You are here:  Main / Customer Services / Public Communications Division / 2005 / Road Work Weekly Report

ROAD WORK WEEKLY REPORT

 

Scheduled roadwork for the week beginning October 9, 2005, for the Department of Design & construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch).  Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

EWA

Ewa Villages, Extension of Kapolei Parkway, Phase 8A - Renton Road at future extension of Kapolei Parkway:  Construct new intersection including sewer, drainage, sidewalk, curb ramps, street lights, and landscape work.

            (Estimated completion date, December 2005)

 

HALEIWA

Bridge Rehabilitation at Anahulu Stream:  Remove deteriorated concrete and reinforcement, reconstruct and repair areas, modify existing railings and paint structure.

            (Estimated completion date, December 2005)

 

HONOLULU

Kalaiopua Place Improvements:  Relocate utility poles, reconstruct roadway, install guardrail and resurface roadway.

            (Estimated completion date, December 2005)

 

Wheelchair Ramps at Keeaumoku Street and Nehoa Street:  Construct new curb ramps, sidewalks, AC transitions and traffic signal work.  Install striping and markers.

            (Estimated completion date, November 2005)

 

King Street Improvements, Phase 3 - North King Street between Liliha Street and Desha Lane and Austin Lane and Morris Lane:  Construction of concrete driveways, sidewalks, curb ramps, planting of trees; construction of street lighting system.  Pending revised scope of work.  Trees to be deleted.

            (Estimated completion date, November 2005)

 

Bridge Replacement at Lai Road Bridges Nos. 379 &380.  Remove existing wooden bridges and replace with new concrete bridges.

            (Estimated completion date, October 2005)

 

Guardrail improvements at Lai Road:  Install new metal guardrail and object marks.            (Estimated completion date, December 2005)

Curb Ramps at Liliha Street/Kuakini Street, Liliha Street/Kunawai Lane/Elena Street, Liliha Street/Borges Lane/Dayton Lane, Liliha Street/Bates Street, Nuuanu Avenue between Judd Street and Robinson Lane and Wyllie Street, Pacific Heights Road/Pauoa Road:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, December 2005)

 

Manoa Stream Bank Repairs: Emergency reconstruction of CRM stream wall at Manoa Stream adjacent to Koali Road.  Work includes demolition, excavation, dewatering, construction of new CRM wall, reconstruction of Koali Road, and repaving of Hokulani School parking lot.

            (Estimated completion date, October 2005)

 

Rehabilitation of Various Streets, Palolo Valley--Orchid Street, Palolo Avenue to Jasmine Street, Ginger Street; Gardenia Street, Ginger St to Carlos Long; Myrthle Street, Carlos Long to End; Narcissus Street and Place:  Reconstruct curbs, gutters and weakened roadway areas; mill roadway surface and pave; adjust utility manholes and install permanent pavement markings.

            (Estimated completion date, October 2005)

 

Punchbowl Street Improvements, Phase I:  Reconstruct curb ramps, update traffic signal system and restripe pavement markings at King Street & Beretania Street intersection.              (Estimated completion date, November 2005)

 

Punchbowl Street Improvements, Phase 2, Punchbowl Street between Ala Moana Boulevard and just beyond King Street:  Adjust utility manholes and install parking meters.

            (Estimated completion date, October 2005)

 

Rehabilitation of Streets St. Louis Drive, Dole Street, Frank Street, Eugene Place, Alphonse Place, Robert Place, and Maigret Street:  Installation of pavement markings, adjustment of utilities to grade, reconstruct catch basins and complete punchlist.

            (Estimated completion date, December 2005)

 

KAHALUU

Miscellaneous Guardrail Improvements Lihikai Drive and Lanani Drive:  Install new metal guardrail and object marks.

            (Estimated completion date, December 2005)

 

KAILUA

Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive.

(Estimated completion date, October 2005)

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Kuulei Road: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6:00 p.m.

