ROAD WORK WEEKLY REPORT

 

Scheduled road work for the week beginning October 8, 2006, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch) is listed below.  Road work is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

AIEA

Miscellaneous Guardrail Improvements, FY 2005 - 99-274 Aiea Heights Drive, 66-826 Haleiwa Road, 41-771 Kumuhau Street:  Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry, and other incidental related work.

            (Estimated completion date, April 2007)

 

ALEWA

Curb Ramps at Gulick Avenue/North School Street, Hala Drive/Makuahine Street, Hauiki Street/North School Street, Kino Street/North School Street, Linapuni Street/North School Street, Makuahine Street/North School Street:  Construct new curb ramps, sidewalks and A.C. transition.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, October 2006)

 

EWA

Fort Weaver Road Manhole and Pipe Rehabilitation:  Rehabilitate the existing sewer line with CIPP along Fort Weaver Road from Renton Road to Geiger Road.

            (Estimated completion date, October 2006)

 

HALEIWA

Bridge Rehabilitation at Anahulu Stream:  Remove deteriorated concrete and reinforcement, reconstruct and repair areas, modify existing railings and paint structure.

            (Estimated completion date, November 2006)

 

HAWAII KAI

Curb Ramps at West Hind Drive & Nenue Street, Ulua Street & Mamaki Street, Ulua Street & Mahimahi Street, Awini Street & Kawaihine Street, Pepeekeo Street & Pepeekeo Place, Ainapo Street & Pepeekeo Place, Pepeekeo Street & Driveway, Hahaione Street & Hawaii Kai Drive, Ehu Wai Place, Hawaii Kai Drive & Kaluanui Road, Hawaii Kai Drive & Wailua Street:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers.

            (Estimated completion date, October 2006)

 

HONOLULU

Curb Ramps at Alakea Street/Merchant Street, Alakea Street/Queen Street, Bethel Street/Merchant Street, Bishop Street/Merchant Street, Halekauwila Street/Mililani Street, Maunakea Street/North Kukui Street, Merchant Street/Richards Street, Mililani Street/Queen Street, North Kukui Street/Nuuanu Street, North Kukui/River Street, Pauahi Street/Nuuanu Avenue, Queen Street/Richards Street, Queen Emma Street/Vineyard Street:  Construct new curb ramps, sidewalks, AC transitions.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, October 2006)

 

Rehabilitation of Streets, Unit 5A, Beretania Street from N. King St. to Alapai St.  Tone for fiber optic cable, excavate for conduit and pull boxes, install conduit & concrete jacket, install pull boxes at Alapai Street, Lauhala Street.

(Estimated completion date, September 2007)

 

Curb Ramps at Bishop Street between South Hotel Street and South King Street, Kekaulike Street/North Hotel Street, North Hotel Street/River Street, South King Street/Ward Avenue, Cooke Street/South King Street, Auahi Street/Kamakee Street, Middle Street/Rose Street, Kahauiki Street/Middle Street, Kamehameha IV Road/School Street, Hihio Place/Kamehameha IV Road, Kamehameha IV Road/Kilolani Place, Kamehameha IV Road/Kilohi Street, Kamehameha IV Road/Aoao Street, Kamehameha IV Road/Kalena Drive, Kamehameha IV Road (mid-block), Horner Lane/Kaua Street, Kamehameha IV Road/Kino Street, Campbell Avenue/Herbert Street, Campbell Avenue/Castle Street, Campbell Avenue/Brokaw Street, Campbell Avenue/Catherine Street, Campbell Avenue/Kaunaoa Street, Kanaina Avenue/Kaunaoa Street, Campbell Avenue/Esther Street:  Construct new curb ramps, sidewalks and AC transition.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, December 2006)

 

Fort St. Mall & Hotel Street Sewer Replacement/Rehabilitation:  Sewer line replacement and CIPP work along Hotel Street between Bethel Street and Bishop Street.

            (Estimated completion date, December 2006

 

Rehabilitation of Harding Avenue from 1st Avenue to Luawai Street, 6th Avenue from Harding Avenue to Palolo Avenue, Leahi Avenue from Kapahulu Avenue to Noela Street, 5th Avenue from Harding Avenue to Dead End:  Completing installation of traffic sensors and catch basin repair.

            (Estimated completion date, October 2006)

 

King Street Improvements, Phase 3 - North King Street between Liliha Street and Desha Lane and Austin Lane and Morris Lane:  Construction of concrete driveways, sidewalks, curb ramps, planting of trees; construction of street lighting system.  Pending revised scope of work.  Trees to be deleted.

