Scheduled road work for the week beginning April 29, 2007, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch) is listed below.  Road work is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

AIEA

Miscellaneous Guardrail Improvements at Aiea Heights Drive:  Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry, and other incidental related work.

            (Estimated completion date, April 2007)

 

Curb Ramps at Kaahele Street & Komo Mai Drive:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

Kaonohi Street / Moanalua Road Intersection Improvements:  Work includes additional left turn lanes from Kaonohi Street to Moanalua Road, both directions; adding dedicated right turn lanes on Moanalua Road to Kaonohi Street, both directions; retrofitting countdown pedestrian signal heads; adding emergency vehicle preemption (EVP) detectors; installing new mast arms with standards and traffic signal heads for the traffic signal system; constructing a raised concrete median with chain link fence on Kaonohi Street Makai; pavement markings.  Contract work completed.  Extra work remains to be done.

            (Estimated completion date April 2007)

 

DIAMOND HEAD

Curb Ramps at Diamond Head Road and Coconut Avenue, Diamond Head Road and Beach Road, Diamond Head Road and Kahala Avenue:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, May 2007)

 

Curb Ramps at Leahi Avenue and Monsarrat Avenue, Pualei Circle and Pualei Circle, Makapuu Avenue and Maunalei Avenue, Diamond Head Road and 18th Avenue, Diamond Head Road and 22nd Avenue, Diamond Head Road and Paikau Street, Paikau Street and Kaimanahila Street, Paikau Street and Kahala Aveneue:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade the traffic signal systems.

            (Estimated completion date, July 2007)

 

EWA

Curb Ramps at Kehue Street & North Road, Kehue Street & Kehue Place, Kehue Street & Kei Place, Kehue Street & Keele Place, Kehue Street & Kekaihili Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

Fort Weaver Road Manhole and Pipe Rehabilitation:  Rehabilitate the existing sewer line with CIPP along Fort Weaver Road from Renton Road to Geiger Road.

            (Estimated completion date, April 2007)

 

HALEIWA

Miscellaneous Guardrail Improvements Haleiwa Road: Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry and other incidental related work.

            (Estimated completion date, April 2007)

 

HAWAII KAI

Reconstruction of Concrete Sidewalks, Kawaihae Street Area, Hawaii Kai  Work includes removal and reconstruction of damaged concrete sidewalk, curb and gutter areas; trimming of trees and cutting, removal of tree roots where the roots have damaged the areas; installing root barriers where required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

            (Estimated completion date, January 2008)

 

HONOLULU

Rehabilitation of Beretania Street from N. King St. to Alapai St.  Traffic signal work at Richards and Queen Emma Streets.  Curb ramp construction at Alapai Street and Lauhala Street.  Thru-gutter and catch basin construction at Lauhala Street.

            (Estimated completion date, September 2007)

 

Curb ramps at Alexander Street/S. Beretania Street, Isenberg Street/S. Beretania Street, Kaheka Street/Kanunu Stree, Kaheka Street/Makaloa Street, Kalauokalani Way/Makaloa Street, Punahou Street/S. King Street, S. Beretania Street/Keeaumoku Street/Piikoi Street, Kinau Street/Victoria Street, S. Beretania Street/Pensacola Street/Victoria Street, S. Beretania Street/Victoria Street, S. Beretania Street/Ward Avenue, Coyne Street/University Avenue, Dole Street/East-West Road, Dole Street/University Avenue, Kahuna Lane/South King Street, University Avenue/Varsity Place, and Pawaina Street/Paumaka Place:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers, upgrade traffic signal system.

            (Estimated completion date, July 2007)

 

Curb Ramps at Bishop Street between South Hotel Street and South King Street, Kekaulike Street/North Hotel Street, North Hotel Street/River Street, South King Street/Ward Avenue, Cooke Street/South King Street, Auahi Street/Kamakee Street, Middle Street/Rose Street, Kahauiki Street/Middle Street, Kamehameha IV Road/School Street, Hihio Place/Kamehameha IV Road, Kamehameha IV Road/Kilolani Place, Kamehameha IV Road/Kilohi Street, Kamehameha IV Road/Aoao Street, Kamehameha IV Road/Kalena Drive, Kamehameha IV Road (mid-block), Horner Lane/Kaua Street, Kamehameha IV Road/Kino Street, Campbell Avenue/Herbert Street, Campbell Avenue/Castle Street, Campbell Avenue/Brokaw Street, Campbell Avenue/Catherine Street, Campbell Avenue/Kaunaoa Street, Kanaina Avenue/Kaunaoa Street, Campbell Avenue/Esther Street:  Construct new curb ramps, sidewalks and AC transition.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, April 2007)

 

Resurfacing of a Portion of Dillingham Boulevard, Waiakamilo Road to Middle Street.  Reconstruction, cold milling and resurfacing of asphalt roadway; reconstruction of asphalt bus pads has been completed.  Adjusting utilities to grade; installation of pavement markings and vehicle loop detectors.