 

KAIMUKI

Reconstruction of Concrete Sidewalks in Kaimuki area - Harding Avenue, Pahoa Avenue, Kaimuki Avenue, Maunaloa Avenue, Kilauea Avenue, Maunalei Avenue, Lua Wai Place, Keanu Street, Pilialo Street, Ocean View Drive, Sunset Avenue, Pokole Street, 6th to 16th Avenue and 22nd Avenue:

Demolish and reconstruct existing sidewalks, driveway aprons, curbs and gutters.

            (Estimated completion date, October 2005)

 

KALIHI

Curb Ramps at Mokauea Street/Auiki Street, Mokauea Street/Hart Street, Mokauea Street/Kalani Street, Mokauea Street/Hau Street, Mokauea Street/Colburn Street:  Construct new curb ramps and sidewalks.  Install pavement striping and markings.

            (Estimated completion date, December 2005)

 

MAKAKILO

Rehabilitation of Streets, Unit 31 Makakilo Drive, H-1 Freeway to Ala Hoi Street:  Reconstruct curb/gutters & roadway.  Adjust utilities to grade, install vehicle loop sensors and permanent pavement markings.

            (Estimated completion date, October 2005)

 

Curb Ramps at Various Locations, FY 2002(5) Panama Street/Hame Street/Welo Street:  Construct new curb ramps and AC transitions.

            (Estimated completion date, January 2006)

 

MILILANI

Reconstruction of Concrete Sidewalks, Mililani Area - Lanikuhana Avenue, Poiki Street., Poiki Place., Awiki Street., Opo Place, Kaukoe Street, Paionia Place, Keaolani Street, Awiwi Place, Kikalake Place, Kamaio Street, Aaahi Street, Meheula Parkway, Mahapili Street, Kauakapuu Loop, Hakianalia Place, Holanialii Street, Apele Street, Kikiula Loop, Mahinahou Street, Kamalei Street,  Waileia Place, Nui Street, Kealakaa Street, Ihuhanu Place, Kealohi Street, Makapipipi Street, Keehuiwa Street., Makohilani Street, Ukalalii Place, Puaahi Place, Hokulili Street:  Removal and reconstruction of damaged concrete sidewalk, curb and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the areas; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

(Estimated Completion Date, November 2005)

 

Curb Ramps at Hokuiwa Street/Kawau Street, Kaloapau Street/Kehepue Loop, Alapoai Street/Alapoai Place, Hokuala Street/Hokuili Street, Anania Drive/Puanane Loop, Anania Drive/Hakamoa Street, Anania Drive/Kiaha Loop, Anania Drive/Kaukalia Street, Anania Drive/Lanikuhana Ave, Anania Drive/Hokualii Street, Anania Drive/Kapuahi Street, Waihonu Street/Waimakua Drive, Waiehu Place/Waimakua Drive, Kipapa Drive/Moenamanu Street, Hookelewaa Street/Kipapa Drive:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install striping, marking and markers.

            (Estimated completion date, January 2006)

 

MOANALUA

Rehabilitation of Streets & Moanalua Water System Improvements:  Ala Aolani Place and portions of Ala Aolani Street, Ala Lani Street and Place, Ala Kiao Place, Ala Iolani Street and Place, Kapulei Street:  Installation of 4 and 8 water mains, reconstruction and resurfacing of roadways, adjustment of utility manholes, installation of pavement markings.

            (Estimated completion date, November 2005)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street: Upgrade roadway to include additional lanes in each direction, with designated left and right turning lanes. Provide traffic controls.  Install property adjustments, fencing, irrigation, and landscaping.

