Scheduled road work for the week beginning March 4, 2007, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch) is listed below.  Road work is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

AIEA

Miscellaneous Guardrail Improvements at Aiea Heights Drive:  Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry, and other incidental related work.

            (Estimated completion date, April 2007)

 

Kaonohi Street / Moanalua Road Intersection Improvements:  Work includes additional left turn lanes from Kaonohi Street to Moanalua Road, both directions; adding dedicated right turn lanes on Moanalua Road to Kaonohi Street, both directions; retrofitting countdown pedestrian signal heads; adding emergency vehicle preemption (EVP) detectors; installing new mast arms with standards and traffic signal heads for the traffic signal system; constructing a raised concrete median with chain link fence on Kaonohi Street Makai; pavement markings.  Contract work completed.  Extra work remains to be done.

            (Estimated completion date March 2007)

 

DIAMOND HEAD

Curb Ramps at Diamond Head Road & Coconut Avenue, Diamond Head Road & Beach road, Diamond Head Road & Kahala Avenue:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, May 2007)

 

Curb Ramps at Various Locations, FY 2002(6) Leahi Avenue & Monsarrat Avenue, Pualei Circle & Pualei Circle, Makapuu Avenue & Maunalei Avenue, Diamond Head Road & 18th Avenue, Diamond Head Road & 22nd Avenue, Diamond Head Road & Paikau Street, Paikau Street & Kaimanahila Street, Paikau Street & Kahala Aveneue:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade the traffic signal systems.

            (Estimated completion date, July 2007)

 

EWA

Fort Weaver Road Manhole and Pipe Rehabilitation:  Rehabilitate the existing sewer line with CIPP along Fort Weaver Road from Renton Road to Geiger Road.

            (Estimated completion date, March 2007)

 

HALEIWA

Miscellaneous Guardrail Improvements Haleiwa Road: Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry and other incidental related work.

            (Estimated completion date, April 2007)

 

HONOLULU

Rehabilitation of Beretania Street from N. King St. to Alapai St.  Traffic signal work at Alapai St.  Curb ramp construction at Alapai St.

            (Estimated completion date, September 2007)

 

Curb Ramps at Bishop Street between South Hotel Street and South King Street, Kekaulike Street/North Hotel Street, North Hotel Street/River Street, South King Street/Ward Avenue, Cooke Street/South King Street, Auahi Street/Kamakee Street, Middle Street/Rose Street, Kahauiki Street/Middle Street, Kamehameha IV Road/School Street, Hihio Place/Kamehameha IV Road, Kamehameha IV Road/Kilolani Place, Kamehameha IV Road/Kilohi Street, Kamehameha IV Road/Aoao Street, Kamehameha IV Road/Kalena Drive, Kamehameha IV Road (mid-block), Horner Lane/Kaua Street, Kamehameha IV Road/Kino Street, Campbell Avenue/Herbert Street, Campbell Avenue/Castle Street, Campbell Avenue/Brokaw Street, Campbell Avenue/Catherine Street, Campbell Avenue/Kaunaoa Street, Kanaina Avenue/Kaunaoa Street, Campbell Avenue/Esther Street:  Construct new curb ramps, sidewalks and AC transition.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, March 2007)

 

Resurfacing of a Portion of Dillingham Boulevard, Waiakamilo Road to Middle Street.  Reconstruction, cold milling and resurfacing of asphalt roadway; reconstruction of asphalt bus pads; adjustment of utilities to grade; installation of pavement markings and vehicle loop detectors.  The paving will be performed at night; all other activities are anticipated to be performed during daylight hours.

            (Estimated completion date, March 2007)

 

Curb Ramps at Emerson Street & Prospect Street, Iolani Avenue & Queen Emma Street (School Street & Lusitana Street), Hotel Street & Hale Makai Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers, upgrade traffic signal system.

            (Estimated completion date, May 2007)

 

Fort St. Mall & Hotel Street Sewer Replacement/Rehabilitation:  Sewer line replacement and CIPP work along Hotel Street between Bethel Street and Bishop Street.

            (Estimated completion date, February 2007)

 

Emergency Reconstruction of Wall in the Vicinity of 2839 Pacific Heights Road.  Reconstruct a retaining wall in the vicinity of 2839 Pacific Heights Road.  Work includes removing the existing damaged CRM wall and landslide spoils, temporarily relocate plants in the work area, install temporary excavation support and BMPs, install drill shaft piles and construct a reinforced concrete retaining wall.

            (Estimated completion date, June 2007)

 

Round Top Drive Emergency Roadway Repairs:  Install drilled caissons and tie-back systems, reconstruct roadway pavement and curbs, relocate existing water line, and install guardrails.

