You are here:  Main / Customer Services / Public Communications Division / honnews06 / Road Work Weekly Report

ROAD WORK WEEKLY REPORT

 

Scheduled roadwork for the week beginning May 21, 2006, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch).  Roadwork is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

ALEWA

Curb Ramps at Gulick Avenue/North School Street, Hala Drive/Makuahine Street, Hauiki Street/North School Street, Kino Street/North School Street, Linapuni Street/North School Street, Makuahine Street/North School Street:  Construct new curb ramps, sidewalks and A.C. transition.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, August 2006)

 

EWA

Ewa Villages, Extension of Kapolei Parkway, Phase 8A - Renton Road at future extension of Kapolei Parkway:  Construct new intersection including sewer, drainage, sidewalk, curb ramps, street lights, and landscape work.

            (Estimated completion date, May 2006)

 

HALEIWA

Bridge Rehabilitation at Anahulu Stream:  Remove deteriorated concrete and reinforcement, reconstruct and repair areas, modify existing railings and paint structure.

            (Estimated completion date, June 2006)

 

HAWAII KAI

Curb Ramps at West Hind Drive & Nenue Street, Ulua Street & Mamaki Street, Ulua Street & Mahimahi Street, Awini Street & Kawaihine Street, Pepeekeo Street & Pepeekeo Place, Ainapo Street & Pepeekeo Place, Pepeekeo Street & Driveway, Hahaione Street & Hawaii Kai Drive, Ehu Wai Place, Hawaii Kai Drive & Kaluanui Road, Hawaii Kai Drive & Wailua Street:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers.

            (Estimated completion date, October 2006)

 

HONOLULU

Curb Ramps at Alakea Street/Merchant Street, Alakea Street/Queen Street, Bethel Street/Merchant Street, Bishop Street/Merchant Street, Halekauwila Street/Mililani Street, Maunakea Street/North Kukui Street, Merchant Street/Richards Street, Mililani Street/Queen Street, North Kukui Street/Nuuanu Street, North Kukui/River Street, Pauahi Street/Nuuanu Avenue, Queen Street/Richards Street, Queen Emma Street/Vineyard Street:  Construct new curb ramps, sidewalks, AC transitions.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, August 2006)

 

Curb Ramps at Bishop Street between South Hotel Street and South King Street, Kekaulike Street/North Hotel Street, North Hotel Street/River Street, South King Street/Ward Avenue, Cooke Street/South King Street, Auahi Street/Kamakee Street, Middle Street/Rose Street, Kahauiki Street/Middle Street, Kamehameha IV Road/School Street, Hihio Place/Kamehameha IV Road, Kamehameha IV Road/Kilolani Place, Kamehameha IV Road/Kilohi Street, Kamehameha IV Road/Aoao Street, Kamehameha IV Road/Kalena Drive, Kamehameha IV Road (mid-block), Horner Lane/Kaua Street, Kamehameha IV Road/Kino Street, Campbell Avenue/Herbert Street, Campbell Avenue/Castle Street, Campbell Avenue/Brokaw Street, Campbell Avenue/Catherine Street, Campbell Avenue/Kaunaoa Street, Kanaina Avenue/Kaunaoa Street, Campbell Avenue/Esther Street:  Construct new curb ramps, sidewalks and AC transition.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated Completion Date, November 2006)

 

Rehabilitation of Harding Avenue from 1st Avenue to Luawai Street, 6th Avenue from Harding Avenue to Palolo Avenue, Leahi Avenue from Kapahulu Avenue to Noela Street, 5th Avenue from Harding Avenue to Dead End:  The work primarily consists of reconstruction, milling and resurfacing the roadways.  Also, included is the reconstruction of some concrete curbs, gutters, driveways, aprons, sidewalks, and some new drainage improvements.  Installation of pavements, markings, traffic sensors and adjustment of utility covers to grade will complete the project.

            (Estimated completion date, May 2006)

 

King Street Improvements, Phase 3 - North King Street between Liliha Street and Desha Lane and Austin Lane and Morris Lane:  Construction of concrete driveways, sidewalks, curb ramps, planting of trees; construction of street lighting system.  Pending revised scope of work.  Trees to be deleted.

            (Estimated completion date, April 2006)

 

Punchbowl Street Improvements, Phase I Reconstruct curb ramps, update traffic signal system and restripe pavement markings at King Street and Beretania Street intersection.

