Scheduled roadwork for the week beginning November 20, 2005, for the Department of Design & construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch).  Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

EWA

Ewa Villages, Extension of Kapolei Parkway, Phase 8A - Renton Road at future extension of Kapolei Parkway:  Construct new intersection including sewer, drainage, sidewalk, curb ramps, street lights, and landscape work.

            (Estimated completion date, December 2005)

 

HALEIWA

Bridge Rehabilitation at Anahulu Stream:  Remove deteriorated concrete and reinforcement, reconstruct and repair areas, modify existing railings and paint structure.

            (Estimated completion date, December 2005)

 

HONOLULU

Rehabilitation of Harding Avenue from 1st Avenue to Luawai Street, 6th Avenue from Harding Avenue to Palolo Avenue, Leahi Avenue from Kapahulu Avenue to Noela Street, 5th Avenue from Harding Avenue to Dead End:  The work primarily consists of reconstruction, milling and resurfacing the roadways.  Also, included is the reconstruction of some concrete curbs, gutters, driveways, aprons, sidewalks, and some new drainage improvements.  Installation of pavements, markings, traffic sensors and adjustment of utility covers to grade will complete the project.

            (Estimated completion date, May 2006)

 

Kalaiopua Place Improvements:  Relocate utility poles, reconstruct roadway, install guardrail and resurface roadway.

            (Estimated completion date, December 2005)

 

Wheelchair Ramps at Keeaumoku Street and Nehoa Street:  Construct new curb ramps, sidewalks, AC transitions and traffic signal work.  Install striping and markers.

            (Estimated completion date, November 2005)

 

King Street Improvements, Phase 3 - North King Street between Liliha Street and Desha Lane and Austin Lane and Morris Lane:  Construction of concrete driveways, sidewalks, curb ramps, planting of trees; construction of street lighting system.  Pending revised scope of work.  Trees to be deleted.

            (Estimated completion date, November 2005)

 

Guardrail improvements at Lai Road:  Install new metal guardrail and object marks.            (Estimated completion date, December 2005)

 

Curb Ramps at Liliha Street/Kuakini Street, Liliha Street/Kunawai Lane/Elena Street, Liliha Street/Borges Lane/Dayton Lane, Liliha Street/Bates Street, Nuuanu Avenue between Judd Street and Robinson Lane and Wyllie Street, Pacific Heights Road/Pauoa Road:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, December 2005)

 

Rehabilitation of Various Streets, Palolo Valley--Orchid Street, Palolo Avenue to Jasmine Street, Ginger Street; Gardenia Street, Ginger St to Carlos Long; Myrthle Street, Carlos Long to End; Narcissus Street and Place:  Remedial work.

            (Estimated completion date, October 2005)

 

Punchbowl Street Improvements, Phase I:  Reconstruct curb ramps, update traffic signal system and restripe pavement markings at King Street & Beretania Street intersection.              (Estimated completion date, November 2005)

 

Rehabilitation of Streets St. Louis Drive, Dole Street, Frank Street, Eugene Place, Alphonse Place, and Robert Place:  Reconstruct concrete driveway, installation of signs and complete punchlist.

            (Estimated completion date, December 2005)

 

KAHALUU

Miscellaneous Guardrail Improvements Lihikai Drive and Lanani Drive:  Install new metal guardrail and object marks.

            (Estimated completion date, December 2005)

 

KAILUA

Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive.

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Kuulei Road: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6:00 p.m.

 

KAIMUKI

Reconstruction of Concrete Sidewalks in Kaimuki area - Harding Avenue, Pahoa Avenue, Kaimuki Avenue, Maunaloa Avenue, Kilauea Avenue, Maunalei Avenue, Lua Wai Place, Keanu Street, Pilialo Street, Ocean View Drive, Sunset Avenue, Pokole Street, 6th to 16th Avenue and 22nd Avenue:

Demolish and reconstruct existing sidewalks, driveway aprons, curbs and gutters.

            (Estimated completion date, November 2005)

 

KALIHI

Curb Ramps at Mokauea Street/Auiki Street, Mokauea Street/Hart Street, Mokauea Street/Kalani Street, Mokauea Street/Hau Street, Mokauea Street/Colburn Street, Dillingham Boulevard between Kalihi/McNeil Street, and Dillingham Boulevard between Alakawa/Kokea Street:  Construct new curb ramps and sidewalks.  Install pavement striping and markings.

