You are here:  Main / Customer Services / Public Communications Division / 2007 / Road Work Weekly Report

ROAD WORK WEEKLY REPORT

 

Scheduled road work for the week beginning August 12, 2007, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch) is listed below.  Road work is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

AIEA

Kaonohi Street / Moanalua Road Intersection Improvements:  Work includes additional left turn lanes from Kaonohi Street to Moanalua Road, both directions; adding dedicated right turn lanes on Moanalua Road to Kaonohi Street, both directions; retrofitting countdown pedestrian signal heads; adding emergency vehicle preemption (EVP) detectors; installing new mast arms with standards and traffic signal heads for the traffic signal system; constructing a raised concrete median with chain link fence on Kaonohi Street Makai; pavement markings.  Contract work completed.  Extra work remains to be done.

            (Estimated completion date September 2007)

 

Newtown Neighborhood Kaahele Street Improvements, Vicinity of Komo Mai Drive to Moanalua Road.  Work includes adding left turn pockets, pavement markings, and signs.

            (Estimated completion date, September 2007)

 

EWA

Fort Weaver Road Manhole and Pipe Rehabilitation:  Contractor to repair one section of sewer pipe on Fort Weaver Road between Renton Road and Kolowaka Street.  The work will be done on the shoulder of the West side of Fort Weaver Road and will not interfere with traffic.

            (Estimated completion date, August 2007)

 

HAWAII KAI

Reconstruction of Concrete Sidewalks, Kawaihae Street Area, Hawaii Kai  Work includes removal and reconstruction of damaged concrete sidewalk, curb and gutter areas; trimming of trees and cutting, removal of tree roots where the roots have damaged the areas; installing root barriers where required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

            (Estimated completion date, February 2008)

 

HONOLULU

Curb ramps at Alexander Street/S. Beretania Street, Isenberg Street/S. Beretania Street, Kaheka Street/Kanunu Stree, Kaheka Street/Makaloa Street, Kalauokalani Way/Makaloa Street, Punahou Street/S. King Street, S. Beretania Street/Keeaumoku Street/Piikoi Street, Kinau Street/Victoria Street, S. Beretania Street/Pensacola Street/Victoria Street, S. Beretania Street/Victoria Street, S. Beretania Street/Ward Avenue, Coyne Street/University Avenue, Dole Street/East-West Road, Dole Street/University Avenue, Kahuna Lane/South King Street, University Avenue/Varsity Place, and Pawaina Street/Paumaka Place:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers, upgrade traffic signal system.

            (Estimated completion date, August 2007)

 

Rehabilitation of Beretania Street from N. King St. to Alapai St.  Traffic signal work at Richards and Queen Emma Streets.  Curb ramp construction at Alapai Street and Lauhala Street.  Thru-gutter and catch basin construction at Lauhala Street.

            (Estimated completion date, September 2007)

 

Curb Ramps at Bishop Street between South Hotel Street and South King Street, Kekaulike Street/North Hotel Street, North Hotel Street/River Street, South King Street/Ward Avenue, Cooke Street/South King Street, Auahi Street/Kamakee Street, Middle Street/Rose Street, Kahauiki Street/Middle Street, Kamehameha IV Road/School Street, Hihio Place/Kamehameha IV Road, Kamehameha IV Road/Kilolani Place, Kamehameha IV Road/Kilohi Street, Kamehameha IV Road/Aoao Street, Kamehameha IV Road/Kalena Drive, Kamehameha IV Road (mid-block), Horner Lane/Kaua Street, Kamehameha IV Road/Kino Street, Campbell Avenue/Herbert Street, Campbell Avenue/Castle Street, Campbell Avenue/Brokaw Street, Campbell Avenue/Catherine Street, Campbell Avenue/Kaunaoa Street, Kanaina Avenue/Kaunaoa Street, Campbell Avenue/Esther Street:  Construct new curb ramps, sidewalks and AC transition.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, August 2007)

 

Curb Ramps at Date Street & University Avenue.  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade the traffic signal systems.

            (Estimated completion date, October 2007)

 

Resurfacing of a Portion of Dillingham Boulevard, Waiakamilo Road to Middle Street.  Adjusting utilities to grade; installation of pavement markings and vehicle loop detectors.

