Scheduled road work for the week beginning May 20, 2007, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch) is listed below.  Road work is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

AIEA

Miscellaneous Guardrail Improvements at Aiea Heights Drive:  Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry, and other incidental related work.

            (Estimated completion date, May 2007)

 

Curb Ramps at Kaahele Street & Komo Mai Drive:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

Kaonohi Street / Moanalua Road Intersection Improvements:  Work includes additional left turn lanes from Kaonohi Street to Moanalua Road, both directions; adding dedicated right turn lanes on Moanalua Road to Kaonohi Street, both directions; retrofitting countdown pedestrian signal heads; adding emergency vehicle preemption (EVP) detectors; installing new mast arms with standards and traffic signal heads for the traffic signal system; constructing a raised concrete median with chain link fence on Kaonohi Street Makai; pavement markings.  Contract work completed.  Extra work remains to be done.

            (Estimated completion date May 2007)

 

Newtown Neighborhood Kaahele Street Improvements, Vicinity of Komo Mai Drive to Moanalua Road.  Work includes adding left turn pockets, pavement markings, and signs.

            (Estimated completion date, July 2007)

 

DIAMOND HEAD

Curb Ramps at Leahi Avenue and Monsarrat Avenue, Pualei Circle and Pualei Circle, Makapuu Avenue and Maunalei Avenue, Diamond Head Road and 18th Avenue, Diamond Head Road and 22nd Avenue, Diamond Head Road and Paikau Street, Paikau Street and Kaimanahila Street, Paikau Street and Kahala Aveneue:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade the traffic signal systems.

            (Estimated completion date, July 2007)

 

EWA

Curb Ramps at Kehue Street & North Road, Kehue Street & Kehue Place, Kehue Street & Kei Place, Kehue Street & Keele Place, Kehue Street & Kekaihili Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

Fort Weaver Road Manhole and Pipe Rehabilitation:  Rehabilitate the existing sewer line with CIPP along Fort Weaver Road from Renton Road to Geiger Road.

            (Estimated completion date, May 2007)

 

HALEIWA

Miscellaneous Guardrail Improvements Haleiwa Road: Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry and other incidental related work.

            (Estimated completion date, May 2007)

 

HAWAII KAI

Reconstruction of Concrete Sidewalks, Kawaihae Street Area, Hawaii Kai  Work includes removal and reconstruction of damaged concrete sidewalk, curb and gutter areas; trimming of trees and cutting, removal of tree roots where the roots have damaged the areas; installing root barriers where required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

            (Estimated completion date, January 2008)

 

HONOLULU

Rehabilitation of Beretania Street from N. King St. to Alapai St.  Traffic signal work at Richards and Queen Emma Streets.  Curb ramp construction at Alapai Street and Lauhala Street.  Thru-gutter and catch basin construction at Lauhala Street.

            (Estimated completion date, September 2007)

 

Curb ramps at Alexander Street/S. Beretania Street, Isenberg Street/S. Beretania Street, Kaheka Street/Kanunu Stree, Kaheka Street/Makaloa Street, Kalauokalani Way/Makaloa Street, Punahou Street/S. King Street, S. Beretania Street/Keeaumoku Street/Piikoi Street, Kinau Street/Victoria Street, S. Beretania Street/Pensacola Street/Victoria Street, S. Beretania Street/Victoria Street, S. Beretania Street/Ward Avenue, Coyne Street/University Avenue, Dole Street/East-West Road, Dole Street/University Avenue, Kahuna Lane/South King Street, University Avenue/Varsity Place, and Pawaina Street/Paumaka Place:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers, upgrade traffic signal system.

            (Estimated completion date, July 2007)

 

Curb Ramps at Bishop Street between South Hotel Street and South King Street, Kekaulike Street/North Hotel Street, North Hotel Street/River Street, South King Street/Ward Avenue, Cooke Street/South King Street, Auahi Street/Kamakee Street, Middle Street/Rose Street, Kahauiki Street/Middle Street, Kamehameha IV Road/School Street, Hihio Place/Kamehameha IV Road, Kamehameha IV Road/Kilolani Place, Kamehameha IV Road/Kilohi Street, Kamehameha IV Road/Aoao Street, Kamehameha IV Road/Kalena Drive, Kamehameha IV Road (mid-block), Horner Lane/Kaua Street, Kamehameha IV Road/Kino Street, Campbell Avenue/Herbert Street, Campbell Avenue/Castle Street, Campbell Avenue/Brokaw Street, Campbell Avenue/Catherine Street, Campbell Avenue/Kaunaoa Street, Kanaina Avenue/Kaunaoa Street, Campbell Avenue/Esther Street:  Construct new curb ramps, sidewalks and AC transition.  Install pedestrian push buttons, pull boxes, vehicle detector loops, striping, marking and markers.

