ROAD WORK WEEKLY REPORT

 

Scheduled roadwork for the week beginning March 12, 2006, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch).  Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

ALEWA

Curb Ramps at Gulick Avenue/North School Street, Hala Drive/Makuahine Street, Hauiki Street/North School Street, Kino Street/North School Street, Linapuni Street/North School Street, Makuahine Street/North School Street:  Construct new curb ramps, sidewalks and A.C. transition.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, August 2006)

 

EWA

Ewa Villages, Extension of Kapolei Parkway, Phase 8A - Renton Road at future extension of Kapolei Parkway:  Construct new intersection including sewer, drainage, sidewalk, curb ramps, street lights, and landscape work.

            (Estimated completion date, March 2006)

 

Fort Weaver Road Reconstructed Sewer Pohakupuna Road (from Poloula Place to Fort Weaver Road & Fort Weaver Road (from Pohakupuna Road to Nalomele Place)

            Estimated completion date, September 2006)

 

HALEIWA

Bridge Rehabilitation at Anahulu Stream:  Remove deteriorated concrete and reinforcement, reconstruct and repair areas, modify existing railings and paint structure.

            (Estimated completion date, June 2006)

 

HONOLULU

Curb Ramps at Alakea Street/Merchant Street, Alakea Street/Queen Street, Bethel Street/Merchant Street, Bishop Street/Merchant Street, Halekauwila Street/Mililani Street, Maunakea Street/North Kukui Street, Merchant Street/Richards Street, Mililani Street/Queen Street, North Kukui Street/Nuuanu Street, North Kukui/River Street, Pauahi Street/Nuuanu Avenue, Queen Street/Richards Street, Queen Emma Street/Vineyard Street:  Construct new curb ramps, sidewalks, AC transitions.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, August 2006)

 

Emergency Repair of Beretania Street between Alakea Street and Bishop Street:  Reconstruct A.C. pavement and gutter along the two mauka lanes.  Work will be limited to Saturdays, weather permitting.

            (Estimated completion date, March 2006)

 

Rehabilitation of Harding Avenue from 1st Avenue to Luawai Street, 6th Avenue from Harding Avenue to Palolo Avenue, Leahi Avenue from Kapahulu Avenue to Noela Street, 5th Avenue from Harding Avenue to Dead End:  The work primarily consists of reconstruction, milling and resurfacing the roadways.  Also, included is the reconstruction of some concrete curbs, gutters, driveways, aprons, sidewalks, and some new drainage improvements.  Installation of pavements, markings, traffic sensors and adjustment of utility covers to grade will complete the project.

            (Estimated completion date, May 2006)

 

King Street Improvements, Phase 3 - North King Street between Liliha Street and Desha Lane and Austin Lane and Morris Lane:  Construction of concrete driveways, sidewalks, curb ramps, planting of trees; construction of street lighting system.  Pending revised scope of work.  Trees to be deleted.

            (Estimated completion date, March 2006)

 

Curb Ramps at Liliha Street/Kuakini Street and Liliha Street/Bates Street:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, March 2006)

 

KAILUA

Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive.

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Kuulei Road: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6:00 p.m.

 

Reconstruction of Concrete Sidewalks, Kailua Area Kuulei Road, Uluniu Street, Kainehe Street, Kailua Road, Hahani Street, Hoolai Street, Aulike Street: Removal and reconstruction of damaged concrete sidewalk, curb and gutter areas, trimming of trees and cutting and removal of tree roots where the roots have damaged the areas, installing root barriers were required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

            (Estimated completion date, May 2006

 

KALIHI

Curb Ramps at Kalihi Street/Lehua Street, Kalihi Street/Kuikele Street:  Construct new curb ramps, sidewalks and A.C. transitions.  Install pedestrian push buttons and striping.

            (Estimated completion date, August 2006)

 

KANEOHE

Reconstruction of Concrete Sidewalks, Kaneohe Area: Alaloa Street, Haiku Road, Kahuhipa Street, Kamehameha Highway, Kawa Street, Mehana Street:  Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the area; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated completion date, July 2006)

 

MAKAKILO

Curb Ramps at Various Locations, FY 2002(5) Panama Street/Hame Street/Welo Street: Construct new curb ramps and AC transitions.