            (Estimated completion date, October 2005)

 

Guardrail improvements at Salt Lake Boulevard:  Install new metal guardrail and object marks. (Estimated completion date, December 2005)

 

WAHIAWA

Curb Ramps at California Avenue/Kaalalo Place, Kilani Avenue/Mango Street, Kilani Avenue/Westervelt Street, Kilani Avenue/Lehua Street, California Avenue/Lehua Street/Muliwai Avenue, California Avenue/North Cane Street, Kilani Avenue/North Cane Street, California Avenue/Uuku Street:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, December 2005)

 

WAIALUA

Rehabilitation of Waialua Beach Road:  Reconstruct failed areas, mill & resurface asphalt pavement, adjust utilities to grade, install permanent striping and vehicle detector loops.

            (Estimated completion date, December 2005)

 

Curb Ramps at Kupahu Street/Nahoa Street:  Construct new curb ramps.  Install striping and markers.

            (Estimated completion date, December 2005)

 

WAIKIKI

Reconstruction of concrete sidewalks - Ala Wai Boulevard, Ainakea Way, Wai Nana Way, Hobron Lane, Lipeepee Street, Ena Road, Kaioo Drive, Paokalani Avenue, Kaneloa Road, Saratoga Road, Beach Walk, Lewers Street, Aloha Drive, Royal Hawaiian Avenue, Seaside Avenue, Nohonani Street, Walina Street, Kanekapolei Street, Kaiulani Avenue, Uluniu Avenue, Prince Edward Street, Koa Avenue, McCully Street, Liliuokalani Avenue, Kealohilani Avenue, Ohua Avenue, Kapili Street, Cleghorn Street, Kapuni Street, Kaiolu Street, Launiu Street, Kalaimoku Street, Olohana Street, Namahana Street, Kuamoo Street, Keoniana Street, Niu Street, and Helumoa Street:   Demolish and reconstruct existing sidewalks, driveway aprons, curbs and gutters.

            (Estimated completion date, November 2005)

 

Curb Ramps at Ala Wai Boulevard/Ohua Street, Ala Wai Boulevard/Walina Street, Ala Wai Boulevard/Nahua Street, Ala Wai Boulevard/Nohonani Street:  Construct new curb ramps and sidewalks.  Install pedestrian push bottons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, December 2005)

 

WAIMALU

Curb Ramps at Kamahao Pl./Kamahao St., Kaahumanu St./Oihana Pl./Kuahao Pl., Kaahele St./Moanalua Rd., Kilinoe St./Kaahele St., Kaahele St./Lulu St., Kaonohi St. at Moanalua Rd., Koauke St./Moanalua Rd./Pali Momi St., and Iho Pl./Palula Wy.:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle loop detectors, striping, marking and markers.

            (Estimated completion date, January 2006)

 

WAIPAHU

Village Park Connector Road: Construction of a two-way connector road between Kupuna Loop in Village Park and Loaa Street in Waipahu.  Work includes roadway grading, construction of roadways, sidewalks, curb ramps and CRM and CMU walls; and installation of water lines, drain lines, electrical lines, streetlights, irrigation lines and landscaping.

            (Estimated completion date, October 2005)

 

Curb Ramps at Waipahu St./Hene St., Waipahu St./Leowahine St., Waipahu St./Amokii St., Waipahu St./Idepono Pl., Leokane St./Leoleo St., Pupuole St./Pupuole Pl., Waipahu St./Waipahu Depot St., Waipahu St./Paiwa St., and Waipahu Between Mokuloa St. and Paiwa St.:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes and loops, striping, marking and markers.

            (Estimated completion date, January 2006)

 

Kahuanani Street Sewer Replacement/Rehabilitation: Installation of a new sewer line and CIPP installation along Kahuanani Street.

            (Estimated completion date, March 2006)

 

WAIPIO

Curb Ramps at Various Locations, FY2002(5) Ka Uka Boulevard/Ukee Street, Ka Uka Boulevard/Waipio Uka Street/Pauhi Street:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install striping, marking and markers.

