Scheduled roadwork for the week beginning February 19, 2006, for the Department of Design  construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch).  Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

EWA

Ewa Villages, Extension of Kapolei Parkway, Phase 8A - Renton Road at future extension of Kapolei Parkway:  Construct new intersection including sewer, drainage, sidewalk, curb ramps, street lights, and landscape work.

            (Estimated completion date, February 2006)

 

Fort Weaver Road Reconstructed Sewer Pohakupuna Road (from Poloula Place to Fort Weaver Road & Fort Weaver Road (from Pohakupuna Road to Nalomele Place)

            Estimated completion date, September 2006)

 

HALEIWA

Bridge Rehabilitation at Anahulu Stream:  Remove deteriorated concrete and reinforcement, reconstruct and repair areas, modify existing railings and paint structure.

            (Estimated completion date, June 2006)

 

HONOLULU

Rehabilitation of Harding Avenue from 1st Avenue to Luawai Street, 6th Avenue from Harding Avenue to Palolo Avenue, Leahi Avenue from Kapahulu Avenue to Noela Street, 5th Avenue from Harding Avenue to Dead End:  The work primarily consists of reconstruction, milling and resurfacing the roadways.  Also, included is the reconstruction of some concrete curbs, gutters, driveways, aprons, sidewalks, and some new drainage improvements.  Installation of pavements, markings, traffic sensors and adjustment of utility covers to grade will complete the project.

            (Estimated completion date, May 2006)

 

King Street Improvements, Phase 3 - North King Street between Liliha Street and Desha Lane and Austin Lane and Morris Lane:  Construction of concrete driveways, sidewalks, curb ramps, planting of trees; construction of street lighting system.  Pending revised scope of work.  Trees to be deleted.

            (Estimated completion date, February 2006)

 

Curb Ramps at Liliha Street/Kuakini Street, Liliha Street/Kunawai Lane/Elena Street, Liliha Street/Borges Lane/Dayton Lane, Liliha Street/Bates Street, Nuuanu Avenue between Judd Street and Robinson Lane and Wyllie Street, Pacific Heights Road/Pauoa Road:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, February 2006)

 

KAILUA

Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive.

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Kuulei Road: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6:00 p.m.

 

Reconstruction of Concrete Sidewalks, Kailua Area Kuulei Road, Uluniu Street, Kainehe Street, Kailua Road, Hahani Street, Hoolai Street, Aulike Street: Removal and reconstruction of damaged concrete sidewalk, curb and gutter areas, trimming of trees and cutting and removal of tree roots where the roots have damaged the areas, installing root barriers were required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

            (Estimated completion date, May 2006

 

KAIMUKI

Pooleka Street Drainage Improvements End of Pooleka Street to Waiomao Stream:  Install new drain system. Upgrade water and sewer facilities.

            (Estimated completion date, June 2006)

 

KALIHI

Curb Ramps at Mokauea Street/Auiki Street, Mokauea Street/Hart Street, Mokauea Street/Kalani Street, Mokauea Street/Hau Street, Mokauea Street/Colburn Street, Dillingham Boulevard between Kalihi/McNeil Street, and Dillingham Boulevard between Alakawa/Kokea Street:  Construct new curb ramps and sidewalks.  Install pavement striping and markings.

            (Estimated completion date, February 2006)

 

KANEOHE

Reconstruction of Concrete Sidewalks, Kaneohe Area: Alaloa Street, Haiku Road, Kahuhipa Street, Kamehameha Highway, Kawa Street, Mehana Street:  Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the area; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated completion date, July 2006)

 

MAKAKILO

Curb Ramps at Various Locations, FY 2002(5) Panama Street/Hame Street/Welo Street: Construct new curb ramps and AC transitions.

            (Estimated completion date, February 2006)

 

MILILANI

Curb Ramps at Hokuiwa Street/Kawau Street, Kaloapau Street/Kehepue Loop, Alapoai Street/Alapoai Place, Hokuala Street/Hokuili Street, Anania Drive/Puanane Loop, Anania Drive/Hakamoa Street, Anania Drive/Kiaha Loop, Anania Drive/Kaukalia Street, Anania Drive/Lanikuhana Ave, Anania Drive/Hokualii Street, Anania Drive/Kapuahi Street, Waihonu Street/Waimakua Drive, Waiehu Place/Waimakua Drive, Kipapa Drive/Moenamanu Street, Hookelewaa Street/Kipapa Drive:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install striping, marking and markers.

            (Estimated completion date, February 2006)

 

MOANALUA

Rehabilitation of Streets & Moanalua Water System Improvements:  Ala Aolani Place and portions of Ala Aolani Street, Ala Lani Street and Place, Ala Kiao Place, Ala Iolani Street and Place, Kapulei Street:  Install under drain, reconstruction and resurfacing of roadways, adjustment of utility manholes, installation of pavement markings.

            (Estimated completion date, February 2006)

 

NORTH SHORE

Curb Ramps at Akule Street/Aweoweo Street, Au Street/Aweoweo Street, Au Street/Apuhihi Street, Akule Street/Apuhihi Street:  Construct new curb ramps, sidewalks, AC transitions.  Install striping, marking and markers.

