You are here:  Main / Customer Services / Public Communications Division / Honolulu News Releases 2004 / Road Work Weekly Report

ROAD WORK WEEKLY REPORT

 

Scheduled roadwork for the week beginning February 15, 2004, for the Department of Design & Construction. Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

HAWAII KAI

Curb Ramps at Kawaihae Street and Keokea Place, and Ahukini Street and Hawaii Kai Drive:construct new curb ramps, sidewalks, driveways.  Install pedestrian push buttons, pullboxes and loops, striping, marking and markers.

            (Estimated completion date, January 2004)

 

HONOLULU

Ala Moana Boulevard Beautification, Kalia Road to Kalakaua Avenue:  Install landscape planting and irrigation system in the median.

            (Estimated completion date, February 2004)

 

Beretania Street - University Avenue to North King Street: Emergency resurfacing, utility manhole adjustment, and pavement markings.

            (Estimated completion date, January 2004)

 

Emergency Resurfacing of Kalakaua Avenue King Street to Ena Road: Asphalt resurfacing, utility manhole adjustment, and pavement markings.

            (Estimated completion date, February 2004)

 

Emergency Resurfacing of Piikoi Street Ala Moana Boulevard to Kapiolani Boulevard: Asphalt resurfacing, utility manhole adjustment, and pavement markings.

            (Estimated completion date, February 2004)

 

Emergency Resurfacing of a Portion of Dillingham Boulevard Waiakamilo Street to Middle Street:

Cold milling and asphalt resurfacing (night work), adjustment of utility manholes and permanent pavement markings (day work).

            (Estimated completion date, June 2004

 

Kapiolani Boulevard Ward to Kaheka Street: Emergency resurfacing, utility manhole adjustments and pavement markings.

            (Estimated completion date, February 2004)

 

Kiwila Street/10th Avenue Reconstructed Sewer: Remove old 6-inch line and install 8-inch line on 10th Avenue.  Excavation, backfilling, repaving, road striping, concrete jacketing and sewer lateral reinstatement.

            (Estimated completion date, October 2004)

 

Monsarrat Avenue Road Rehabilitation: Construct new curb ramp, reconstruct and resurface asphalt pavement, install traffic markings.

            (Estimated completion date, February 2004)

 

Kalakaua Avenue/Keoniana Street, Lewers Street/Aloha Drive, Royal Hawaiian Avenue/Lauula Street, Aloha Drive/Royal Hawaiian Avenue, Royal Hawaiian Avenue/Manukai Street, Seaside Avenue/Lauula Street, Aloha Drive/Seaside Avenue and Kaiulani Avenue/Koa Avenue, Kaiulani Avenue/Tusitala Street/Uluniu Avenue/Koa Avenue, Liliuokalani Avenue/Mountain View Drive, Paoakalani Avenue/Lemon Road, Paoakalani Avenjue/Pualani Way, Winam Avenue/Ekela Avenue, Kapahulu Avenue/Paliuli Street, Kapahulu Avenue/Hoolulu Street:  construct new curb ramps, sidewalks, driveways.  Install striping, marking and markers.

(Estimated completion date, June 2004)

 

Palolo Avenue Water System Improvements, Part I:  Ahinahina Place, Hoanoho Place, Kanekopa Place, Kehau Place, Kekona Place, Kilihune Place, Paliahina Place, Palolo Terrace Place, Uilani Place, Wiliana Place and Palolo Avenue from Waialae Avenue to Kilihune Place.  Cold mill and resurface roadway, adjust utility manholes to grade and install pavement markings.

            (Estimated completion date, February 2004)

 

Curb Ramps at Pensacola Street/Wilder Avenue: Construct new curb ramps, transitional sidewalks, curbs and gutters, and pavement transitions.

            (Estimated completion date, March 2004)

 

Rehabilitation of St. Louis Drive, Dole Street, Frank Street, Eugene Place, Alphonse Place, Robert Place, Maigret Street:  Installation of water mains, hydrants & service materials.  Reconstruction and resurfacing of roadway, installation of pavement markings.

            (Estimated completion date, September 2004)

 

Reconstruction of Concrete Sidewalks, Upper Kapahulu Area in Honolulu - Hoohulu Street, Herbert Street, Castle Street, Brokaw Street, Catherine Street, Duval Street, Esther Street, Francis Street, George Street, Hayden Street, James Street, Wela Street, Edna Street, Kepuhi Street, McCorristan Street, Makini Street, Kaunaoa Street, Hinano Street, Lakimau Street, Hollinger Street, Leahi Street, Paki Avenue, Kanaina Ave., Campbell Avenue, Winam Ave., Trousseau Street, Alohea Street, and Monsarrat Avenue: Remove and reconstruct damaged concrete sidewalks, trim street trees and cut and remove tree roots, install root barriers, and adjust utility boxes to new grade.

            (Estimated completion date, April 2004)

 

Reconstruction of Concrete Sidewalks, Lower University Avenue and Kapahulu Areas Hihiwai Street, Kamoku Street, Lauiki Street, University Avenue, Date Street, Kaimuki Avenue, Leialoha Avenue, Okokele Avenue, Lukepane Street, Ekela Avenue, Makaleka Avenue, Palani Avenue, Kamuela Avenue, Winam Avenue and Kapahulu Avenue: Demolish and reconstruct damaged concrete sidewalks, trim street trees and cut and remove tree roots, install root barriers, and adjust utility boxes to new grade.

