You are here:  Main / Customer Services / Public Communications Division / honnews06 / Road Work Weekly Report

ROAD WORK WEEKLY REPORT

 

Scheduled roadwork for the week beginning April 23, 2006, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch).  Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

ALEWA

Curb Ramps at Gulick Avenue/North School Street, Hala Drive/Makuahine Street, Hauiki Street/North School Street, Kino Street/North School Street, Linapuni Street/North School Street, Makuahine Street/North School Street:  Construct new curb ramps, sidewalks and A.C. transition.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, August 2006)

 

EWA

Ewa Villages, Extension of Kapolei Parkway, Phase 8A - Renton Road at future extension of Kapolei Parkway:  Construct new intersection including sewer, drainage, sidewalk, curb ramps, street lights, and landscape work.

            (Estimated completion date, April 2006)

 

Fort Weaver Road Reconstructed Sewer Pohakupuna Road (from Poloula Place to Fort Weaver Road & Fort Weaver Road (from Pohakupuna Road to Nalomele Place)

            Estimated completion date, September 2006)

 

HALEIWA

Bridge Rehabilitation at Anahulu Stream:  Remove deteriorated concrete and reinforcement, reconstruct and repair areas, modify existing railings and paint structure.

            (Estimated completion date, June 2006)

 

HONOLULU

Curb Ramps at Alakea Street/Merchant Street, Alakea Street/Queen Street, Bethel Street/Merchant Street, Bishop Street/Merchant Street, Halekauwila Street/Mililani Street, Maunakea Street/North Kukui Street, Merchant Street/Richards Street, Mililani Street/Queen Street, North Kukui Street/Nuuanu Street, North Kukui/River Street, Pauahi Street/Nuuanu Avenue, Queen Street/Richards Street, Queen Emma Street/Vineyard Street:  Construct new curb ramps, sidewalks, AC transitions.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, August 2006)

 

Curb Ramps at Bishop Street between South Hotel Street and South King Street, Kekaulike Street/North Hotel Street, North Hotel Street/River Street, South King Street/Ward Avenue, Cooke Street/South King Street, Auahi Street/Kamakee Street, Middle Street/Rose Street, Kahauiki Street/Middle Street, Kamehameha IV Road/School Street, Hihio Place/Kamehameha IV Road, Kamehameha IV Road/Kilolani Place, Kamehameha IV Road/Kilohi Street, Kamehameha IV Road/Aoao Street, Kamehameha IV Road/Kalena Drive, Kamehameha IV Road (mid-block), Horner Lane/Kaua Street, Kamehameha IV Road/Kino Street, Campbell Avenue/Herbert Street, Campbell Avenue/Castle Street, Campbell Avenue/Brokaw Street, Campbell Avenue/Catherine Street, Campbell Avenue/Kaunaoa Street, Kanaina Avenue/Kaunaoa Street, Campbell Avenue/Esther Street:  Construct new curb ramps, sidewalks and AC transition.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated Completion Date, November 2006)

 

Rehabilitation of Harding Avenue from 1st Avenue to Luawai Street, 6th Avenue from Harding Avenue to Palolo Avenue, Leahi Avenue from Kapahulu Avenue to Noela Street, 5th Avenue from Harding Avenue to Dead End:  The work primarily consists of reconstruction, milling and resurfacing the roadways.  Also, included is the reconstruction of some concrete curbs, gutters, driveways, aprons, sidewalks, and some new drainage improvements.  Installation of pavements, markings, traffic sensors and adjustment of utility covers to grade will complete the project.

            (Estimated completion date, May 2006)

 

King Street Improvements, Phase 3 - North King Street between Liliha Street and Desha Lane and Austin Lane and Morris Lane:  Construction of concrete driveways, sidewalks, curb ramps, planting of trees; construction of street lighting system.  Pending revised scope of work.  Trees to be deleted.

            (Estimated completion date, April 2006)

 

Punchbowl Street Improvements, Phase I Reconstruct curb ramps, update traffic signal system and restripe pavement markings at King Street and Beretania Street intersection.

            (Estimated completion date, May 2006)

 

KAILUA

Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive.

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Kuulei Road: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6:00 p.m.

            (Estimated completion date, October 2006)

 

Reconstruction of Concrete Sidewalks, Kailua Area Kuulei Road, Uluniu Street, Kainehe Street, Kailua Road, Hahani Street, Hoolai Street, Aulike Street: Removal and reconstruction of damaged concrete sidewalk, curb and gutter areas, trimming of trees and cutting and removal of tree roots where the roots have damaged the areas, installing root barriers were required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

            (Estimated completion date, May 2006)

 

KALIHI

Curb Ramps at Kalihi Street/Lehua Street, Kalihi Street/Kuikele Street:  Construct new curb ramps, sidewalks and A.C. transitions.  Install pedestrian push buttons and striping.