            (Estimated completion date, November 2006)

 

Rehabilitation of Various Streets, Unit 37 –South King Street between McCully Street and Old Waialae Road, East/West Hind Drive, Luinakoa Street, Kirkwood Place, Kupaua Place.  Reconstruction, cold milling and resurfacing of asphalt roadway; construction of concrete bus pads; reconstruction of curbs and gutters; adjustment of utilities to grade; installation of pavement markings and vehicle loop detectors.

            (Estimated completion date, May 2007)

 

KAHALA

Curb Ramps at Hunakai Street between Pueo Street and Waialae Avenue:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers.

            (Estimated completion date, October 2006)

 

KAILUA

Curb Ramps at Kaneohe Bay Drive and Molo Street, Kailua Road and Oneawa Street:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers.

            (Estimated completion date, October 2006)

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Kuulei Road: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6:00 p.m.

            (Estimated completion date, October 2006)

 

Reconstruction of Concrete Sidewalks, Kailua Area – Kuulei Road, Uluniu Street, Kainehe Street, Kailua Road, Hahani Street, Hoolai Street, Aulike Street: Removal and reconstruction of damaged concrete sidewalk, curb and gutter areas, trimming of trees and cutting and removal of tree roots where the roots have damaged the areas, installing root barriers were required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

            (Estimated completion date, October 2006)

 

Reconstruction of Concrete Sidewalks, Keolu Drive: The work involves the reconstruction of existing sidewalks, curbs and gutters and trimming of trees.

            (Estimated completion date, January 2007)

 

KAIMUKI

Curb Ramps at 16th Avenue and Waialae Avenue:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers and upgrade traffic signal system.

            (Estimated completion date, October 2006)

 

Pooleka Street Drainage Improvements – Pooleka Street to Waiomao Stream: Construct new drainage system.  Upgrade the existing water system and restore existing driveway.

            (Estimated completion date, February 2007)

 

KAKAAKO

Curb Ramps at South Street and Kawaiahao Street, Ward Street and HECO driveway:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers.

            (Estimated completion date, October 2006)

 

KALIHI

Curb Ramps at Kalihi Street/Lehua Street, Kalihi Street/Kuikele Street:  Construct new curb ramps, sidewalks and A.C. transitions.  Install pedestrian push buttons and striping.

            (Estimated completion date, October 2006)

 

KANEOHE

Reconstruction of Concrete Sidewalks, Kaneohe Area: Alaloa Street, Haiku Road, Kahuhipa Street, Kamehameha Highway, Kawa Street, Mehana Street:  Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the area; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated completion date, October 2006)

 

Curb Ramps at Hui Aeko Street and Hui Aeko Place, Hui Iwa Street between Kahekili Street and Hui Iwa Place, Hui Akikiki Place and Hui Iwa Street, Alaloa Street and Haiku Road, Kahuhipa Street and Alaloa Street, Kam Hwy., Lilipuna Street and Kahuhipa Street, Kam Hwy., Keaahala Street and William Henry Road, Kam Hwy., Paleka Road and Waikalua Road:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers and upgrade traffic signal system.

            (Estimated completion date, October 2006)

 

KAPAHULU

Curb Ramps at Date Street & Hausten Street:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers.

            (Estimated completion date, October 2006)

 

MAKIKI

Curb Ramps at Anianiku Street and Auwaiolimu Street, Lewalani Drive, Mott-Smith Drive & Piikoi Street, Wilder Avenue and Kewalo Street, Wilder Avenue and Keeaumoku Street, Wilder Avenue and Makiki Street, Punahou Street and Wilder Avenue, Punahou Street and Clark Street, Punahou Street, Manoa Road and Nehoa Street, Wilder Street and Alexander Street, Wilder Street, Farrington Street and Metcalf Street:  Construct new curb ramps, sidewalks and A.C. transition.  Install pavement striping, markings and markers and upgrade traffic signal system.