(Estimate completion date, May 2004)

 

Rehabilitation of McCully Street:  Reconstruct road pavement, sidewalks, curbs, gutters and driveways.  Construct curb ramps, bus pads and drainage system.  Relocate and/or adjust existing electrical facilities for HECO, Verizon, traffic signal, street light and appurtenances.  Resurface, adjust manhole frame and cover to new grade and restripe.  Install traffic signs.

            (Estimated completion date, April 2004)

 

KAILUA

Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive.  (Estimated completion date, January 2005)

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Dune Circle: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6 p.m.  During non-work hours, one lane for northbound traffic along Kalaheo Avenue will be re-opened with the other lane closed as an on-site staging are for equipment.

            (Estimated completion date, March 2004)

 

KANEOHE

Lulani Street Water Systems Improvements:  Lulani Street, Lulani Place & portions of Kamehameha Highway between Lulani Street to Laenani Drive.  Roadway resurfacing and pavement marking restoration.

            (Estimated completion date, February 2004)

 

MAKAHA

Lahilahi Street, Upena Street:  Reconstruct and resurface asphalt pavement, adjust utility manholes, and install pavement markings.

            (Estimated completion date, February 2004)

 

MAKIKI

Mott-Smith Drive, Pensacola Street and Makiki Street Sidewalk Improvements: Construct new sidewalks, curb ramps, driveways, curbs, gutters, walls, pavement restoration and and install traffic signs.

                        (Estimated completion date, January 2004)

 

MCCULLY

Reconstruction of Concrete Sidewalks - University Avenue, Algaroba Street, Wiliwili Street, Makahiki Way, Waiola Street, Waiola Way, Paani Street, Citron Street, Fern Street, Hoawa Street, Lime Street, Coolidge Street, and Date Street: Remove and reconstruct concrete sidewalks, curbs and gutters, trim street trees and cut and remove tree roots, install root barriers, and adjust utility boxes to new grade.

            (Estimated completion date, April 2004)

 

MILILANI

Rehabilitation of Streets - Kuahelani Avenue and Meheula Avenue:  Construct new curb ramps, sidewalks, driveways.  Install traffic signal system, streetlight system, traffic signs, striping, markings and markers.  (Estimated completion date, January 2004)

 

Kamehameha Highway Trunk Sewer Reconstruction: Work along Kamehameha Highway in Mililani from Meheula Parkway to Hokuioli Street.  (Estimated completion date, February 2004)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:

Upgrade roadway to include 2 additional lanes in each direction, with designated left and right turning lanes. Provide traffic controls, mass grading, temporary security fencing and electrical overhead lines, sidewalks, curbs, gutters, curb ramps and property adjustments, including demolishing and reconstructing new structures and constructing new walls. Install detention basins, drainage, water, sewer, traffic signal, streetlights, underground electrical system, oil lines, gas lines, pavement striping, markings and markers, and traffic signs, irrigation and landscaping.

            (Estimated completion date, July 2004)

 

WAIANAE

Lehoku Street, Hokukea Place, Hokuukali Street & Place, Hokuaiaina Place, Hokuaea Place, Hokupaa Street & portion of Leihua Street.  Reconstruct and resurface asphalt pavement, adjust utility manholes, and install pavement markings.

            (Estimate completion date, February 2004)

 

WAIPAHU

Hikimoe Street Improvements for City Express Bus Service Waipahu Depot Road to Mokuola Street:

Reconstruction of concrete roadway pavement, bus shelters, restroom facilities, and street lighting.

            (Estimated completion date, June 2004)

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

 

February 15, 2004 Sunday
9:00AM Starts
1:00PM Ends

BRUNCH ON THE BEACH STREET FESTIVAL sponsored by the Waikiki Improvement Assn./C&C Honolulu.  The event is expected to have 5,000+ participants.  Traffic will be diverted starting 3:30 am for setup. The event will close Kalakaua Avenue, all lanes from Kaiulani Avenue to Liliuokalani Avenue. Contact: DTS-TST Div. 527-6009

 

February 16, 2004 Monday
6:50AM Starts
11:00AM End

GREAT ALOHA RUN 2004 sponsored by Great Aloha Run/Carole Kai Charities. The event is expected to have 26,000 runners. It will start on Nimitz Hwy. at Nuuanu Ave., to Nimitz Hwy., ewa bound, to Kamehameha Hwy then under the H-1 viaduct, to Kamehameha Hwy., to Aloha Stadium service road into the main gate of Aloha Stadium, to finish in the north end zone of Aloha Stadium. Contact Alan Sunio 528-7388 For more info, visit their website: www.greataloharun.com

The above is based on the most current information available.  TST Division, Department of Transportation Services  Phone: 808-527-6009  Fax: 808-523-4446.

Thursday, February 12, 2004

© Copyright 2002-2006 City and County of Honolulu, Hawaii
Privacy Statement | Technical Support | Customer Service | Policy | Accessibility | Diversity Statement