            (Estimated completion date, January 2006)

 

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

 

October 9, 2005 Sunday
6:00AM Starts
11:00AM End

ITU JAL HONOLULU Triathlon World CHAMPIONSHIP RACE sponsored by USA Triathlon/Honolulu Triathlon Race Committee/Japan Air Lines. The event is expected to have 2,000 participants. Staggered Wave Start 6 am, 1. Swim Course: triangular route outside Sans Souci Beach, Waikiki  2. Bike Course: start at Swim/Bike Transition area, to Kalakaua Ave., to Diamond Head Rd., to Kahala Ave.,  to Kealaolu Ave., to Kalanianaole Hwy., to Lunalilo Home Rd., to Hawaii Kai Dr., to turnaround at Kealahou St., to Hawaii Kai Dr.,to Lunalilo Home Rd.,  to Wailua St., to Hawaii Kai Dr., to Kalanianaole Hwy.,  to  Kilauea Ave.,  to Elepaio St., to Kahala Ave., to Diamond Head Rd., to Kalakaua Ave.,  to transition area in Queen Kapiolani Park, near bandstand. 3. Run Course: start at Bike/Run transition area, to Kalakaua Ave.,  to Paki Ave., to U turn at Kapahulu Ave., to Paki Ave., to Monsarrat Ave., to Kalakaua Ave., turn around near Kaiulani Ave, to end at Kalakaua Ave./Monsarrat Ave (near Sunset on the Beach Screen). Contact:  Premier Event Management, LLC, Toll Free at 1-800-576-6988.  For more info, visit their website:  http://www.honolulu2005.com/

 

October 9, 2005 Sunday
7:00AM Starts
9:00AM Ends

TANTALUS 10 MILE RUN sponsored by RRCA/Mid Pacific Roadrunners Club. The event is expected to have 100 runners.  It will start at Makiki Hts Dr./Round Top Dr., to Round Top Dr., to Tantalus Dr., to Makiki Hts Dr., back to start/finish area at  Makiki Hts Dr./Round Top Dr., Contact: John Simonds 373-3609  For more info visit their website: www.mprrc.com

 

October 14, 2005 Friday
2:30PM Starts
3:30PM Ends

PEARL CITY HIGH SCHOOL HOMECOMING PARADE sponsored by PEARL CITY HIGH SCHOOL .The event is expected to have 600 marchers, 7 vehicles, 4 floats, 1 band.  It will start at Momilani Elementary, to Hookiekie St., left onto Hoomoana St., left onto Hoolaulea St., right onto Hoomaemae St., left onto Waimano Home Rd., end at Pacheco Park parking lot. Contact: Judith Ramos 453-6033 Fax: 453-6521

 

October 14, 2005 Friday
3:00PM Starts
4:00PM Ends

WAIPAHU HIGH SCHOOL HOMECOMING PARADE sponsored by Waipahu High School. The event is expected to have 200 marchers, 6 vehicles, 7 floats, 2 bands.  It will start at Waipahu High School, to Waipio Access Rd., to Kahualii St., to Kahuaina St., to Kahuanani St., to Kahuanui St., to Paiwa St., to Awanui St., to Awalai St., end at Waipahu High School Contact: Suzanne Mishima  675-0222 

 

October 15, 2005 Saturday
2:00PM Starts
6:00PM Ends

UH TAILGATE SERIES BLOCK PARTY #3 sponsored by Murphy's Bar & Grill. The event is expected to have 1,000+ participants.  Traffic will be diverted starting 1 pm for setup. The event will close MERCHANT ST., all traffic lanes/sidewalk areas, from Nuuanu Ave. to Bethel St. Contact Don Murphy 531-0422

 

 

The above is based on the most current information available from the event organizers as of date on bottom.  TST Division, Department of Transportation Services  Phone: 808-527-6009 Fax: 808-523-4446 Email:  ikodani@co.honolulu.hi.us

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879.

Thursday, October 06, 2005

© Copyright 2002-2006 City and County of Honolulu, Hawaii
Privacy Statement | Technical Support | Customer Service | Policy | Accessibility | Diversity Statement