| You are here: Main / Customer Services / Public Communications Division / honnews06 / Road Work Weekly Report |
|
Scheduled road work for the week beginning October 15, 2006, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch) is listed below. Road work is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted. AIEA Miscellaneous Guardrail Improvements, FY 2005 - 99-274 Aiea Heights Drive, 66-826 Haleiwa Road, 41-771 Kumuhau Street: Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry, and other incidental related work. (Estimated completion date, April 2007) EWA Fort Weaver Road Manhole and Pipe Rehabilitation: Rehabilitate the existing sewer line with CIPP along Fort Weaver Road from Renton Road to Geiger Road. (Estimated completion date, October 2006) HALEIWA Bridge Rehabilitation at Anahulu Stream: Remove deteriorated concrete and reinforcement, reconstruct and repair areas, modify existing railings seal and pave bridge deck, and paint structure. Bridge to be closed for 7 to 10 days beginning October 16, 2006 in order to strip, prep, and reconstruct the concrete deck. (Estimated completion date, November 2006) HAWAII KAI Curb Ramps at West Hind Drive & Nenue Street, Ulua Street & Mamaki Street, Ulua Street & Mahimahi Street, Awini Street & Kawaihine Street, Pepeekeo Street & Pepeekeo Place, Ainapo Street & Pepeekeo Place, Pepeekeo Street & Driveway, Hahaione Street & Hawaii Kai Drive, Ehu Wai Place, Hawaii Kai Drive & Kaluanui Road, Hawaii Kai Drive & Wailua Street: Construct new curb ramps, sidewalks and A.C. transition. Install pavement striping, markings and markers. (Estimated completion date, October 2006) Rehabilitation of Streets, Unit 5A, Beretania Street from N. King St. to Alapai St. Tone for fiber optic cable. (Estimated completion date, September 2007) Curb Ramps at Bishop Street between South Hotel Street and South King Street, Kekaulike Street/North Hotel Street, North Hotel Street/River Street, South King Street/Ward Avenue, Cooke Street/South King Street, Auahi Street/Kamakee Street, Middle Street/Rose Street, Kahauiki Street/Middle Street, Kamehameha IV Road/School Street, Hihio Place/Kamehameha IV Road, Kamehameha IV Road/Kilolani Place, Kamehameha IV Road/Kilohi Street, Kamehameha IV Road/Aoao Street, Kamehameha IV Road/Kalena Drive, Kamehameha IV Road (mid-block), Horner Lane/Kaua Street, Kamehameha IV Road/Kino Street, Campbell Avenue/Herbert Street, Campbell Avenue/Castle Street, Campbell Avenue/Brokaw Street, Campbell Avenue/Catherine Street, Campbell Avenue/Kaunaoa Street, Kanaina Avenue/Kaunaoa Street, Campbell Avenue/Esther Street: Construct new curb ramps, sidewalks and AC transition. Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers. (Estimated completion date, December 2006) Fort St. Mall & Hotel Street Sewer Replacement/Rehabilitation: Sewer line replacement and CIPP work along Hotel Street between Bethel Street and Bishop Street. (Estimated completion date, December 2006 Rehabilitation of Harding Avenue from 1st Avenue to Luawai Street, 6th Avenue from Harding Avenue to Palolo Avenue, Leahi Avenue from Kapahulu Avenue to Noela Street, 5th Avenue from Harding Avenue to Dead End: Installation of additional arrows at 6th Avenue and Waialae Avenue. (Estimated completion date, October 2006) King Street Improvements, Phase 3 - North King Street between Liliha Street and Desha Lane and Austin Lane and Morris Lane: Construction of concrete driveways, sidewalks, curb ramps, planting of trees; construction of street lighting system. Pending revised scope of work. Trees to be deleted. (Estimated completion date, November 2006) Curb Ramps at Lowrey Avenue/Kaloauiki Place, Lowrey Avenue/Kanu Street, Woodlawn Drive near Manoa Stream: Construct new curb ramps, sidewalks, AC transitions. Install pavement striping, adjust utility boxes, and relocate street signs and posts. (Estimated completion date, November 2006) Rehabilitation of Various Streets, Unit 37 –South King Street between McCully Street and Old Waialae Road, East/West Hind Drive, Luinakoa Street, Kirkwood Place, Kupaua Place. Reconstruction, cold milling and resurfacing of asphalt roadway; construction of concrete bus pads; reconstruction of curbs and gutters; adjustment of utilities to grade; installation of pavement markings and vehicle loop detectors. Night paving of South King Street, from McCully Street to Old Waialae Road, begins October 16, 2006, Sunday to Friday, 8:00 p.m. to 5:00 a.m. (Estimated completion date, May 2007) KAHALA Curb Ramps at (Estimated completion