            (Estimated completion date, October 2006)

 

MILILANI

Rehabilitation of Streets - Lanikuhana Avenue, Meheula Parkway (East Int.) to Ahiku Street.  Roadway reconstruction, cold planning and resurfacing; construction of asphalt concrete and concrete bus pad; reconstruction of existing concrete curbs and/or gutters, tree trimming and rootpruning; adjustment of utility manholes frames and covers; pavement markings and vehicle detector loops.            (Estimated completion date, January 2007)

 

Rehabilitation of Streets – Meheula Parkway (Ainamakua Drive to Kaapehe Street), Ainamakua Drive (Makaikai Street to Ainamakua Drive) (2nd Int.), Makaikai Street (Ainamakua Drive to Ukuwai Street), Ukuwai Street (Makaikani Street to Ainamakua Drive), Kipapa Drive (Ikaloa Street (Honolulu end) to Kipapa Drive (near Kauamea Place),Kipapa Drive (Kaalolo Place to Lelewalo Street):  Roadway reconstruction, cold planning and resurfacing; construction of asphalt concrete and concrete bus pad; reconstruction of existing concrete curbs and/or gutters, tree trimming and rootpruning; adjustment of utility manholes frames and covers; pavement markings and vehicle dector loops.

            (Estimated completion date, December 2006)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:  Final inspection punch list and landscape maintenance.

            (Estimated completion date, October 2006)

 

WAIALUA

Waialua Beach Road Sidewalk Improvements, Phase II – Waialua Beach Road (between Goodale Avenue and Haleiwa Road):  Construct new sidewalks, curb ramps, bus stop and driveways.  Install new chain link fence, traffic signs and landscaping.

            (Estimated completion date, October 2006)

 

 

PARADES, WALKS, RACES & OTHER STREET CLOSURES

 

October 8, 2006 Sunday
7:00AM Starts
12:00N Ends

KO OLINA TRIATHLON sponsored by Ko Olina Resort/USA Triathlon. The event is expected to have 400 triathletes.  Swim and Run will be on Ko Olina property. Bike Course will start at Transition area, to Ko'I'o St., to Farrington Hwy., to Kalaeloa Dr., to Malakole St., to Kaiholo St., to Awakumoku St., to Nukuawa St., to Kaiholo St., to Malakole St., to Kalaeloa Dr., to Farrington Hwy., to Ko Olina ramp, to Ko Olina transition area. Selected areas to be coned for bikes. Contact: JJ Johnson 782-2161 Email: goprojj@hawaii.rr.com  For more info visit their website: http://www.koolinatriathlon.com/

 

October 8, 2006 Sunday
7:00AM Starts
9:00AM Ends

TANTALUS 10 MILE RUN sponsored by RRCA/Mid Pacific Roadrunners Club. The event is expected to have 100 runners.  It will start at Makiki Hts Dr./Round Top Dr., to Round Top Dr., to Tantalus Dr., to Makiki Hts Dr., back to start/finish area at  Makiki Hts Dr./Round Top Dr., Contact: John Simonds 373-3609  For more info visit their website: www.mprrc.com

 

October 13, 2006 Friday
1:00PM Starts
3:00PM Ends

MILILANI HIGH SCHOOL HOMECOMING PARADE sponsored by Mililani High School.  The event is expected to have 800+ marchers, 12 vehicles, 4  floats & 1 band.  It will start at Town Center of Mililani, to Lanikuhana Ave., to Meheula Pkwy., to Hookelewaa St., to Kipapa Dr., to Kuahelani Ave., to Moenamanu St., to Kipapa Dr., end at MHS Stadium.  Contact:  Gail Nishimura at 627-7373, Fax:  627-7375, E-mail: gail_nishimura@notes.k12.hi.us

 

October 13, 2006 Friday
4:00PM Starts
6:00PM Ends

WAIALUA HIGH SCHOOL HOMECOMING PARADE sponsored by Waialua High School. The event is expected to have 400 marchers, 10 vehicles, 6 floats, 1 band.  Vehicles only, will start at WHIS Parking Lot to Farrington Hwy., to Kaukonahua Rd., through Haleiwa town, to Wailua District Park, Vehicles joins marchers,  proceed together, to Goodale Ave., to Farrington Hwy., to end at WHIS  parking lot. Contact: Gwen Lavarias 637-8200 Ext 263 Fax: 637-8209

 

October 14, 2006 Saturday
11:00AM Starts
4:00PM Ends

FASHION ARTS CUISINE ENTERTAINMENT OF NUUANU STREET FESTIVAL sponsored by Honolulu Culture & Arts District Assn.  The event is expected to have 2,000 participants.  Traffic will be diverted at 9:00 am for setup. The event will close Nuuanu Ave. from Chaplain Ln. to King St., Pauahi St. from Smith and Bethel Sts. for "Local Traffic Only", and Hotel St. from Bethel to Smith Sts.  City buses along Nuuanu Ave. and Hotel St. will be rerouted from 9:00 am.  Contact TheBus/OTS Info at 848-5555.  Contact:  Ed Korybski 538-2220 Fax: 842-1962

 

 

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879, Department of Transportation Services, TST Division 527-6009.