            (Estimated completion date, May 2007)

 

Rehabilitation of South King Street between McCully Street and Old Waialae Road, East/West Hind Drive, Luinakoa Street, Kirkwood Place, Kupaua Place.  Reconstruction, cold milling and resurfacing of asphalt roadway; construction of concrete bus pads; reconstruction of curbs and gutters; adjustment of utilities to grade; installation of pavement markings and vehicle loop detectors.

            (Estimated completion date, May 2007)

 

KAILUA

Curb Ramps at Akiohala Street & Keolu Drive, Pahumele Place & Keolu Drive, Hui Street& Keolu Drive, Keolu Drive & Akaakaawa Street, Kahili Street (Makai) & Akumu Street, Kahili Street (Mauka) & Akumu Street, Lopono Loop (Mauka) & Akumu Street, Hoolea Place & Akumu Street, Lopono Loop(Makai) & Akumu Street, Holoholo Street & Akumu Street, Halula Place & Akumu Street, Alahaki Street & Akumu Street, Akalei Place & Akumu Street, Akiu Place & Akumu Street, Akumu Place & Akumu Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade traffic signal system (Keolu Drive & Akakaawa Street only).

            (Estimated completion date, May 2007)

 

Rehabilitation of Kainehe Street (Kihapai Street to Kailua Road) and Hamakua Drive (Kailua Road to Keolu Drive):  Roadway reconstruction, cold planning and resurfacing; construction of asphalt concrete and concrete bus pad; construction of curb ramps and associated traffic signal upgrades; reconstruction of existing concrete curbs and/or gutters, tree trimming and root pruning; adjustment of utility manholes frames and covers; pavement markings and vehicle detector loops.

            (Estimated completion date, July 2007)

 

Kalaheo Avenue Reconstructed Sewer, from Kainui Drive to Kuulei Road: Road Closure for work on sewerline will be Monday thru Friday 8:30 a.m. to 6:00 pm and Saturday 9:00 a.m. to 6:00 p.m.

            (Estimated completion date, March 2007)

 

Curb Ramps at Keolu Drive & Kupau Street, Keolu Drive & Nanialii Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, May 2007)

 

Reconstruction of Concrete Sidewalks - Kuulei Road, Uluniu Street, Kainehe Street, Kailua Road, Hahani Street, Hoolai Street, Aulike Street: Removal and reconstruction of damaged concrete sidewalk, curb and gutter areas, trimming of trees and cutting and removal of tree roots where the roots have damaged the areas, installing root barriers were required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

            (Estimated completion date, May 2007)

 

KAIMUKI

Pooleka Street Drainage Improvements Pooleka Street to Waiomao Stream: Construct new drainage system.  Final cleanup and grass maintenance.

            (Estimated completion date, February 2007)

 

Curb Ramps at Various Locations, FY 2002(6) Malia Street & Alakoa Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

KALIHI

Curb Ramps at Lehua Street & Nihi Street, Amelia Street & North School Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, May 2007)

Curb Ramps at Waiakamilo Road & Alokele Street, Waiakamilo Road & Moonui Road, Dillingham Boulevard & McNeill Street, McNeill Street & Colburn Street.  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers. Relocate regulatory signs.

            (Estimated completion date, March 2007)

 

KANEOHE

Curb Ramps at Kamehameha Highway & Kolokio Street, Kamehameha Highway & Kapalai Road, Kamehameha Highway & Hoene Place:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, May 2007)

 

Reconstruction of Concrete Sidewalks on Alaloa Street, Haiku Road, Kahuhipa Street, Kamehameha Highway, Kawa Street, Mehana Street:  Removal and reconstruction of damaged concrete sidewalk, curb, and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the area; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated completion date, March 2007)

 

Curb Ramps at Hui Aeko Street and Hui Aeko Place, Hui Iwa Street between Kahekili Street and Hui Iwa Place, Hui Akikiki Place and Hui Iwa Street, Alaloa Street and Haiku Road, Kahuhipa Street and Alaloa Street, Kam Hwy., Lilipuna Street and Kahuhipa Street, Kam Hwy., Keaahala Street and William Henry Road, Kam Hwy., Paleka Road and Waikalua Road:  Upgrade traffic signal system.

            (Estimated completion date, March 2007)

 

MAKIKI

Curb Ramps at Anianiku Street and Auwaiolimu Street, Lewalani Drive, Mott-Smith Drive & Piikoi Street, Wilder Avenue and Kewalo Street, Wilder Avenue and Keeaumoku Street, Wilder Avenue and Makiki Street, Punahou Street and Wilder Avenue, Punahou Street and Clark Street, Punahou Street, Manoa Road and Nehoa Street, Wilder Street and Alexander Street, Wilder Street, Farrington Street and

Metcalf Street:  Upgrade traffic signal system.

