| You are here: Main / Customer Services / Public Communications Division / 2007 / Road Work Weekly Report |
|
Scheduled road work for the week beginning June 3, 2007, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch) is listed below. Road work is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted. AIEA Miscellaneous Guardrail Improvements at Aiea Heights Drive: Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry, and other incidental related work. (Estimated completion date, June 2007) Curb Ramps at Kaahele Street & Komo Mai Drive: Construct new curb ramps, sidewalks and AC transition. Install pavement striping, markings and markers. (Estimated completion date, July 2007) Kaonohi Street / Moanalua Road Intersection Improvements: Work includes additional left turn lanes from Kaonohi Street to Moanalua Road, both directions; adding dedicated right turn lanes on Moanalua Road to Kaonohi Street, both directions; retrofitting countdown pedestrian signal heads; adding emergency vehicle preemption (EVP) detectors; installing new mast arms with standards and traffic signal heads for the traffic signal system; constructing a raised concrete median with chain link fence on Kaonohi Street Makai; pavement markings. Contract work completed. Extra work remains to be done. (Estimated completion date June 2007) Newtown Neighborhood – Kaahele Street Improvements, Vicinity of Komo Mai Drive to Moanalua Road. Work includes adding left turn pockets, pavement markings, and signs. (Estimated completion date, July 2007) DIAMOND HEAD Curb Ramps at Leahi Avenue and Monsarrat Avenue, Pualei Circle and Pualei Circle, Makapuu Avenue and Maunalei Avenue, Diamond Head Road and 18th Avenue, Diamond Head Road and 22nd Avenue, Diamond Head Road and Paikau Street, Paikau Street and Kaimanahila Street, Paikau Street and Kahala Aveneue: Construct new curb ramps, sidewalks and AC transition. Install pavement striping, markings and markers. Upgrade the traffic signal systems. (Estimated completion date, July 2007) EWA Curb Ramps at Kehue Street & North Road, Kehue Street & Kehue Place, Kehue Street & Kei Place, Kehue Street & Keele Place, Kehue Street & Kekaihili Street: Construct new curb ramps, sidewalks and AC transition. Install pavement striping, markings and markers. (Estimated completion date, July 2007) Fort Weaver Road Manhole and Pipe Rehabilitation: Rehabilitate the existing sewer line with CIPP along Fort Weaver Road from Renton Road to Geiger Road. (Estimated completion date, June 2007) HALEIWA Miscellaneous Guardrail Improvements Haleiwa Road: Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry and other incidental related work. (Estimated completion date, June 2007) HAWAII KAI Reconstruction of Concrete Sidewalks, Kawaihae Street Area, Hawaii Kai Work includes removal and reconstruction of damaged concrete sidewalk, curb and gutter areas; trimming of trees and cutting, removal of tree roots where the roots have damaged the areas; installing root barriers where required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work. (Estimated completion date, January 2008) HONOLULU Curb ramps at Alexander Street/S. Beretania Street, Isenberg Street/S. Beretania Street, Kaheka Street/Kanunu Stree, Kaheka Street/Makaloa Street, Kalauokalani Way/Makaloa Street, Punahou Street/S. King Street, S. Beretania Street/Keeaumoku Street/Piikoi Street, Kinau Street/Victoria Street, S. Beretania Street/Pensacola Street/Victoria Street, S. Beretania Street/Victoria Street, S. Beretania Street/Ward Avenue, Coyne Street/University Avenue, Dole Street/East-West Road, Dole Street/University Avenue, Kahuna Lane/South King Street, University Avenue/Varsity Place, and Pawaina Street/Paumaka Place: Construct new curb ramps, sidewalks and AC transition. Install pavement striping, markings and markers, upgrade traffic signal system. (Estimated completion date, July 2007) Rehabilitation of Beretania Street from N. King St. to Alapai St. Traffic signal work at Richards and Queen Emma Streets. Curb ramp construction at Alapai Street and Lauhala Street. Thru-gutter and catch basin construction at Lauhala Street. (Estimated completion date, September 2007) Curb Ramps at Bishop Street between South Hotel