ramps at - Ani Street and Hind Iuka Drive, Puamamane Street and Ulua Street, Kawaihae Street and Keokea Place, Pepeekeo Street Mauka, Pepeekeo Street Makai, Lunalilo Home Road and Poipu Drive, Kalakua Street and Lunalilo Home Road, Kapaia Street and Lunalilo Home Road, Ahukini Street and Hawaii Kai Drive, Mokuhano Street and Namahealani Place:  Construct new curb ramps, sidewalks, driveways.  Install pedestrian push buttons, pullboxes and loops, striping, marking and markers.

            (Estimated completion date, April 2004)

 

Lunalilo Home Road Improvements Lunalilo Home Road from Kalanianaole Highway to Kalakua Street: Maintenance of  landscaping and irrigation.

            (Estimated completion date, April 2004)  

 

HONOLULU

Emergency Resurfacing of Puowaina Drive - Puowaina Drive (Lusitana Street to Makiki Heights Drive): Asphalt resurfacing, utility manhole adjustment, and pavement markings.

            (Estimated completion date, April 2004)

 

Monsarrat Avenue Road Rehabilitation, BWS Job No. 02-0595: Install pavement markings and adjust manhole utility to grade.             (Estimated completion date, April 2004)

 

Emergency Resurfacing of Kuakini Street Lanikila Avenue and Pali Highway and Lanikila Street to Pali Highway: Asphalt resurfacing, utility manhole adjustment, and pavement markings.

            (Estimated completion date, March 2004)

 

Resurfacing of a Portion of Dillingham Boulevard Waiakamilo Street to Middle Street:

Cold milling and asphalt resurfacing (night work), adjustment of utility manholes and permanent pavement markings (day work).

            (Estimated completion date, June 2004

 

Emergency Resurfacing of Young Street Keeaumoku Street to Pensacola Street:

Asphalt resurfacing, utility manhole adjustments, and pavement markings.

            (Estimated completion date, March 2004)

 

Kiwila Street/10th Avenue Reconstructed Sewer: Remove old 6-inch line and install 8-inch line on 10th Avenue.  Excavation, backfilling, repaving, road striping, concrete jacketing and sewer lateral reinstatement.

            (Estimated completion date, October 2004)

 

Kalakaua Avenue/Keoniana Street, Lewers Street/Aloha Drive, Royal Hawaiian Avenue/Lauula Street, Aloha Drive/Royal Hawaiian Avenue, Royal Hawaiian Avenue/Manukai Street, Seaside Avenue/Lauula Street, Aloha Drive/Seaside Avenue and Kaiulani Avenue/Koa Avenue, Kaiulani Avenue/Tusitala Street/Uluniu Avenue/Koa Avenue, Liliuokalani Avenue/Mountain View Drive, Paoakalani Avenue/Lemon Road, Paoakalani Avenjue/Pualani Way, Winam Avenue/Ekela Avenue, Kapahulu Avenue/Paliuli Street, Kapahulu Avenue/Hoolulu Street:  construct new curb ramps, sidewalks, driveways.  Install striping, marking and markers.

(Estimated completion date, June 2004)

 

Palolo Avenue Water System Improvements, Part I:  Ahinahina Place, Hoanoho Place, Kanekopa Place, Kehau Place, Kekona Place, Kilihune Place, Paliahina Place, Palolo Terrace Place, Uilani Place, Wiliana Place and Palolo Avenue from Waialae Avenue to Kilihune Place.  Cold mill and resurface roadway, adjust utility manholes to grade and install pavement markings.

            (Estimated completion date, March 2004)

 

Curb Ramps at Pensacola Street/Wilder Avenue: Construct new curb ramps, transitional sidewalks, curbs and gutters, and pavement transitions.

            (Estimated completion date, March 2004)

 

Rehabilitation of St. Louis Drive, Dole Street, Frank Street, Eugene Place, Alphonse Place, Robert Place, Maigret Street:  Installation of water mains, hydrants & service materials.  Reconstruction and resurfacing of roadway, installation of pavement markings.

