ROAD WORK WEEKLY REPORT

 

Scheduled roadwork for the week beginning July 3, 2005, for the Department of Design & construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch).  Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

EWA

Ewa Villages, Extension of Kapolei Parkway, Phase 8A - Renton Road at future extension of Kapolei Parkway:  Construct new intersection including sewer, drainage, sidewalk, curb ramps, street lights, and landscape work.

            (Estimated completion date, December 2005)

 

HALEIWA

Bridge Rehabilitation at Anahulu Stream:  Remove deteriorated concrete and reinforcement, reconstruct and repair areas, modify existing railings and paint structure.

            (Estimated completion date, December 2005)

 

HONOLULU

Miscellaneous Guardrail Improvements at Alewa Drive at Aulii Street: Install new guardrails.

            (Estimated completion date, July 2005)

 

King Street Improvements, Phase 3 - North King Street between Liliha Street and Desha Lane and Austin Lane and Morris Lane:  Construction of concrete driveways, sidewalks, curb ramps, planting of trees; construction of street lighting system.  Pending revised scope of work.  Trees to be deleted.

            (Estimated completion date, November 2005)

 

Bridge Replacement at La’i Road Bridges Nos. 379 &380.  Remove existing wooden bridges and replace with new concrete bridges.

            (Estimated completion date, July 2005)

 

Magazine Street Sewer Line Replacement/Rehabilitation – Magazine Street (Thurston Avenue to Prospect Street); Spencer Street (Victoria Street to Wilder Avenue); Thurston Avenue (Victoria Street to Wilder Avenue):  Sewer line relining with Cast in Place Liner.

            (Estimated completion date, July 2005)

 

Manoa Stream Bank Repairs: Emergency reconstruction of CRM stream wall at Manoa Stream adjacent to Koali Road.  Work includes demolition, excavation, dewatering, construction of new CRM wall, reconstruction of Koali Road, and repaving of Hokulani School parking lot.

            (Estimated completion date, August 2005)

 

Niu Valley Wastewater Pump Station Emergency Force Main Emergency Bypass: Installation of an emergency bypass pipe along Kalanianaole Highway between East Halemaumau Street and Pu’u’ikena Street.

            (Estimated completion date, October 2005)

 

Rehabilitation of Various Streets, Palolo Valley--Orchid Street, Palolo Avenue to Jasmine Street, Ginger Street; Gardenia Street, Ginger St to Carlos Long; Myrthle Street, Carlos Long to End; Narcissus Street and Place:  Reconstruct curbs, gutters and weakened roadway areas; mill roadway surface and pave; adjust utility manholes and install permanent pavement markings.

            (Estimated completion date, October 2005)

 

Rehabilitation of Streets, Unit 5B – Piikoi Street (King Street to Matlock Avenue):  Reconstruction and resurfacing of roadway, adjustment of utilities and permanent pavement markings.

            (Estimated completion date, July 2005)

 

Punchbowl Street Improvements, Phase 2, Punchbowl Street between Ala Moana Boulevard and just beyond King Street: Modify the traffic signals, streetlights, parking meters, traffic signs, pavement striping, marking and markers for one-way traffic.  Reconstruct the road pavement and resurface; adjust utility boxes, manholes and street monuments.

            (Estimated completion date, July 2005)

 

Rehabilitation of Streets – St. Louis Drive, Dole Street, Frank Street, Eugene Place, Alphonse Place, Robert Place, and Maigret Street:  Reconstruction and resurfacing of asphalt concrete roadways, installation of pavement markings, restoration of concrete curbs and gutters.

            (Estimated completion date, July 2005)

 

KAHUKU

Rehabilitation of Streets, Unit 39 – Hospital Road, Makaiau Place, Pualalea Street, Place & Way, Pahelehala Loop, Huehu Street & Place, Kiu Place, Olauniu Place, Kahana Place, Keawemauhili Place, Alapa Place, Kekauoha Street, Maunuunu Street:  Reconstruct failed areas, mill & resurface asphalt pavement, adjust utilities to grade, install permanent striping and vehicle detector loops.

            (Estimated completion date, December 2005)

 

KAILUA

Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive.

(Estimated completion date, August 2005)

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Kuulei Road: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6:00 p.m.

            (Estimated completion date, October 2006)

 

KAIMUKI

Reconstruction of Concrete Sidewalks in Kaimuki area - Harding Avenue, Pahoa Avenue, Kaimuki Avenue, Maunaloa Avenue, Kilauea Avenue, Maunalei Avenue, Lua Wai Place, Keanu Street, Pilialo Street, Ocean View Drive, Sunset Avenue, Pokole Street, 6th to 16th Avenue and 22nd Avenue:

Demolish and reconstruct existing sidewalks, driveway aprons, curbs and gutters.

            (Estimated completion date, August 2005)

 

KALIHI

Curb ramps at Notley Street and Middle Street, upgrade traffic signal system.  Construct new curb ramps, sidewalk and A.C. transition.  Install pavement markings and adjust utility boxes to grade.

            (Estimated completion date, July 2005)

 

MAKAKILO

Rehabilitation of Streets, Unit 31 – Makakilo Drive, H-1 Freeway to Ala Hoi Street:  Reconstruct curb/gutters & roadway.  Resurface roadway, adjust utilities to grade, install vehicle loop sensors and permanent pavement markings.