            (Estimated completion date, April 2007)

 

Curb Ramps at Emerson Street and Prospect Street, Iolani Avenue and Queen Emma Street (School Street and Lusitana Street), Hotel Street and Hale Makai Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers, upgrade traffic signal system.

            (Estimated completion date, May 2007)

 

Curb Ramps at Kaaahi Street & Kaamahu Place, Kaaahi Street & Kaaahi Place, Ahiahi Place & Lanakila Avenue, Bates Street & Bachelot Street, Nuuanu Avenue & Wylie Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

Fort St. Mall & Hotel Street Sewer Replacement/Rehabilitation:  Sewer line replacement and CIPP work along Hotel Street between Bethel Street and Bishop Street.

            (Estimated completion date, April 2007)

 

Emergency Reconstruction of Wall in the Vicinity of 2839 Pacific Heights Road.  Reconstruct a retaining wall in the vicinity of 2839 Pacific Heights Road.  Work includes removing the existing damaged CRM wall and landslide spoils, temporarily relocate plants in the work area, install temporary excavation support and BMPs, install drill shaft piles and construct a reinforced concrete retaining wall.

            (Estimated completion date, June 2007)

 

Round Top Drive Emergency Roadway Repairs:  Install drilled caissons and tie-back systems, reconstruct roadway pavement and curbs, relocate existing water line, and install guardrails.

            (Estimated completion date, May 2007)

 

Rehabilitation of South King Street between McCully Street and Old Waialae Road, East/West Hind Drive, Luinakoa Street, Kirkwood Place, Kupaua Place.  Reconstruction, cold milling and resurfacing of asphalt roadway; construction of concrete bus pads; reconstruction of curbs and gutters; adjustment of utilities to grade; installation of pavement markings and vehicle loop detectors.

            (Estimated completion date, May 2007)

 

KAILUA

Curb Ramps at Akiohala Street and Keolu Drive, Pahumele Place and Keolu Drive, Hui Street and Keolu Drive, Keolu Drive and Akaakaawa Street, Kahili Street (Makai) and Akumu Street, Kahili Street (Mauka) and Akumu Street, Lopono Loop (Mauka) and Akumu Street, Hoolea Place and Akumu Street, Lopono Loop (Makai) and Akumu Street, Holoholo Street and Akumu Street, Halula Place and Akumu Street, Alahaki Street and Akumu Street, Akalei Place and Akumu Street, Akiu Place and Akumu Street, Akumu Place and Akumu Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade traffic signal system (Keolu Drive and Akaakaawa Street only).

            (Estimated completion date, May 2007)

 

Rehabilitation of Kainehe Street (Kihapai Street to Kailua Road) and Hamakua Drive (Kailua Road to Keolu Drive):  Roadway reconstruction, cold planning and resurfacing; construction of asphalt concrete and concrete bus pad; construction of curb ramps and associated traffic signal upgrades; reconstruction of existing concrete curbs and/or gutters, tree trimming and root pruning; adjustment of utility manholes frames and covers; pavement markings and vehicle detector loops.

            (Estimated completion date, July 2007)

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Kuulei Road: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6:00 p.m.

            (Estimated completion date, April 2007)

 

Curb Ramps at Keolu Drive and Kupau Street, Keolu Drive and Nanialii Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, May 2007)

 

Reconstruction of Concrete Sidewalks - Kuulei Road, Uluniu Street, Kainehe Street, Kailua Road, Hahani Street, Hoolai Street, Aulike Street: Removal and reconstruction of damaged concrete sidewalk, curb and gutter areas, trimming of trees and cutting and removal of tree roots where the roots have damaged the areas, installing root barriers were required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

            (Estimated completion date, May 2007)

 

KAIMUKI

Pooleka Street Drainage Improvements Pooleka Street to Waiomao Stream: Construct new drainage system.  Final cleanup and grass maintenance.