            (Estimated completion date, August 2007)

 

Fort St. Mall & Hotel Street Sewer Replacement/Rehabilitation:  Sewer line replacement and CIPP work along Hotel Street between Bethel Street and Bishop Street.

            (Estimated completion date, August 2007)

 

Rehabilitation of Various Streets, Unit 43 Keeaumoku Street between Kapiolani Boulevard to Kinau Street; Rycroft Street from Kaheka Street to Sheridan; Sheridan Street between Kapiolani Boulevard to South King Street; South Street from Ala Moana Boulevard to South King Street; University Avenue between Coyne Street to Hihiwai Street:  Reconstruction of concrete curbs and gutters, and new bus pads.  Reconstruction and resurfacing of asphalt pavements.  Adjusting manhole to finish grade, installation of vehicle loop detectors, and permanent pavement markings.

            (Estimated completion date, March 2008)

 

Rehabilitation of South King Street between McCully Street and Old Waialae Road, East/West Hind Drive, Luinakoa Street, Kirkwood Place, Kupaua Place.  Work complete with the exception of punch list deficiencies.

            (Estimated completion date, August 2007)

 

Sand Island Basin Miscellaneous Sewer Rehabilitation:  Continue replacement of sewer manhole frame and covers and manhole rehabilitation in various locations.  Rehabilitation of the Ward Avenue sewer tunnel, Sand Island Access Road sewerline, Ala Moana Park sewerline, Moanalua sewerline and Nuuanu sewerline are forthcoming.  Ward Avenue (King Street to Kinau Street) One lane in each direction on Sunday, August 12, from 12:00 p.m. to 7:00 p.m. 

            (Estimated completion date, October 2007)

 

KAHALA

Curb Ramps at Keanu Street & Hunakai Street (both makai and mauka intersections).  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, October 2007)

 

KAILUA

Curb Ramps at Akiohala Street and Keolu Drive, Pahumele Place and Keolu Drive, Hui Street and Keolu Drive, Keolu Drive and Akaakaawa Street, Kahili Street (Makai) and Akumu Street, Kahili Street (Mauka) and Akumu Street, Lopono Loop (Mauka) and Akumu Street, Hoolea Place and Akumu Street, Lopono Loop (Makai) and Akumu Street, Holoholo Street and Akumu Street, Halula Place and Akumu Street, Alahaki Street and Akumu Street, Akalei Place and Akumu Street, Akiu Place and Akumu Street, Akumu Place and Akumu Street:  Install street name and traffic signs.  Upgrade traffic signal system (Keolu Drive and Akaakaawa Street only).

            (Estimated completion date, August 2007)

 

Rehabilitation of Kainehe Street (Kihapai Street to Kailua Road) and Hamakua Drive (Kailua Road to Keolu Drive):  Paving complete; completing traffic signal upgrades, adjustment of utility manholes frames and covers to grade, and installation of pavement markings and vehicle detector loops.

            (Estimated completion date, August 2007)

 

Maunawili Bridge 2 Over Kamakalepo Stream, Bridge No. 444:  Construct forms and place rebar for east and west abutments.

            (Estimated completion date, November 2007)

 

KAIMUKI

Curb Ramps at Pahoa Avenue & 13th Avenue, Kaau Street, Kekona Place & Palolo Avenue, 7th Avenue & Kaau Street, 7th Avenue & Keanu Street, 7th Avenue & Waialae Avenue, 9th Avenue & Waialae Avenue, 10th Avenue & Waialae Avenue.  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Relocate street and traffic signs.  Upgrade traffic signal system.

            (Estimated completion date, October 2007)

 

KALIHI

Curb Ramps at Various Locations, FY 2005(5) Dillingham Blvd. & Mokauea, Dillingham Blvd. & Puuhale Street, Dillingham Blvd. & Laumaka Street, Dillingham Blvd. & GE Supply:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade traffic signal systems.

            (Estimated completion date, August 2007)

 

KANEOHE

Kawa Ditch Improvements:  Naumanu Place & Nakuluai Street, Kaneohe:  Removal existing trapezoidal concrete drain channel lining and reconstruction of new concrete rectangular channel.