            (Estimated completion date, May 2006)

 

KAHALA

Curb Ramps at Hunakai Street between Pueo Street & Waialae Avenue:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers.

            (Estimated completion date, October 2006)

 

KAILUA

Curb Ramps at Kaneohe Bay Drive & Molo Street, Kailua Road & Oneawa Street:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers.

            (Estimated completion date, October 2006)

 

Kainehe, Hamakua, & Keolu Reconstructed Sewer: CIP work on Kainehe Street and Keolu Drive; Shaft Construction and Microtunneling on Hamakua Drive.

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Kuulei Road: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6:00 p.m.

            (Estimated completion date, October 2006)

 

Reconstruction of Concrete Sidewalks, Kailua Area Kuulei Road, Uluniu Street, Kainehe Street, Kailua Road, Hahani Street, Hoolai Street, Aulike Street: Removal and reconstruction of damaged concrete sidewalk, curb and gutter areas, trimming of trees and cutting and removal of tree roots where the roots have damaged the areas, installing root barriers were required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

            (Estimated completion date, May 2006)

 

Reconstruction of Concrete Sidewalks, Keolu Drive: The work involves the reconstruction of existing sidewalks, curbs and gutters and trimming of trees.

            (Estimated completion date, January 2007)

 

KAIMUKI

Curb Ramps at 16th Avenue & Waialae Avenue:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers and upgrade traffic signal system.

            (Estimated completion date, October 2006)

 

KAKAAKO

Curb Ramps at South Street & Kawaiahao Street, Ward Street & HECO driveway:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers.

            (Estimated completion date, October 2006)

 

KALIHI

Curb Ramps at Kalihi Street/Lehua Street, Kalihi Street/Kuikele Street:  Construct new curb ramps, sidewalks and A.C. transitions.  Install pedestrian push buttons and striping.

            (Estimated completion date, August 2006)

 

KANEOHE

Reconstruction of Concrete Sidewalks, Kaneohe Area: Alaloa Street, Haiku Road, Kahuhipa Street, Kamehameha Highway, Kawa Street, Mehana Street:  Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the area; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated completion date, July 2006)

 

Curb Ramps at Hui Aeko Street & Hui Aeko Place, Hui Iwa Street between Kahekili Street and Hui Iwa Place, Hui Akikiki Place & Hui Iwa Street, Alaloa Street & Haiku Road, Kahuhipa Street & Alaloa Street, Kam Hwy., Lilipuna Street & Kahuhipa Street, Kam Hwy., Keaahala Street & William Henry Road, Kam Hwy., Paleka Road & Waikalua Road:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers and upgrade traffic signal system.

            (Estimated completion date, October 2006)

 

KAPAHULU

Curb Ramps at Date Street & Hausten Street:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers.

            (Estimated completion date, October 2006)

 

MAKIKI

Curb Ramps at Anianiku Street & Auwaiolimu Street, Lewalani Drive, Mott-Smith Drive & Piikoi Street, Wilder Avenue & Kewalo Street, Wilder Avenue & Keeaumoku Street, Wilder Avenue & Makiki Street, Punahou Street & Wilder Avenue, Punahou Street & Clark Street, Punahou Street, Manoa Road & Nehoa Street, Wilder Street & Alexander Street, Wilder Street, Farrington Street & Metcalf Street:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers and upgrade traffic signal system.

            (Estimated completion date, October 2006)

 

MOANALUA

Rehabilitation of Streets & Moanalua Water System Improvements:  Ala Aolani Place and portions of Ala Aolani Street, Ala Lani Street and Place, Ala Kiao Place, Ala Iolani Street and Place, Kapulei Street:  Install under drain, reconstruction and resurfacing of roadways, adjustment of utility manholes, installation of pavement markings.

            (Estimated completion date, May 2006)

 

PEARL CITY

Rehabilitation of Waimano Home Road from Kamehameha Highway to Komo Mai Drive:  Install curb ramps and traffic signals relocation.  Reconstruct failed pavement areas and resurface roadways.  Install vehicle loop sensors, and pavement markings and adjust utilities to grade.

            (Estimated completion date, June 2006)

 

PORTLOCK

Reconstruction of Concrete Sidewalks, Portlock Area:  Poipu Drive, Nawiliwili Street, Makaweli Street, Lawai Street, Lumahai Street, Lumahai Place, Hanapepe Loop, Hanapepe Place, Polihale Place, Kalalau Street, Waialae Avenue, Anahola Street.  Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the areas; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated completion date, May 2006)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:  Final inspection punch list and change order work.