Street and South King Street, Kekaulike Street/North Hotel Street, North Hotel Street/River Street, South King Street/Ward Avenue, Cooke Street/South King Street, Auahi Street/Kamakee Street, Middle Street/Rose Street, Kahauiki Street/Middle Street, Kamehameha IV Road/School Street, Hihio Place/Kamehameha IV Road, Kamehameha IV Road/Kilolani Place, Kamehameha IV Road/Kilohi Street, Kamehameha IV Road/Aoao Street, Kamehameha IV Road/Kalena Drive, Kamehameha IV Road (mid-block), Horner Lane/Kaua Street, Kamehameha IV Road/Kino Street, Campbell Avenue/Herbert Street, Campbell Avenue/Castle Street, Campbell Avenue/Brokaw Street, Campbell Avenue/Catherine Street, Campbell Avenue/Kaunaoa Street, Kanaina Avenue/Kaunaoa Street, Campbell Avenue/Esther Street: Construct new curb ramps, sidewalks and AC transition. Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers. (Estimated completion date, June 2007) Resurfacing of a Portion of (Estimated completion date, June 2007) Curb Ramps at (Estimated completion date, June 2007) Curb Ramps at Kaaahi Street & Kaamahu Place, Kaaahi Street & Kaaahi Place, Ahiahi Place & Lanakila Avenue, Bates Street & Bachelot Street, Nuuanu Avenue & Wylie Street: Construct new curb ramps, sidewalks and AC transition. Install pavement striping, markings and markers. (Estimated completion date, July 2007) Fort St. Mall & Hotel Street Sewer Replacement/Rehabilitation: Sewer line replacement and CIPP work along Hotel Street between Bethel Street and Bishop Street. (Estimated completion date, June 2007) Emergency Reconstruction of Wall in the Vicinity of (Estimated completion date, June 2007) Round (Estimated completion date, June 2007) Rehabilitation of South King Street between McCully Street and Old Waialae Road, East/West Hind Drive, Luinakoa Street, Kirkwood Place, Kupaua Place. Reconstruction, cold milling and resurfacing of asphalt roadway; construction of concrete bus pads; reconstruction of curbs and gutters; adjustment of utilities to grade; installation of pavement markings and vehicle loop detectors. (Estimated completion date, June 2007) KAILUA Curb Ramps at Akiohala Street and Keolu Drive, Pahumele Place and Keolu Drive, Hui Street and Keolu Drive, Keolu Drive and Akaakaawa Street, Kahili Street (Makai) and Akumu Street, Kahili Street (Mauka) and Akumu Street, Lopono Loop (Mauka) and Akumu Street, Hoolea Place and Akumu Street, Lopono Loop (Makai) and Akumu Street, Holoholo Street and Akumu Street, Halula Place and Akumu Street, Alahaki Street and Akumu Street, Akalei Place and Akumu Street, Akiu Place and Akumu Street, Akumu Place and Akumu Street: Construct new curb ramps, sidewalks and AC transition. Install pavement striping, markings and markers. Upgrade traffic signal system ( (Estimated completion date, June 2007) Rehabilitation of Kainehe Street (Kihapai Street to Kailua Road) and Hamakua Drive (Kailua Road to Keolu Drive): Roadway reconstruction, cold planning and resurfacing; construction of asphalt concrete and concrete bus pad; construction of curb ramps and associated traffic signal upgrades; reconstruction of existing concrete curbs and/or gutters, tree trimming and root pruning; adjustment of utility manholes frames and covers; pavement markings and vehicle detector loops. (Estimated completion date, July 2007) Reconstruction of Concrete Sidewalks - Kuulei Road, Uluniu Street, Kainehe Street, Kailua Road, Hahani Street, Hoolai Street, Aulike Street: Removal and reconstruction of damaged concrete sidewalk, curb and gutter areas, trimming of trees and cutting and removal of tree roots where the roots have damaged the areas, installing root barriers were required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work. (Estimated completion date, June 2007) KAIMUKI Pooleka Street Drainage Improvements – Pooleka Street to Waiomao Stream: Construct new drainage system. Final cleanup and grass maintenance. (Estimated completion date, June 2007) Curb Ramps at Various Locations, FY 2002(6) – (Estimated completion date, July 2007) KALIHI Curb Ramps at Various Locations, FY 2005(5) – Dillingham Blvd. & Mokauea, Dillingham Blvd. & Puuhale Street, Dillingham Blvd. & Laumaka Street, Dillingham Blvd. & GE Supply: Construct new curb