            (Estimated completion date, May 2007)

 

Curb Ramps at Various Locations, FY 2002(6) Malia Street and Alakoa Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

KALIHI

Curb Ramps at Various Locations, FY 2005(5) Dillingham Blvd. & Mokauea, Dillingham Blvd. & Puuhale Street, Dillingham Blvd. & Laumaka Street, Dillingham Blvd. & GE Supply:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade traffic signal systems.

            (Estimated completion date, July 2007)

 

Curb Ramps at Lehua Street and Nihi Street, Amelia Street and North School Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, May 2007)

 

Curb Ramps at Waiakamilo Road and Alokele Street, Waiakamilo Road and Moonui Road, Dillingham Boulevard and McNeill Street, McNeill Street and Colburn Street.  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers. Relocate regulatory signs.

            (Estimated completion date, April 2007)

 

KANEOHE

Curb Ramps at Kamehameha Highway and Kolokio Street, Kamehameha Highway and Kapalai Road, Kamehameha Highway and Hoene Place:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, May 2007)

 

Reconstruction of Concrete Sidewalks on Alaloa Street, Haiku Road, Kahuhipa Street, Kamehameha Highway, Kawa Street, Mehana Street:  Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the area; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated completion date, April 2007)

 

Kawa Ditch Improvements:  Naumanu Place & Nakuluai Street, Kaneohe:  Removal existing trapezoidal concrete drain channel lining and reconstruction of new concrete rectangular channel.

            (Estimated completion date, August 2007)

 

MAKIKI

Curb Ramps at Anianiku Street and Auwaiolimu Street, Lewalani Drive, Mott-Smith Drive & Piikoi Street, Wilder Avenue and Kewalo Street, Wilder Avenue and Keeaumoku Street, Wilder Avenue and Makiki Street, Punahou Street and Wilder Avenue, Punahou Street and Clark Street, Punahou Street, Manoa Road and Nehoa Street, Wilder Street and Alexander Street, Wilder Street, Farrington Street and

Metcalf Street:  Upgrade traffic signal system.

            (Estimated completion date, April 2007)

 

MILILANI

Curb Ramps at Wailawa Street & Wailawa Place, Waimakua Drive & Wailawa Street, Waimakua Drive & Wainihi Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

PALOLO

Curb Ramps at Palolo Avenue and Palolo Recreation Center:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

Kuahea Street Interim Drainage Repair:  Repair the existing disjointed or damaged 18 reinforced concrete pipes using cured in place lining.

            (Estimated completion date, May 2007)

 

PEARL CITY

Reconstruction of Concrete Sidewalks, Moanalua Road and Kaahumanu Street:  Reconstruct sidewalks, driveways, curbs, gutters and AC pavement.  Adjust utility boxes to new sidewalk grade.  Tree trimming, root pruning, installing root barriers and removal of trees where required.  (Estimated completion date, November 2007)

 

Curb Ramps at Noelani St. & Nola St.  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Relocate regulatory signs.

            (Estimated completion date, May 2007)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:  Landscape maintenance.

            (Estimated completion date, July 2007)

 

Curb Ramps at Ala Puumalu St. and Ala Oliko Pl., Ala Puumalu St. and Ala Punene Pl., Ala Puumalu St. and Ala Puumalu Pl.  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Relocate regulatory signs.

            (Estimated completion date, April 2007)

 

WAIALAE

Curb Ramps at Waialae Avenue and St. Louis Drive, Waialae Avenue and 3rd Avenue, Waialae Avenue and 6th Avenue, Waialae Avenue and 8th Avenue, Harding Avenue and 11th Avenue:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade the traffic signal systems.

            (Estimated completion date, July 2007)

 

WAIANAE

Hakimo Road Drainage Improvements, Hakimo Road and Ulehawa Street:  Construct and install new storm drain inlet structures, RC pipe, manholes, outlet structure, riprap and chain link fence.  Cold plan and repave existing A.C. pavement.

            (Estimated completion date, June 2007)

 

WAIKIKI

Curb Ramps at Horbon Lane and Holomoana Street, Ena Road and Kalakaua Avenue, Koa Avenue and Liliuokalani Avenue, Kapahulu Avenue and Makee Road, Kapahulu Avenue and Campbell Avenue, Kapahulu Avenue and Kanaina Avenue:   Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade the traffic signal system.