            (Estimated completion date, February 2005)

 

Reconstruction of Concrete Sidewalks, Upper Kapahulu Area in Honolulu - Hoohulu Street, Herbert Street, Castle Street, Brokaw Street, Catherine Street, Duval Street, Esther Street, Francis Street, George Street, Hayden Street, James Street, Wela Street, Edna Street, Kepuhi Street, McCorristan Street, Makini Street, Kaunaoa Street, Hinano Street, Lakimau Street, Hollinger Street, Leahi Street, Paki Avenue, Kanaina Ave., Campbell Avenue, Winam Ave., Trousseau Street, Alohea Street, and Monsarrat Avenue: Remove and reconstruct damaged concrete sidewalks, trim street trees and cut and remove tree roots, install root barriers, and adjust utility boxes to new grade.

            (Estimated completion date, April 2004)

 

Rehabilitation of McCully Street:  Reconstruct road pavement, sidewalks, curbs, gutters and driveways.  Construct curb ramps, bus pads and drainage system.  Relocate and/or adjust existing electrical facilities for HECO, Verizon, traffic signal, street light and appurtenances.  Resurface, adjust manhole frame and cover to new grade and restripe.  Install traffic signs.

(Estimated completion date, April 2004)

 

Reconstruction of Concrete Sidewalks, Lower University Avenue & Kapahulu Areas Hihiwai Street, Kamoku Street, Lauiki Street, University Avenue, Date Street, Kaimuki Avenue, Leialoha Avenue, Okokele Avenue, Lukepane Street, Ekela Avenue, Makaleka Avenue, Palani Avenue, Kamuela Avenue, Winam Avenue & Kapahulu Avenue: Demolish and reconstruct damaged concrete sidewalks, trim street trees and cut and remove tree roots, install root barriers, and adjust utility boxes to new grade.

(Estimate completion date, May 2004)

 

Resurfacing of a Portion of King Street South Street to McCully Street: Reconstruction and resurfacing of asphalt roadways (night work), adjustment of utility manholes and installation of permanent pavement markings (day work)

            (Estimated completion date, September 2004)

 

KAILUA

Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive.

(Estimated completion date, January 2005)

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Dune Circle: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6 p.m.  During non-work hours, one lane for northbound traffic along Kalaheo Avenue will be re-opened with the other lane closed as an on-site staging are for equipment.

            (Estimated completion date, March 2004)

 

KAIMUKI

Curb Ramps at - 13th Avenue & Mahina Avenue, 21st Avenue & Pahoa Avenue, Olokele Avenue & Winam Avenue: Complete minor curb ramp and pavement deficiencies.

            (Estimated completion date, May 2004)

 

KANEOHE

Lulani Street Water Systems Improvements, BWS Job No. 02-059M:  Lulani Street, Lulani Place & portions of Kamehameha Highway between Lulani Street to Laenani Drive. Roadway resurfacing and pavement marking restoration.

            (Estimated completion date, March 2004)

 

MAKAKILO

Curb Ramps at Various Locations, FY 2002(3) Panana Street & Ulele Place: Construct new curb ramps, sidewalk transition and pavement markings.

            (Estimated completion date, July 2004)

 

MCCULLY

Reconstruction of Concrete Sidewalks - University Avenue, Algaroba Street, Wiliwili Street, Makahiki Way, Waiola Street, Waiola Way, Paani Street, Citron Street, Fern Street, Hoawa Street, Lime Street, Coolidge Street, and Date Street: Remove and reconstruct concrete sidewalks, curbs and gutters, trim street trees and cut and remove tree roots, install root barriers, and adjust utility boxes to new grade.

            (Estimated completion date, April 2004)

 

MILILANI

Rehabilitation of Streets - Kuahelani Avenue and Meheula Avenue:  Construct new curb ramps, sidewalks, driveways.  Install traffic signal system, streetlight system, traffic signs, striping, markings and markers.

(Estimated completion date, April 2004)

 

Kamehameha Highway Trunk Sewer Reconstruction: Work along Kamehameha Highway in Mililani from Meheula Parkway to Hokuioli Street.