            (Estimated completion date, December 2005)

 

MILILANI

Reconstruction of Concrete Sidewalks, Mililani Area - Lanikuhana Avenue, Poiki Street., Poiki Place., Awiki Street., Opo Place, Kaukoe Street, Paionia Place, Keaolani Street, Awiwi Place, Kikalake Place, Kamaio Street, Aaahi Street, Meheula Parkway, Mahapili Street, Kauakapuu Loop, Hakianalia Place, Holanialii Street, Apele Street, Kikiula Loop, Mahinahou Street, Kamalei Street,  Waileia Place, Nui Street, Kealakaa Street, Ihuhanu Place, Kealohi Street, Makapipipi Street, Keehuiwa Street., Makohilani Street, Ukalalii Place, Puaahi Place, Hokulili Street:  Removal and reconstruction of damaged concrete sidewalk, curb and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the areas; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

(Estimated Completion Date, November 2005)

 

Curb Ramps at Hokuiwa Street/Kawau Street, Kaloapau Street/Kehepue Loop, Alapoai Street/Alapoai Place, Hokuala Street/Hokuili Street, Anania Drive/Puanane Loop, Anania Drive/Hakamoa Street, Anania Drive/Kiaha Loop, Anania Drive/Kaukalia Street, Anania Drive/Lanikuhana Ave, Anania Drive/Hokualii Street, Anania Drive/Kapuahi Street, Waihonu Street/Waimakua Drive, Waiehu Place/Waimakua Drive, Kipapa Drive/Moenamanu Street, Hookelewaa Street/Kipapa Drive:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install striping, marking and markers.

            (Estimated completion date, January 2006)

 

MOANALUA

Rehabilitation of Streets & Moanalua Water System Improvements:  Ala Aolani Place and portions of Ala Aolani Street, Ala Lani Street and Place, Ala Kiao Place, Ala Iolani Street and Place, Kapulei Street:  Install under drain, reconstruction and resurfacing of roadways, adjustment of utility manholes, installation of pavement markings.

            (Estimated completion date, November 2005)

NORTH SHORE

Curb Ramps at Various Locations, FY2002 (5) Akule Street/Aweoweo Street, Au Street/Aweoweo Street, Au Street/Apuhihi Street, Akule Street/Apuhihi Street:  Construct new curb ramps, sidewalks, AC transitions.  Install striping, marking and markers.

            (Estimated completion date, December 2005)

 

PEARL CITY

Rehabilitation of Waimano Home Road from Kamehameha Highway to Komo Mai Drive:  Install curb ramps and traffic signals relocation.  Reconstruct failed pavement areas and resurface roadways.  Install vehicle loop sensors, and pavement markings and adjust utilities to grade.

            (Estimated completion date, June 2006)

 

PORTLOCK

Reconstruction of Concrete Sidewalks, Portlock Area:  Poipu Drive, Nawiliwili Street, Makaweli Street, Lawai Street, Lumahai Street, Lumahai Place, Hanapepe Loop, Hanapepe Place, Polihale Place, Kalalau Street, Waialae Avenue, Anahola Street.  Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the areas; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated Completion Date, February 2006).

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:  Final inspection punch list and change order work.

            (Estimated completion date, November 2005)

 

Guardrail improvements at Salt Lake Boulevard:  Install new metal guardrail and object marks. (Estimated completion date, December 2005)

 

WAHIAWA

Curb Ramps at California Avenue/Kaalalo Place, Kilani Avenue/Mango Street, Kilani Avenue/Westervelt Street, Kilani Avenue/Lehua Street, California Avenue/Lehua Street/Muliwai Avenue, California Avenue/North Cane Street, Kilani Avenue/North Cane Street, California Avenue/Uuku Street:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, December 2005)

 

WAIALUA

Rehabilitation of Waialua Beach Road:  Reconstruct bridge joint.

            (Estimated completion date, December 2005)

 

Curb Ramps at Kupahu Street/Nahoa Street:  Construct new curb ramps.  Install striping and markers.