            (Estimated completion date, February 2006)

 

PEARL CITY

Rehabilitation of Waimano Home Road from Kamehameha Highway to Komo Mai Drive:  Install curb ramps and traffic signals relocation.  Reconstruct failed pavement areas and resurface roadways.  Install vehicle loop sensors, and pavement markings and adjust utilities to grade.

            (Estimated completion date, June 2006)

 

PORTLOCK

Reconstruction of Concrete Sidewalks, Portlock Area:  Poipu Drive, Nawiliwili Street, Makaweli Street, Lawai Street, Lumahai Street, Lumahai Place, Hanapepe Loop, Hanapepe Place, Polihale Place, Kalalau Street, Waialae Avenue, Anahola Street.  Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the areas; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated Completion Date, February 2006).

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:  Final inspection punch list and change order work.

            (Estimated completion date, February 2006)

 

Curb Ramps at Ala Ilima Street/Ala Maile Place, Ala Ilima Street/Ala Nanala Street, Ala Nanala Street/Likini Street, Ala Ilima Street/Ala Melia Place, Ala Ilima Street/Ala Nanu Street, Ala Nanu Street/Likini Street, Ala Ilima Street/Ala Napuaa Place.  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pavement striping, marking and markers.

            (Estimated completion date, February 2006)

 

WAHIAWA

Curb Ramps at California Avenue/Kaalalo Place, Kilani Avenue/Mango Street, Kilani Avenue/Westervelt Street, Kilani Avenue/Lehua Street, California Avenue/Lehua Street/Muliwai Avenue, California Avenue/North Cane Street, Kilani Avenue/North Cane Street, California Avenue/Uuku Street:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, February 2006)

 

WAIALUA

Rehabilitation of Waialua Beach Road:  Reconstruct bridge joint.

            (Estimated completion date, February 2006)

 

Curb Ramps at Kupahu Street/Nahoa Street:  Construct new curb ramps.  Install striping and markers.

            (Estimated completion date, February 2006)

 

WAIKIKI

Curb Ramps at Ala Wai Boulevard/Ohua Street, Ala Wai Boulevard/Walina Street, Ala Wai Boulevard/Nahua Street, Ala Wai Boulevard/Nohonani Street:  Construct new curb ramps and sidewalks.  Install pedestrian push bottons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, February 2006)

 

WAIMALU

Curb Ramps at Kamahao Pl./Kamahao St., Kaahumanu St./Oihana Pl./Kuahao Pl., Kaahele St./Moanalua Rd., Kilinoe St./Kaahele St., Kaahele St./Lulu St., Kaonohi St. at Moanalua Rd., Koauke St./Moanalua Rd./Pali Momi St., and Iho Pl./Palula Wy.:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle loop detectors, striping, marking and markers.

            (Estimated completion date, February 2006)

 

WAIPAHU

Village Park Connector Road: Construction of a two-way connector road between Kupuna Loop in Village Park and Loaa Street in Waipahu.  Work includes roadway grading, construction of roadways, sidewalks, curb ramps and CRM and CMU walls; and installation of water lines, drain lines, electrical lines, streetlights, irrigation lines and landscaping.

            (Estimated completion date, February 2006)

 

Curb Ramps at Waipahu Street/Hene Street, Waipahu Street/Leowahine Street, Waipahu Street/Amokii Street, Waipahu Street/Ikepono Pl., Leokane Street/Leoleo Street, Pupuole Street/Pupuole Pl., Waipahu Street/Waipahu Depot Street,, Waipahu Street/Paiwa Street, and Waipahu between Mokuloa Street and Paiwa Street, Waipahu Street,/Ana Lane/Mahoe Street:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, February 2006)

 

Kahuanani Street Sewer Replacement/Rehabilitation: Installation of a new sewer line and CIPP installation along Kahuanani Street.

            (Estimated completion date, March 2006)

 

WAIPIO

Curb Ramps at Various Locations, FY2002(5) Ka Uka Boulevard/Ukee Street, Ka Uka Boulevard/Waipio Uka Street/Pauhi Street:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install striping, marking and markers.

            (Estimated completion date, February 2006)

 

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

 

February 20, 2006 Monday
6:50AM Starts
11:00AM Ends

GREAT ALOHA RUN sponsored by Great Aloha Run/Carole Kai Charities. The event is expected to have 26,000 runners. It will start on Nimitz Hwy. at Nuuanu Ave., to Nimitz Hwy., ewa bound, to Kamehameha Hwy then under the H-1 viaduct, to Kamehameha Hwy., to Aloha Stadium service road into the main gate of Aloha Stadium, to finish in the north end zone of Aloha Stadium. Contact Alan Sunio 528-7388 For more info, visit their website: http://www.greataloharun.com/  

 

 

The above is based on the most current information available from the event organizers as of date on bottom.  TST Division, Department of Transportation Services  Phone: 808-527-6009 Fax: 808-523-4446 Email:  ikodani@co.honolulu.hi.us

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879.

Thursday, February 16, 2006

© Copyright 2002-2006 City and County of Honolulu, Hawaii