            (Estimated completion date, September 2005)

 

MAKIKI

Curb ramps at Piikoi Street and Wilder Avenue, Liholiho Street and Wilder Avenue:  upgrade traffic signal system.

            (Estimated completion date, July 2005.)

 

MOANALUA

Rehabilitation of Streets & Moanalua Water System Improvements:  Ala Aolani Place and portions of Ala Aolani Street, Ala Lani Street and Place, Ala Kiao Place, Ala Iolani Street and Place, Kapulei Street:  Installation of 4” and 8” water mains, reconstruction and resurfacing of roadways, adjustment of utility manholes, installation of pavement markings.

            (Estimated completion date, November 2005)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street: Upgrade roadway to include additional lanes in each direction, with designated left and right turning lanes. Provide traffic controls, and temporary security fencing.  Install sidewalks, curbs, gutters, curb ramps, property adjustments, streetlights, pavement striping, markings and markers, fencing, traffic signs, irrigation, landscaping and water meter.  Remove temporary traffic signal poles.

            (Estimated completion date, July 2005)

 

PUPUKEA

Rehabilitation of Streets, Unit 39 –Pupukea Road:  Reconstruct failed areas, mill & resurface asphalt pavement, adjust utilities to grade, install permanent striping and vehicle detector loops.

            (Estimated completion date, December 2005)

 

WAIALUA

Rehabilitation of Streets, Unit 39 – Waialua Beach Road:  Reconstruct failed areas, mill & resurface asphalt pavement, adjust utilities to grade, install permanent striping and vehicle detector loops.

            (Estimated completion date, December 2005)

 

WAIKIKI

Reconstruction of concrete sidewalks - Ala Wai Boulevard, Ainakea Way, Wai Nana Way, Hobron Lane, Lipeepee Street, Ena Road, Kaioo Drive, Paokalani Avenue, Kaneloa Road, Saratoga Road, Beach Walk, Lewers Street, Aloha Drive, Royal Hawaiian Avenue, Seaside Avenue, Nohonani Street, Walina Street, Kanekapolei Street, Kaiulani Avenue, Uluniu Avenue, Prince Edward Street, Koa Avenue, McCully Street, Liliuokalani Avenue, Kealohilani Avenue, Ohua Avenue, Kapili Street, Cleghorn Street, Kapuni Street, Kaiolu Street, Launiu Street, Kalaimoku Street, Olohana Street, Namahana Street, Kuamoo Street, Keoniana Street, Niu Street, and Helumoa Street:   Demolish and reconstruct existing sidewalks, driveway aprons, curbs and gutters.

            (Estimated completion date, November 2005)

 

WAIPAHU

Village Park Connector Road: Construction of a two-way connector road between Kupuna Loop in Village Park and Loaa Street in Waipahu.  Work includes roadway grading, construction of roadways, sidewalks, curb ramps and CRM and CMU walls; and installation of water lines, drain lines, electrical lines, streetlights, irrigation lines and landscaping.

            (Estimated completion date, July 2005)

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

 

July 4, 2005 Monday
10:00AM Starts
11:30AM Ends

KAILUA 4th OF JULY Independence Day Parade sponsored by Kailua Chamber of Commerce. The event will have 500 marchers, 70 vehicles, 15 floats, & 5 bands It will start at Kainalu Dr./Omao St., to Kainalu Drive, to end at Kailua Intermediate School. Contact: Kailua Chamber of Commerce 261-2727 Fax:262-0867

 

July 4, 2005 Monday
6:00AM Starts
7:30AM Ends

EPILEPSY FREEDOM RUN sponsored by Epilepsy Foundation of Hawaii. The event will have 300 runners. It will start on Akiohala St. dead end (Kailua High School), to Keolu Dr., to Akake Pl., to turnaround in dead end,  to Akake Pl.,  - to Keolu Dr., to  Akiohala St., to end at Kailua High School Finish area.  Contact: Sheila Bierwert 528-3058  Email: efh@hawaiiepiliepsy.com  For more info check out their website: www.hawaiiepilepsy.com/efh

 

July 10&11, 2005 Sunday&Monday
9:00AM Starts
11:00AM Ends

PARADISE BIKE RIDE sponsored by Life Foundation.  The event will have 150 bikers.  July 10, 2005-Start: Queen Kapiolani Park at Queens Surf Beach, to Kalakaua Ave., to Poni Moi Rd., to Diamond Hd Rd., to Kahala Ave., to Kealaolu St., to Kalanianaole Hwy., to Kailua Rd., to Kainalu Rd., to Kainui Dr., to N. Kalaheo Ave., to Kaneohe Bay Dr., to Kamehameha Hwy., end at Kualoa Regional Park.  July 11, 2005-Start:  Kualoa Regional Park, to Kamehameha Hwy., to Kaukonahua Rd., to Farrington Hwy., end at Camp  Mokuleia.  Contact:  Cathy Pudwill at 521-2437, Fax:  521-1279

 

The above is based on the most current information available from the event organizers as of date on bottom.  TST Division, Department of Transportation Services  Phone: 808-527-6009 Fax: 808-523-4446 Email:  ikodani@co.honolulu.hi.us

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879.