            (Estimated completion date, December 2005)

 

WAIKIKI

Reconstruction of concrete sidewalks - Ala Wai Boulevard, Ainakea Way, Wai Nana Way, Hobron Lane, Lipeepee Street, Ena Road, Kaioo Drive, Paokalani Avenue, Kaneloa Road, Saratoga Road, Beach Walk, Lewers Street, Aloha Drive, Royal Hawaiian Avenue, Seaside Avenue, Nohonani Street, Walina Street, Kanekapolei Street, Kaiulani Avenue, Uluniu Avenue, Prince Edward Street, Koa Avenue, McCully Street, Liliuokalani Avenue, Kealohilani Avenue, Ohua Avenue, Kapili Street, Cleghorn Street, Kapuni Street, Kaiolu Street, Launiu Street, Kalaimoku Street, Olohana Street, Namahana Street, Kuamoo Street, Keoniana Street, Niu Street, and Helumoa Street:   Demolish and reconstruct existing sidewalks, driveway aprons, curbs and gutters.

            (Estimated completion date, November 2005)

 

Curb Ramps at Ala Wai Boulevard/Ohua Street, Ala Wai Boulevard/Walina Street, Ala Wai Boulevard/Nahua Street, Ala Wai Boulevard/Nohonani Street:  Construct new curb ramps and sidewalks.  Install pedestrian push bottons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, December 2005)

 

WAIMALU

Curb Ramps at Kamahao Pl./Kamahao St., Kaahumanu St./Oihana Pl./Kuahao Pl., Kaahele St./Moanalua Rd., Kilinoe St./Kaahele St., Kaahele St./Lulu St., Kaonohi St. at Moanalua Rd., Koauke St./Moanalua Rd./Pali Momi St., and Iho Pl./Palula Wy.:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle loop detectors, striping, marking and markers.

            (Estimated completion date, January 2006)

 

WAIPAHU

Village Park Connector Road: Construction of a two-way connector road between Kupuna Loop in Village Park and Loaa Street in Waipahu.  Work includes roadway grading, construction of roadways, sidewalks, curb ramps and CRM and CMU walls; and installation of water lines, drain lines, electrical lines, streetlights, irrigation lines and landscaping.

            (Estimated completion date, December 2005)

 

Curb Ramps at Waipahu Street/Hene Street, Waipahu Street/Leowahine Street, Waipahu Street/Amokii Street, Waipahu Street/Ikepono Pl., Leokane Street/Leoleo Street, Pupuole Street/Pupuole Pl., Waipahu Street/Waipahu Depot Street,, Waipahu Street/Paiwa Street, and Waipahu between Mokuloa Street and Paiwa Street, Waipahu Street,/Ana Lane/Mahoe Street:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, December 2005)

 

Kahuanani Street Sewer Replacement/Rehabilitation: Installation of a new sewer line and CIPP installation along Kahuanani Street.

            (Estimated completion date, March 2006)

 

WAIPIO

Curb Ramps at Various Locations, FY2002(5) Ka Uka Boulevard/Ukee Street, Ka Uka Boulevard/Waipio Uka Street/Pauhi Street:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install striping, marking and markers.

            (Estimated completion date, January 2006)

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

 

November 20, 2005 Sunday
7:00AM Starts
1:00PM Ends

TOUR DE CURE BIKE RIDE sponsored by American Diabetes Association. The event is expected to have 300 riders.  It will start at Kapiolani Community College Parking Lot, to Diamond Hd. Rd., to Kahala Ave., to Kealaolu Ave., to Kalanianaole Hwy., to Maunalua Bay Beach Park Rest Stop 25K, others proceed, to Lunalilo Home Rd., to Hawaii Kai Dr., to Kealahou St., to Kalanianaole Hwy., towards Waimanalo, to Oluolu St., Hihimau St., to Ahiki St., to Waikupunaha St., to Kumuhau St., to Keolu Dr., to Wanaao Rd., to Kailua Intermediate Rest Stop, to Kailua Rd., to Castle Junction 50K, return to Kalanianaole Hwy., to Kealahou St., to Hawaii Kai Dr., to Lunalilo Home Rd., to Kalanianaole Hwy., to Kilauea Ave., to Elepaio St., to Kahala Ave., to Diamond Hd. Rd., to end at Kapiolani Community College 85K.  Contact: Paige Bauer 947-5979 Fax: 947-5978  For more info, check out their website:  http://www.diabetes.org/tour