            (Estimated completion date, March 2006)

 

MILILANI

Curb Ramps at Hokuiwa Street/Kawau Street, Kaloapau Street/Kehepue Loop, Alapoai Street/Alapoai Place, Hokuala Street/Hokuili Street, Anania Drive/Puanane Loop, Anania Drive/Hakamoa Street, Anania Drive/Kiaha Loop, Anania Drive/Kaukalia Street, Anania Drive/Lanikuhana Ave, Anania Drive/Hokualii Street, Anania Drive/Kapuahi Street, Waihonu Street/Waimakua Drive, Waiehu Place/Waimakua Drive, Kipapa Drive/Moenamanu Street, Hookelewaa Street/Kipapa Drive:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install striping, marking and markers.

            (Estimated completion date, March 2006)

 

MOANALUA

Rehabilitation of Streets & Moanalua Water System Improvements:  Ala Aolani Place and portions of Ala Aolani Street, Ala Lani Street and Place, Ala Kiao Place, Ala Iolani Street and Place, Kapulei Street:  Install under drain, reconstruction and resurfacing of roadways, adjustment of utility manholes, installation of pavement markings.

            (Estimated completion date, March 2006)

 

NORTH SHORE

Curb Ramps at Akule Street/Aweoweo Street, Au Street/Aweoweo Street, Au Street/Apuhihi Street, Akule Street/Apuhihi Street:  Construct new curb ramps, sidewalks, AC transitions.  Install striping, marking and markers.

            (Estimated completion date, March 2006)

 

PEARL CITY

Rehabilitation of Waimano Home Road from Kamehameha Highway to Komo Mai Drive:  Install curb ramps and traffic signals relocation.  Reconstruct failed pavement areas and resurface roadways.  Install vehicle loop sensors, and pavement markings and adjust utilities to grade.

            (Estimated completion date, June 2006)

 

PORTLOCK

Reconstruction of Concrete Sidewalks, Portlock Area:  Poipu Drive, Nawiliwili Street, Makaweli Street, Lawai Street, Lumahai Street, Lumahai Place, Hanapepe Loop, Hanapepe Place, Polihale Place, Kalalau Street, Waialae Avenue, Anahola Street.  Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the areas; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated completion date, March 2006)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:  Final inspection punch list and change order work.

            (Estimated completion date, March 2006)

 

Curb Ramps at Ala Ilima Street/Ala Maile Place, Ala Ilima Street/Ala Nanala Street, Ala Nanala Street/Likini Street, Ala Ilima Street/Ala Melia Place, Ala Ilima Street/Ala Nanu Street, Ala Nanu Street/Likini Street, Ala Ilima Street/Ala Napuaa Place.  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pavement striping, marking and markers.

            (Estimated completion date, March 2006)

 

WAHIAWA

Curb Ramps at California Avenue/Kaalalo Place, Kilani Avenue/Mango Street, Kilani Avenue/Westervelt Street, Kilani Avenue/Lehua Street, California Avenue/Lehua Street/Muliwai Avenue, California Avenue/North Cane Street, Kilani Avenue/North Cane Street, California Avenue/Uuku Street:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, March 2006)

 

WAIALUA

Rehabilitation of Waialua Beach Road:  Reconstruct bridge joint.

            (Estimated completion date, March 2006)

 

Curb Ramps at Kupahu Street/Nahoa Street:  Construct new curb ramps.  Install striping and markers.

            (Estimated completion date, March 2006)

 

Waialua Beach Road Sidewalk Improvements, Phase II Waialua Beach Road (between Goodale Avenue and Haleiwa Road):  Construct new sidewalks, curb ramps, bus stop and driveways.  Install new chain link fence, traffic signs and landscaping.

            (Estimated completion date, October 2006)

 

WAIMALU

Curb Ramps at Kamahao Pl./Kamahao St., Kaahumanu St./Oihana Pl./Kuahao Pl., Kaahele St./Moanalua Rd., Kilinoe St./Kaahele St., Kaahele St./Lulu St., Kaonohi St. at Moanalua Rd., Koauke St./Moanalua Rd./Pali Momi St., and Iho Pl./Palula Wy.:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle loop detectors, striping, marking and markers.

            (Estimated completion date, March 2006)

 

WAIPAHU

Village Park Connector Road: Construction of a two-way connector road between Kupuna Loop in Village Park and Loaa Street in Waipahu.  Work includes roadway grading, construction of roadways, sidewalks, curb ramps and CRM and CMU walls; and installation of water lines, drain lines, electrical lines, streetlights, irrigation lines and landscaping.