            (Estimated completion date, May 2006)

 

WAIALUA

Rehabilitation of Waialua Beach Road:  Reconstruct bridge joint.

            (Estimated completion date, May 2006)

 

Waialua Beach Road Sidewalk Improvements, Phase II Waialua Beach Road (between Goodale Avenue and Haleiwa Road):  Construct new sidewalks, curb ramps, bus stop and driveways.  Install new chain link fence, traffic signs and landscaping.

            (Estimated completion date, October 2006)

 

WAIPAHU

Village Park Connector Road: Construction of a two-way connector road between Kupuna Loop in Village Park and Loaa Street in Waipahu.  Work includes roadway grading, construction of roadways, sidewalks, curb ramps and CRM and CMU walls; and installation of water lines, drain lines, electrical lines, streetlights, irrigation lines and landscaping.

            (Estimated completion date, April 2006)

 

 

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

 

May 25, 2006 Thursday
8:45AM Starts
10:30AM Ends

WAIPAHU HIGH SCHOOL FUN RUN/WALK sponsored by Waipahu High School. The event is expected to have 650 participants.  It will start at Waipio Peninsula Soccer Park Stadium, to (1) one coned mauka curb lane on Waipio Pt. Access Rd.,  to bike path gravel road, to end at Waipahu High School Stadium.  Contact Abelardo Villanueva, Jr. 554-1278 Fax:  675-0257

 

May 25-26, 2006 Thursday to Friday
Various Times

TROY BARBOZA LAW ENFORCEMENT TORCH RUN sponsored by Special Olympics Hawaii.  The event is expected to have 1,000 participants in relay teams, escorted by HPD. DAY 1: Thursday, 11:30 am- Start, State Capitol on Beretania St, left onto Bishop St, left onto King St, left onto Alakea St, left onto Bertania St, left onto Bishop St, left onto King St, left onto Keala Makai St, end at Sister Roberta Derby Park at 801 Beretania St. DAY 2: Friday, 6:30 pm  Start,  Ft. DeRussy Park on Maluhia Rd, to Kalia Rd, to Ala Moana Blvd, Kalakaua Ave, Kapahulu Ave, Old Waialae Rd, end at Les Murakami Stadium.  Walk:  Koko Head/Waialae Ave, Old Waialae Rd, Kalei Rd, Lower Campus Rd, end at Les Murakami Stadium.  Contact Ben Moszkowicz 368-0680.  For more info, visit their website: http://www.specialolympicshawaii.org/index.html

 

May 26, 2006 Friday to 
May 29, 2006 Monday

5:00AM Starts
7:30PM Ends

MEMORIAL DAY PARKING RESTRICTIONS sponsored by City and County of Honolulu.  Parking will be prohibited on: 1)PUOWAINA DRIVE,           both sides, between Hookui Street and the gates to the National Memorial Cemetery of the Pacific at Punchbowl., 2) HOOKUI STREET,    both sides, between Puowaina Drive and Auwaiolimu Street. Contact: DTS-TST Div. 527-6009

 

May 27, 2006 Saturday
6:00AM Starts
11:00AM Ends

NORTH SHORE TRIATHLON sponsored by North Shore Swim Club.  The event is expected to have 300 triathletes. SWIM: will start at Mokuleia beach park out and back course ending on beach near transition area.  BIKE: Mokuleia transition area, to Farrington Hwy., west on Farrington Hwy., to Kahui Rd., to Kanoulu St., to Kane Pl., to Kanoena Pl.-to Kanoulu St., to Farrington Hwy., west on Farrington Hwy,  back to Mokuleia Beach Park transition area.  RUN: From Mokuleia Beach Park transition area,  right onto Farrington Hwy-west on Farrington Hwy-turnaround on Farrington Hwy-east on Farrington Hwy-finish at Mokuleia Beach Park.  Contact Chris Gardner 638-8173  E-mail:  guardog2000@yahoo.com  For more info, visit their website: http://www.hawaiiswim.com/ 

 

 

The above is based on the most current information available from the event organizers as of date on bottom.  TST Division, Department of Transportation Services  Phone: 808-527-6009 Fax: 808-523-4446 Email:  ikodani@co.honolulu.hi.us

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879.

Thursday, May 18, 2006

© Copyright 2002-2006 City and County of Honolulu, Hawaii
Privacy Statement | Technical Support | Customer Service | Policy | Accessibility | Diversity Statement