 

November 20, 2005 Sunday
8:00AM Starts
11:00AM Ends

PFLUEGER HONDA MOUNTAINMAN TRIATHLON sponsored by Boca Hawaii.  The event is expected to have 250 participants.  Swim 500m, Bike 20K, Run 5K-Kualoa Ranch.  Contact:   Raul Torres 223-2622, Fax:  737-8985.  For more info, check out their website:  www.bocahawaii.com

 

November 24, 2005 Thursday
7:00AM Starts
11:00AM Ends

NORTH SHORE THANKSGIVING KOKUA WALK/RUN sponsored by First Baptist Church of Haleiwa. The event is expected to have 1,000 walkers/runners.  It will start at Kaiaka Park, to Haleiwa Rd., to Kam Hwy., to Weed Circle, to Waialua Beach Rd., end at Kaiaka Park. Contact: Melvin Amantiad at 637-3048, Fax:  637-8862 

 

November 24, 2005 Thursday
7:30AM Starts
9:00AM Ends

TURKEY TROT FUN RUN sponsored by Honolulu Marathon Clinic. The event is expected to have 800 runners/walkers.  It will start at Paki Ave./Monsarrat Ave., to Paki Ave., onto Diamond Hd. Rd., to 22nd Ave.,. to Kilauea Ave., to Kealaolu Ave., to Kahala Ave., to Kalakaua Ave., to finish at Honolulu Marathon Finish Line on Kalakaua Ave. near Kapiolani Park Bandstand. Contact:  Alan Sunio 753-1999  Fax:  455-7574 

 

November 25, 2005 Friday
12Noon Starts
4:00PM Ends

UH TAILGATE SERIES BLOCK PARTY #6 sponsored by Murphy's Bar & Grill. The event is expected to have 1,000+ participants.  Traffic will be diverted starting 11 am for setup. The event will close MERCHANT ST., all traffic lanes/sidewalk areas, from Nuuanu Ave. to Bethel St. Contact Don Murphy 531-0422

 

November 25, 2005 Friday
5:30PM Starts
7:00PM Ends

LILIHA/PALAMA XMAS PARADE sponsored by Liliha Palama Business Association. The event is expected to have 100 marchers & 8 vehicles.  It will start at United Church of Christ, to Judd St., to Liliha St., to N. King St., to end at King St./Kohou St. Contact: Dwight Young  525-7883 

 

November 25, 2005 Friday
6:30PM Starts
8:00PM Ends

KALIHI XMAS PARADE sponsored by Kalihi Business Association. The event is expected to have 100 marchers, 15 vehicles, 2 floats and 3 bands.  It will start at Kalihi Union Church, to N. King St., to Mokauea St., to Dillingham Blvd., to Waiakamilo Rd./Houghtailing St., to N. School St., end at Kamehameha Shopping Center.  Contact:  Robert Takeshita at 536-1710, Fax:  536-1354

 

November 25, 2005 Friday
7:00PM Starts
8:30PM Ends

WAIKIKI HOLIDAY PARADE sponsored by Superior Bands. The event is expected to have 2,000 marchers, 40 vehicles, & 10 bands.  It will start at Saratoga Rd/Kalakaua Avenue to Kalakaua Ave, to Monsarrat Ave., to end at Queen Kapiolani Park  Contact: Jake Peppers 888-892-5877

November 26, 2005 Saturday
10:00AM Starts
11:30AM Ends

HAWAII KAI XMAS PARADE sponsored by Hawaii Kai Lions Club. The event is expected to have 1,000 marchers, 30 vehicles, & 2 bands.  It will start at Kamiloiki Park, to Lunalilo Home Rd., to end at Koko Marina Shopping Center. Contact: Walter Kuroiwa  395-3384

 

 

The above is based on the most current information available from the event organizers as of date on bottom.  TST Division, Department of Transportation Services  Phone: 808-527-6009 Fax: 808-523-4446 Email:  ikodani@co.honolulu.hi.us

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879.