            (Estimated completion date, November 2007)

 

Miscellaneous Storm Drainage Improvements at Kaneohe Bay Drive (near Hulakai Place):  This project replaces an existing 6x6 CRM box culvert drain with a new 6x6 precast concrete box culvert crossing Kaneohe Bay Drive near Hulakai Place.  Work includes the restoration of the roadway pavement and existing sidewalk.

            (Estimated completion date, December 2007)

 

NIU VALLEY

Curb Ramps at Halemaumau Street & Mahimahi Street, Halemaumau Street & Halemaumau Place, Halemaumau Street & Ulua Street.  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Relocate street and traffic signs.

            (Estimated completion date, October 2007)

 

PALOLO

Kuahea Street Interim Drainage Repair:  Repair the existing disjointed or damaged 18 reinforced concrete pipes using cured in place lining.

            (Estimated completion date, Aug 2007)

 

PEARL CITY

Reconstruction of Concrete Sidewalks, Moanalua Road and Kaahumanu Street:  Reconstruct sidewalks, driveways, curbs, gutters and AC pavement.  Adjust utility boxes to new sidewalk grade.  Tree trimming, root pruning, installing root barriers and removal of trees where required.  (Estimated completion date, November 2007)

 

Localized Rehabilitation of Streets, Phase 2, Various Streets  Work includes cold planing; resurfacing of asphalt concrete pavements; reconstruction of failed asphalt concrete pavement areas; adjustment of utility manhole frame and covers; installation of pavement markings; and locating existing manholes, valve boxes, monuments, etc.

            (Estimated completion date, January 2008)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:  Landscape maintenance.

            (Estimated completion date, August 2007)

 

WAIALAE

Curb Ramps at Waialae Avenue and St. Louis Drive, Waialae Avenue and 3rd Avenue, Waialae Avenue and 6th Avenue, Waialae Avenue and 8th Avenue, Harding Avenue and 11th Avenue:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade the traffic signal systems.

            (Estimated completion date, August 2007)

 

WAIANAE

Hakimo Road Drainage Improvements, Hakimo Road and Ulehawa Street:  Construct and install new storm drain inlet structures, RC pipe, manholes, outlet structure, riprap and chain link fence.  Cold plan and repave existing A.C. pavement.

            (Estimated completion date, August 2007)

 

WAIKIKI

Rehabilitation of Streets, Unit 53, Ala Wai Boulevard from Kapahulu Avenue to Kanekapolei Street:  Reconstruct identified utility manholes, concrete curbs, gutters, and driveways.  Reconstruct & resurface asphalt roadway.  Install new permanent pavement markings and vehicle loop sensors; and adjust manhole and valve box frames and covers to grade.

            (Estimated completion date, September 2007)

 

WAIPAHU

Waikele Road Improvements:  Work includes widening of Waikele Road and addition of curb and sidewalk fronting Waipahu Intermediate School, from Farrington Highway to Waipahu Flood Control Channel; adjustment of manholes, and boxes on the roadway being widened.

            (Estimated completion date, August 2007)

 

WAIPIO

Localized Rehabilitation of Streets, Phase 2, Various Streets  Work includes cold planing; resurfacing of asphalt concrete pavements; reconstruction of failed asphalt concrete pavement areas; adjustment of utility manhole frame and covers; installation of pavement markings; and locating existing manholes, valve boxes, monuments, etc.

            (Estimated completion date, January 2008)

 

PARADES, WALKS, RACES AND OTHER STREET CLOSURES

 

August 12, 2007 Sunday
7:00AM Starts
9:00AM Ends

MAHALO 5K RUN sponsored by Mid-Pacific Road Runners Club. The event is expected to have 400 runners. It will start at Manoa Rec Center, to Manoa Rd., to Pawaina St., to Pakanu St., to E. Manoa Rd., to Oahu Ave., to Lowrey Ave., to Kaaipu Ave.,  and finish at Manoa Rec Center. Contact:  Connie Comiso-Fanelli 255-9775

 

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 768-8839, Wastewater Management Division, Construction Management - 768-8794, Department of Transportation Services, TST Division 768-8390.

Thursday, August 09, 2007