            (Estimated completion date, May 2007)

 

WAIMANALO

Miscellaneous guardrail improvements at 41-771 Kumuhau Street:  Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry, and other incidental related work.

            (Estimated completion date, April 2007)

 

WAIPAHU

Curb Ramps at Various Locations, FY 2005(5) Mokuola Street & Kauolu Place, Paiwa Street & Kahuanui Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

Waikele Road Improvements:  Work includes widening of Waikele Road and addition of curb and sidewalk fronting Waipahu Intermediate School, from Farrington Highway to Waipahu Flood Control Channel; adjustment of manholes, and boxes on the roadway being widened.

            (Estimated completion date, August 2007)

 

Waipahu Street Drainage Improvements:  Construct a new drainage system with 18, 24, 30, and 36 RCP drain lines; drain inlets with concrete aprons; drain manholes; a special catch basin; concrete headwall and concrete swales.  Other work includes the lowering of the existing water line, installing concrete jackets over the existing sewer lines, protecting the existing utility facilities, and necessary restoration work.

            (Estimated completion date, January 2008)

 

PARADES, WALKS, RACES AND OTHER STREET CLOSURES

 

April 29, 2007 Sunday
7:30AM Starts
2:30PM Ends

HALEIWA METRIC CENTURY RIDE sponsored by Hawaii Bicycling League. The event is expected to have 900 riders. It will start at Kaiaka Beach Park 25K: Kaiaka Beach Park, to Haleiwa Rd., to Paala Rd., to  Kamehameha Hwy., Ehukai Beach Park turnaround, to Kam Hwy., to Joseph Leong Hwy., to Kam Hwy., to Weed Circle, to Kam Hwy., to end at North Shore Marketplace  50K: continue on Kamehameha Hwy., Kahuku High School turn around, to Kam Hwy., to Joseph Leong Hwy., to Kam Hwy., to Weed Circle, to Kam Hwy., to end at North Shore Marketplace  100K: continue on Kamehameha Hwy., to Swanzy Beach Park turn around, to Kam Hwy., to Joseph Leong Hwy., to Kam Hwy., to Weed Circle, to Kam Hwy., to end at North Shore Marketplace.  No lanes will be closed, except for start of ride. Contact: HBL Chris Clark 735-5756, Fax:  735-6679, For more info, check out their website:  http://www.hbl.org/

 

April 29, 2007 Sunday
8:00AM Starts
2:00PM Ends

KALIHI HAND TOOL COMPETITION sponsored by Slim's Power Tools.  The event is expected to have 1,500+ participants.  Traffic will be diverted starting 3:00 pm 4/28/07 to 8:00 am 4/29/07 for setup. The event will close Republican Street, all traffic lanes/sidewalk areas, from Libby St. to Kalihi St. Contact: Rand Okemura 841-0902 or 927-9995, Fax: 845-4180 Email: rjokemura@slimspowertools.com

 

April 29, 2007 Sunday
11:00AM Starts
4:00PM Ends

I LOVE KAILUA TOWN PARTY sponsored by the Lani-Kailua Outdoor Circle.  The event is expected to have 1,500+ participants.  Traffic will be diverted starting 9 am for setup. The event will close Kailua Road, all traffic lanes/sidewalk areas, from Hahani St. to Kuiliei Rd. Contact: Paula Ress, Amy Hammond or Lyn Turner of Special Events Hawaii Ph. 234-0404  Fax: 234-0406  Email: specialeventshawaii@juno.com

 

May 5, 2007 Saturday
9:00AM Starts
11:00PM Ends

NUUANU AVE. CINCO DE MAYO STREET FESTIVAL sponsored by Murphy's Bar & Grill. The event is expected to have 3,000+ participants.  Curb lanes will be closed from 9 am for setup. The event will close 1) NUUANU AVE., all traffic lanes/sidewalk areas, from King St. to Nimitz Hwy. 2) MERCHANT ST., all traffic lanes/sidewalk areas, from Nuuanu Ave. to Bethel St. 3) MARIN LN., all traffic lanes/sidewalk areas.  Contact Don Murphy 531-0422, 754-1502 Fax: 533-4943

 

 

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879, Department of Transportation Services, TST Division 768-8387..

 