            (Estimated completion date, August 2006)

 

KANEOHE

Reconstruction of Concrete Sidewalks, Kaneohe Area: Alaloa Street, Haiku Road, Kahuhipa Street, Kamehameha Highway, Kawa Street, Mehana Street:  Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the area; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated completion date, July 2006)

 

MOANALUA

Rehabilitation of Streets & Moanalua Water System Improvements:  Ala Aolani Place and portions of Ala Aolani Street, Ala Lani Street and Place, Ala Kiao Place, Ala Iolani Street and Place, Kapulei Street:  Install under drain, reconstruction and resurfacing of roadways, adjustment of utility manholes, installation of pavement markings.

            (Estimated completion date, April 2006)

 

PEARL CITY

Rehabilitation of Waimano Home Road from Kamehameha Highway to Komo Mai Drive:  Install curb ramps and traffic signals relocation.  Reconstruct failed pavement areas and resurface roadways.  Install vehicle loop sensors, and pavement markings and adjust utilities to grade.

            (Estimated completion date, June 2006)

 

PORTLOCK

Reconstruction of Concrete Sidewalks, Portlock Area:  Poipu Drive, Nawiliwili Street, Makaweli Street, Lawai Street, Lumahai Street, Lumahai Place, Hanapepe Loop, Hanapepe Place, Polihale Place, Kalalau Street, Waialae Avenue, Anahola Street.  Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the areas; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated completion date, April 2006)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:  Final inspection punch list and change order work.

            (Estimated completion date, May 2006)

 

WAIALUA

Rehabilitation of Waialua Beach Road:  Reconstruct bridge joint.

            (Estimated completion date, April 2006)

 

Waialua Beach Road Sidewalk Improvements, Phase II Waialua Beach Road (between Goodale Avenue and Haleiwa Road):  Construct new sidewalks, curb ramps, bus stop and driveways.  Install new chain link fence, traffic signs and landscaping.

            (Estimated completion date, October 2006)

 

WAIPAHU

Village Park Connector Road: Construction of a two-way connector road between Kupuna Loop in Village Park and Loaa Street in Waipahu.  Work includes roadway grading, construction of roadways, sidewalks, curb ramps and CRM and CMU walls; and installation of water lines, drain lines, electrical lines, streetlights, irrigation lines and landscaping.

            (Estimated completion date, April 2006)

 

Kahuanani Street Sewer Replacement/Rehabilitation: Installation of a new sewer line and CIPP installation along Kahuanani Street.

            (Estimated completion date, April 2006)

 

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

 

April 23, 2006 Sunday
7:00AM Starts
9:00AM End

DASH AND SPLASH BIATHLON sponsored by Kailua Canoe Club. The event is expected to have 150 participants. Run- It will start at Kailua Boat Ramp, to Kawailoa Rd., to Aalapapa Dr., counterclockwise around Lanika Lp. bike path, to Mokulua Dr., to Kawailoa Rd., to Lihiwai Rd., to end at boat ramp.  Swim- 800 yards parallel to shore down to finish area.  Contact:  Kalani L. Kaanaana 295-2575, Fax:  263-7730

 

April 23, 2006 Sunday
9:00AM Starts
11:00AM End

STARBUCKS AIDS WALK FOR LIFE sponsored by Life Foundation. The event is expected to have 2,000 participants. It will start at Kapiolani Park Band Stand, to Kalakaua Ave.,  to jogging path and cross to the mauka side., to Paki Ave. jogging/bike path,  to Kapahulu Ave., to Kalakaua Ave.,  to end at Honolulu Marathon Finish line.  Contact Catherina Pudwill  521-2437, Ext. 250  Fax:  521-1279, For more info, visit their website: http://www.aidswalkhawaii.org/

 

April 29, 2006 Saturday
7:00AM Starts
11:30AM End

PASSION FOR PERFECTION FUN RUN sponsored by Kalihi Education Foundation. The event will have 1,500 runners.  First Loop- 1.7 miles:  It will start at Bishop Museum, to Bernice St., to Kapalama Ave., to Brigham St., to Kapalama Ave., to Bernice St., to Houghtailing, to King St., to Kalihi St., to Likelike Hwy., to Bernice St., to end at Bishop Museum. Second Loop - 1.4 miles: From Bishop Museum, to Bernice St., to Houghtailing St., to King St., to Kalihi St., to Likelike Hwy., to Bernice St., to end at Bishop Museum.   Contact Roger Higa 330-4691, Fax:  833-2600

 

April 29, 2006 Saturday
4:00PM Starts
10:00PM Ends

WAIKIKI SPAM JAM STREET FESTIVAL sponsored by the AT Marketing/Waikiki Improvement Assn.  The event is expected to have 8,000+ participants.  Traffic will be diverted starting 2 pm for setup. The event will close Kalakaua Avenue, all traffic lanes/sidewalk areas, from Seaside Ave. to Kaiulani Avenue. Contact:  AT Marketing 926-1447, Fax:  926-1448, For more info, check their website:  www.at-marketing.net

 

 

The above is based on the most current information available from the event organizers as of date on bottom.  TST Division, Department of Transportation Services  Phone: 808-527-6009 Fax: 808-523-4446 Email:  ikodani@co.honolulu.hi.us

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879.

Thursday, April 20, 2006