            (Estimated completion date, March 2006)

 

Curb Ramps at Waipahu Street/Hene Street, Waipahu Street/Leowahine Street, Waipahu Street/Amokii Street, Waipahu Street/Ikepono Pl., Leokane Street/Leoleo Street, Pupuole Street/Pupuole Pl., Waipahu Street/Waipahu Depot Street,, Waipahu Street/Paiwa Street, and Waipahu between Mokuloa Street and Paiwa Street, Waipahu Street,/Ana Lane/Mahoe Street:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, March 2006)

 

Kahuanani Street Sewer Replacement/Rehabilitation: Installation of a new sewer line and CIPP installation along Kahuanani Street.

            (Estimated completion date, March 2006)

 

WAIPIO

Curb Ramps at Ka Uka Boulevard/Ukee Street, Ka Uka Boulevard/Waipio Uka Street/Pauhi Street:  Construct new curb ramps, sidewalks, AC transitions and driveways.  Install striping, marking and markers.

            (Estimated completion date, March 2006)

 

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

 

March 12, 2006 Sunday
6:00AM Starts
11:00AM Ends

JOHNNY FAERBER 10K & 1K KEIKI CHALLENGE RUN sponsored by RRCA/Mid Pacific Roadrunners Club. The event is expected to have 400 runners. It will start on Kalakaua Ave., to Diamond Head Rd., to Kahala Ave., to Paikau St., to Diamond Head Rd., to 22nd Ave., to Kilauea Ave., to Diamond Head Rd., to Kalakaua Ave., to finish at Honolulu Marathon finish line area. Contact: John Simonds 373-3609 For more info, visit their website: http://www.mprrc.com/

 

March 12, 2006 Sunday
4:30PM Starts
7:30PM Ends

HONOLULU FESTIVALS PARADE sponsored by JTB Hawaii/Honolulu Festival Organizing Committee.  The event is expected to have 6,000 marchers, 20 vehicles, 5 floats, 3 bands, 12 Mikoshi.  It will start at Kalakaua Ave. at Saratoga Rd., kkhd on Kalakaua Ave., to end at Waikiki Shell parking lot, Queen Kapiolani Park. Contact Nelson Fujio 591-8311 Fax: 591-0257  For more info, visit their website:  www.honolulufestival.com 

 

March 13, 2006 Monday
8:30AM Starts
10:00AM Ends

KAPOLEI HIGH SCHOOL HURRICANE RUN sponsored by Kapolei High School.  The event is expected to have 700 runners.  It will start on Kapolei High School, to Kapolei Parkway, to Kamaaha Ave, to Kamaaha Loop, thru Kapolei Recreation Center, cross Kaiau Ave, and end at Kapolei High School. Contact Matthew Masuyama 692-8200 x2392 Fax: 692-8255 

 

March 17, 2006 Friday
12:00PM Starts
1:30PM Ends

ST. PATRICK'S DAY PARADE sponsored by Friendly Sons of Saint Patrick of Hawaii.  The event is expected to have 800 marchers, 50 vehicles, 2 floats, 5 bands.  It will start at Saratoga Rd./Kalakaua Ave., to Kalakaua Ave., to Monsarrat Ave.,  to end at Queen Kapiolani Park.  Contact Kevin Kelly 956-6651 Fax: 956-5308

 

March 17, 2006 Friday
5:30PM Starts
11:00PM Ends

ST. PATRICK'S DAY BLOCK PARTY sponsored by Murphy's Bar & Grill. The event is expected to have 3,000+ participants.  Curb lanes will be closed from 3 pm for setup. The event will close 1) NUUANU AVE., all traffic lanes/sidewalk areas, from King St. to Nimitz Hwy. 2) MERCHANT ST., all traffic lanes/sidewalk areas, from Nuuanu Ave. to Bethel St. 3) MARIN LN., all traffic lanes/sidewalk areas.  Contact Don Murphy 531-0422, 754-1502 Fax: 533-4943

 

March 18, 2006 Saturday
7:00PM Starts
9:00PM Ends

INTERNATIONAL DAY OF PROTEST AGAINST THE WAR WITH IRAQ MARCH sponsored by Hawaii Not In Our Name Coalition.  The event is expected to have 500 marchers. It will start at Zoo Parking Lot at Kapahulu Ave., to Kuhio Ave., to Lewers St., to Kalakaua Ave., end at Zoo at Kalakaua/Kapahulu Aves.  Contact: Carolyn Hadfield 286-8288 E-mail:  carolina@lava.net

 

 

The above is based on the most current information available from the event organizers as of date on bottom.  TST Division, Department of Transportation Services  Phone: 808-527-6009 Fax: 808-523-4446 Email:  ikodani@co.honolulu.hi.us

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879.

Thursday, March 09, 2006