ramps, sidewalks and AC transition. Install pavement striping, markings and markers. Upgrade traffic signal systems. (Estimated completion date, July 2007) Curb Ramps at (Estimated completion date, June 2007) KANEOHE Curb Ramps at (Estimated completion date, June 2007) Kawa Ditch Improvements: Naumanu Place & Nakuluai Street, Kaneohe: Removal existing trapezoidal concrete drain channel lining and reconstruction of new concrete rectangular channel. (Estimated completion date, August 2007) MILILANI Curb Ramps at Wailawa Street & Wailawa Place, Waimakua Drive & Wailawa Street, Waimakua Drive & Wainihi Street: Construct new curb ramps, sidewalks and AC transition. Install pavement striping, markings and markers. (Estimated completion date, July 2007) PALOLO Curb Ramps at (Estimated completion date, July 2007) Kuahea Street Interim Drainage Repair: Repair the existing disjointed or damaged 18” reinforced concrete pipes using cured in place lining. (Estimated completion date, June 2007) Reconstruction of Concrete Sidewalks, Moanalua Road and Kaahumanu Street: Reconstruct sidewalks, driveways, curbs, gutters and AC pavement. Adjust utility boxes to new sidewalk grade. Tree trimming, root pruning, installing root barriers and removal of trees where required. (Estimated completion date, November 2007) Localized Rehabilitation of Streets, Phase 2, Various Streets Work includes cold planing; resurfacing of asphalt concrete pavements; reconstruction of failed asphalt concrete pavement areas; adjustment of utility manhole frame and covers; installation of pavement markings; and locating existing manholes, valve boxes, monuments, etc. (Estimated completion date, January 2008) Curb Ramps at Noelani St. & Nola St. Construct new curb ramps, sidewalks and AC transition. Install pavement striping, markings and markers. Relocate regulatory signs. (Estimated completion date, June 2007) SALT LAKE Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street: Landscape maintenance. (Estimated completion date, July 2007) Curb Ramps at (Estimated completion date, June 2007) WAIALAE Curb Ramps at (Estimated completion date, July 2007) WAIANAE Hakimo Road Drainage Improvements, Hakimo Road and Ulehawa Street: Construct and install new storm drain inlet structures, RC pipe, manholes, outlet structure, riprap and chain link fence. Cold plan and repave existing A.C. pavement. (Estimated completion date, June 2007) WAIMANALO Miscellaneous guardrail improvements at 41-771 Kumuhau Street: Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry, and other incidental related work. (Estimated completion date, June 2007) WAIPAHU Curb Ramps at Various Locations, FY 2005(5) – Mokuola Street & Kauolu Place, Paiwa Street & Kahuanui Street: Construct new curb ramps, sidewalks and AC transition. Install pavement striping, markings and markers. (Estimated completion date, July 2007) Waikele Road Improvements: Work includes widening of Waikele Road and addition of curb and sidewalk fronting Waipahu Intermediate School, from Farrington Highway to Waipahu Flood Control Channel; adjustment of manholes, and boxes on the roadway being widened. (Estimated completion date, August 2007) Waipahu Street Drainage Improvements: Construct a new drainage system with 18”, 24”, 30”, and 36” RCP drain lines; drain inlets with concrete aprons; drain manholes; a special catch basin; concrete headwall and concrete swales. Other work includes the lowering of the existing water line, installing concrete jackets over the existing sewer lines, protecting the existing utility facilities, and necessary restoration work. (Estimated completion date, January 2008) WAIPIO Localized Rehabilitation of Streets, Phase 2, Various Streets Work includes cold planing; resurfacing of asphalt concrete pavements; reconstruction of failed asphalt concrete pavement areas; adjustment of utility manhole frame and covers; installation of pavement markings; and locating existing manholes, valve boxes, monuments, etc. (Estimated completion date, January 2008) PARADES, WALKS, RACES AND OTHER STREET CLOSURES
- 30 - Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879, Department of Transportation Services, TST Division 768-8387.. |
|||||||||
| Friday, June 01, 2007 |