date, October 2006) KAILUA Curb Ramps at (Estimated completion date, October 2006) Kalaheo Avenue Reconstructed Sewer, from (Estimated completion date, October 2006) Reconstruction of Concrete Sidewalks, Kailua Area – Kuulei Road, Uluniu Street, Kainehe Street, Kailua Road, Hahani Street, Hoolai Street, Aulike Street: Removal and reconstruction of damaged concrete sidewalk, curb and gutter areas, trimming of trees and cutting and removal of tree roots where the roots have damaged the areas, installing root barriers were required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work. (Estimated completion date, October 2006) Reconstruction of Concrete Sidewalks, Keolu Drive: The work involves the reconstruction of existing sidewalks, curbs and gutters and trimming of trees. (Estimated completion date, January 2007) KAIMUKI Curb Ramps at (Estimated completion date, October 2006) Pooleka Street Drainage Improvements – Pooleka Street to Waiomao Stream: Construct new drainage system. Upgrade the existing water system and restore existing driveway. (Estimated completion date, February 2007) KAKAAKO Curb Ramps at (Estimated completion date, October 2006) KANEOHE Reconstruction of Concrete Sidewalks, Kaneohe Area: Alaloa Street, Haiku Road, Kahuhipa Street, Kamehameha Highway, Kawa Street, Mehana Street: Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the area; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades. (Estimated completion date, October 2006) Curb Ramps at Hui Aeko Street and Hui Aeko Place, Hui Iwa Street between Kahekili Street and Hui Iwa Place, Hui Akikiki Place and Hui Iwa Street, Alaloa Street and Haiku Road, Kahuhipa Street and Alaloa Street, Kam Hwy., Lilipuna Street and Kahuhipa Street, Kam Hwy., Keaahala Street and William Henry Road, Kam Hwy., Paleka Road and Waikalua Road: Construct new curb ramps, sidewalks and A.C. transition. Install pavement striping, markings and markers and upgrade traffic signal system. (Estimated completion date, October 2006) KAPAHULU Curb Ramps at Date Street & Hausten Street: Construct new curb ramps, sidewalks and A.C. transition. Install pavement striping, markings and markers. (Estimated completion date, October 2006) MAKIKI Curb Ramps at Anianiku Street and Auwaiolimu Street, Lewalani Drive, Mott-Smith Drive & Piikoi Street, Wilder Avenue and Kewalo Street, Wilder Avenue and Keeaumoku Street, Wilder Avenue and Makiki Street, Punahou Street and Wilder Avenue, Punahou Street and Clark Street, Punahou Street, Manoa Road and Nehoa Street, Wilder Street and Alexander Street, Wilder Street, Farrington Street and Metcalf Street: Construct new curb ramps, sidewalks and A.C. transition. Install pavement striping, markings and markers and upgrade traffic signal system. (Estimated completion date, October 2006) MILILANI Rehabilitation of Streets - (Estimated completion date, January 2007) Rehabilitation of Streets – Meheula Parkway (Ainamakua Drive to Kaapehe Street), Ainamakua Drive (Makaikai Street to Ainamakua Drive) (2nd Int.), Makaikai Street (Ainamakua Drive to Ukuwai Street), Ukuwai Street (Makaikani Street to Ainamakua Drive), Kipapa Drive (Ikaloa Street (Honolulu end) to Kipapa Drive (near Kauamea Place),Kipapa Drive (Kaalolo Place to Lelewalo Street): Roadway reconstruction, cold planning and resurfacing; construction of asphalt concrete and concrete bus pad; reconstruction of existing concrete curbs and/or gutters, tree trimming and rootpruning; adjustment of utility manholes frames and covers; pavement markings and vehicle dector loops. (Estimated completion date, December 2006) SALT LAKE Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street: Final inspection punch list and landscape maintenance. (Estimated completion date, October 2006) WAIALUA Waialua Beach Road Sidewalk Improvements, Phase II – Waialua Beach Road (between Goodale Avenue and Haleiwa Road): Construct new sidewalks, curb ramps, bus stop and driveways. Install new chain link fence, traffic signs and landscaping. (Estimated completion date, October 2006) WAIANAE Hakimo Road Drainage Improvements, Hakimo Road and Ulehawa Street: Construct and install new storm drain inlet structures, RC pipe, manholes, outlet structure, riprap and chain link fence. Cold plan and repave existing A.C. pavement. (Estimated completion date, June 2007) PARADES, WALKS, RACES & OTHER STREET CLOSURES
Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879, Department of Transportation Services, TST Division 527-6009. |
|||||||
| Thursday, October 12, 2006 |