            (Estimated completion date, March 2007)

 

PALOLO

Curb Ramps at Palolo Avenue & Palolo Recreation Center:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

PEARL CITY

Reconstruction of Concrete Sidewalks, Moanalua Road and Kaahumanu Street:  Reconstruct sidewalks, driveways, curbs, gutters and AC pavement.  Adjust utility boxes to new sidewalk grade.  Tree trimming, root pruning, installing root barriers and removal of trees where required.          (Estimated completion date, November 2007)

 

Curb Ramps at Noelani St. & Nola St.  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Relocate regulatory signs.

            (Estimated completion date, March 2007)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:  Landscape maintenance.

            (Estimated completion date, July 2007)

 

Curb Ramps at Ala Puumalu St. & Ala Oliko Pl., Ala Puumalu St. & Ala Punene Pl., Ala Puumalu St. & Ala Puumalu Pl.  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Relocate regulatory signs.

            (Estimated completion date, April 2007)

 

WAIALAE

Curb Ramps at Waialae Avenue & St. Louis Drive, Waialae Avenue & 3rd Avenue, Waialae Avenue & 6th Avenue, Waialae Avenue & 8th Avenue, Harding Avenue & 11th Avenue:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade the traffic signal systems.

            (Estimated completion date, July 2007)

 

WAIALUA

Waialua Beach Road Sidewalk Improvements, Phase II Waialua Beach Road (between Goodale Avenue and Haleiwa Road):  Final inspection punch-list work in progress; continue landscaping maintenance.

            (Estimated completion date, March 2007)

 

WAIANAE

Hakimo Road Drainage Improvements, Hakimo Road and Ulehawa Street:  Construct and install new storm drain inlet structures, RC pipe, manholes, outlet structure, riprap and chain link fence.  Cold plan and repave existing A.C. pavement.

            (Estimated completion date, June 2007)

 

WAIKIKI

Curb Ramps at Horbon Lane & Holomoana Street, Ena Road & Kalakaua Avenue, Koa Avenue & Liliuokalani Avenue, Kapahulu Avenue & Makee Road, Kapahulu Avenue & Campbell Avenue, Kapahulu Avenue & Kanaina Avenue:   Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade the traffic signal system.

            (Estimated completion date, May 2007)

 

WAIMANALO

Miscellaneous guardrail improvements at 41-771 Kumuhau Street:  Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry, and other incidental related work.

            (Estimated completion date, April 2007)

 

WAIPAHU

Waikele Road Improvements:  Work includes widening of Waikele Road and addition of curb and sidewalk fronting Waipahu Intermediate School, from Farrington Highway to Waipahu Flood Control Channel; adjustment of manholes, and boxes on the roadway being widened.

            (Estimated completion date, August 2007)

 

Waipahu Street Drainage Improvements:  Construct a new drainage system with 18, 24, 30, and 36 RCP drain lines; drain inlets with concrete aprons; drain manholes; a special catch basin; concrete headwall and concrete swales.  Other work includes the lowering of the existing water line, installing concrete jackets over the existing sewer lines, protecting the existing utility facilities, and necessary restoration work.

            (Estimated completion date, January 2008)

 

PARADES, WALKS, RACES AND OTHER STREET CLOSURES

 

March 4, 2007 Sunday
6:30AM Starts
11:00AM Ends

JACO CASTLE TO HANAUMA TIME TRIAL BIKE RACE sponsored by Boca Hawaii/USA Cycling/Jaco Van Delden. The event is expected to have 130 cyclists.  It will start at Maunawili Elem., to Kalanianole Hwy., west bound, past Waimanalo, past Makapuu, past Sandy Beach, finish at Entrance to Hanauma Bay Contact: Raul Torres 737-8985  For more info visit their website: http://www.bocahawaii.com/

 

March 4, 2007 Sunday
7:00AM Starts
11:00AM Ends

STRAUB/KAPIOLANI WOMEN'S 10K RUN sponsored by Straub/Kapiolani Clinic & Hospital. The event is expected to have 1500 runners.  The event will start at Kapiolani Park Band Stand at Kalakaua Ave., to Diamond Head Rd., to Kahala Ave.,  to Paikau St., to Diamond Head Rd., to 22nd Ave., to Kilauea Ave.,  to Elepaio St., to Kahala Ave., to Diamond Head Rd., to Kalakaua Ave.,  to end at the Honolulu Marathon finish line.  Contact:  KC Carlberg 946-0346

 

 

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879, Department of Transportation Services, TST Division 768-8387.

 