(Estimated completion date, March 2004)

 

Curb Ramps at - Aaahi Street and Aaahi Place, Aaahi Street and Elau Place, Aaahi Street and Kupulau Place, Ahiku Street and Lanikuhana Avenue, Ahiku Street and Ualalehu Street, Kaloapau Street and Kehepue Loop, Kailiula Loop and Kaloapau Street, Kipapa Drive and Wehewehe Loop, Kipapa Drive and Nawenewene Circle, Kanamee Street and Noholoholo Street, Kipapa Drive at Mililani Shopping Center, Kipapa Drive at Jack in the Box, Kipapa Drive and Wainihi Street, Wakalani Drive and Waikalani Place, Ainamakua Drive and Ainamakua Drive, Ainamakua Drive and Meheula Parkway, Ukuwai Street and Makaikai Street, Ainamakua Drive and Meheula Parkway, Ukuwai Street and Makaikai Street, Ainamakua Drive and Makaikai Street, Kaapeha Drive and Meheula Parkway, Koolani Drive and Meheula Parkway:  Construct new curb ramps, pedestrian push button, sidewalk transition and pavement markings.

            (Estimated completion date, April 2004)

 

MOANALUA

Curb Ramps at - Ala Ilima Street & Ala Nioi Place, Ala Napunani Street & Likini Street, Maalahi Street & Mahiole Street: Complete minor curb ramp and pavement deficiencies.

            (Estimated completion date, May 2004)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:

Upgrade roadway to include 2 additional lanes in each direction, with designated left and right turning lanes. Provide traffic controls, mass grading, temporary security fencing and electrical overhead lines, sidewalks, curbs, gutters, curb ramps and property adjustments, including demolishing and reconstructing new structures and constructing new walls. Install detention basins, drainage, water, sewer, traffic signal, streetlights, underground electrical system, oil lines, gas lines, pavement striping, markings and markers, and traffic signs, irrigation and landscaping.

            (Estimated completion date, July 2004)

 

WAIKELE

Curb Ramps at Various Locations, FY 2002(3) Aoku Street & Lumiauau Street, Alau Street & Lumiauau Street, Pulelo Street & Lumiaina Street, Paiwa Street & Pakela Street: Construct new curb ramps, sidewalk transition and pavement markings.

            (Estimated completion date, July 2004)

 

WAIPAHU

Hikimoe Street Improvements for City Express Bus Service Waipahu Depot Road to Mokuola Street:

Reconstruction of concrete roadway pavement, bus shelters, restroom facilities, and street lighting.

            (Estimated completion date, June 2004)

 

Village Park Connector Road: Construction of a two-way connector road between Kupuna Loop in Village Park and Loaa Street in Waipahu.  Work includes roadway grading, construction of roadways, sidewalks, curb ramps and CRM and CMU walls; and installation of water lines, drain lines, electrical lines, streetlights, irrigation lines and landscaping. (Estimated completion date, March 2005)

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

 

April 4, 2004 Sunday
7:00AM Starts
9:00AM Ends

RACE AGAINST VIOLENCE 5K RUN sponsored by Faerber's Flyer's/RRCA. The event is expected to have 300 runners. It will start at Manoa Rec Center, to Manoa Rd., to Pawaina St., to Pakanu St., to E. Manoa Rd., to Oahu Ave., to Lowrey Ave., to Kaaipu Ave., and finish at Manoa Rec Center. Contact: Joan Ushijima  971-2525

 

April 4, 2004 Sunday
8:00AM Starts
9:00AM Ends

PALM SUNDAY Parade sponsored by Kaumakapili Church.The event will have 100 marchers. It will start at staging area near Honolulu Tower, to N. Beretania St., to Aala St., to Vineyard Blvd. (makai side near median), to Liliha St., to King St.- to end at Kaumakapili Church (766 King St.)  Contact: Pat Medeiros 845-0908

 

April 8, 2004 Thursday
6:30PM Starts
8:00PM Ends

CELEBRATION OF Youth Parade sponsored by PPF Hawaii. The event will have 100 marchers, 8 vehicles, 1 float, 5 bands.  It will start at Fort DeRussy, to Kalakaua Ave., to Kalakaua Ave., kkhd on Kalakaua Ave.,to Monsarrat Ave to end at Queen Kapiolani Park. Contact: Norris Alaiasa 478-9812  Fax: 926-4448  Email:  Norris@presenthawaii.

 

The above is based on the most current information available.  TST Division, Department of Transportation Services  Phone: 808-527-6009  Fax: 808-523-4446.