            (Estimated completion date, May 2007)

 

Resurfacing of a Portion of Dillingham Boulevard, Waiakamilo Road to Middle Street.  Reconstruction, cold milling and resurfacing of asphalt roadway; reconstruction of asphalt bus pads has been completed.  Adjusting utilities to grade; installation of pavement markings and vehicle loop detectors.

            (Estimated completion date, June 2007)

 

Curb Ramps at Emerson Street and Prospect Street, Iolani Avenue and Queen Emma Street (School Street and Lusitana Street), Hotel Street and Hale Makai Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers, upgrade traffic signal system.

            (Estimated completion date, June 2007)

 

Curb Ramps at Kaaahi Street & Kaamahu Place, Kaaahi Street & Kaaahi Place, Ahiahi Place & Lanakila Avenue, Bates Street & Bachelot Street, Nuuanu Avenue & Wylie Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

Fort St. Mall & Hotel Street Sewer Replacement/Rehabilitation:  Sewer line replacement and CIPP work along Hotel Street between Bethel Street and Bishop Street.

            (Estimated completion date, May 2007)

 

Emergency Reconstruction of Wall in the Vicinity of 2839 Pacific Heights Road.  Reconstruct a retaining wall in the vicinity of 2839 Pacific Heights Road.  Work includes removing the existing damaged CRM wall and landslide spoils, temporarily relocate plants in the work area, install temporary excavation support and BMPs, install drill shaft piles and construct a reinforced concrete retaining wall.

            (Estimated completion date, June 2007)

 

Round Top Drive Emergency Roadway Repairs:  Install drilled caissons and tie-back systems, reconstruct roadway pavement and curbs, relocate existing water line, and install guardrails.

            (Estimated completion date, May 2007)

 

Rehabilitation of South King Street between McCully Street and Old Waialae Road, East/West Hind Drive, Luinakoa Street, Kirkwood Place, Kupaua Place.  Reconstruction, cold milling and resurfacing of asphalt roadway; construction of concrete bus pads; reconstruction of curbs and gutters; adjustment of utilities to grade; installation of pavement markings and vehicle loop detectors.

            (Estimated completion date, June 2007)

 

KAILUA

Curb Ramps at Akiohala Street and Keolu Drive, Pahumele Place and Keolu Drive, Hui Street and Keolu Drive, Keolu Drive and Akaakaawa Street, Kahili Street (Makai) and Akumu Street, Kahili Street (Mauka) and Akumu Street, Lopono Loop (Mauka) and Akumu Street, Hoolea Place and Akumu Street, Lopono Loop (Makai) and Akumu Street, Holoholo Street and Akumu Street, Halula Place and Akumu Street, Alahaki Street and Akumu Street, Akalei Place and Akumu Street, Akiu Place and Akumu Street, Akumu Place and Akumu Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade traffic signal system (Keolu Drive and Akaakaawa Street only).

            (Estimated completion date, June 2007)

 

Rehabilitation of Kainehe Street (Kihapai Street to Kailua Road) and Hamakua Drive (Kailua Road to Keolu Drive):  Roadway reconstruction, cold planning and resurfacing; construction of asphalt concrete and concrete bus pad; construction of curb ramps and associated traffic signal upgrades; reconstruction of existing concrete curbs and/or gutters, tree trimming and root pruning; adjustment of utility manholes frames and covers; pavement markings and vehicle detector loops.

            (Estimated completion date, July 2007)

 

Reconstruction of Concrete Sidewalks - Kuulei Road, Uluniu Street, Kainehe Street, Kailua Road, Hahani Street, Hoolai Street, Aulike Street: Removal and reconstruction of damaged concrete sidewalk, curb and gutter areas, trimming of trees and cutting and removal of tree roots where the roots have damaged the areas, installing root barriers were required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

            (Estimated completion date, May 2007)

 

KAIMUKI

Pooleka Street Drainage Improvements Pooleka Street to Waiomao Stream: Construct new drainage system.  Final cleanup and grass maintenance.

            (Estimated completion date, June 2007)

 

Curb Ramps at Various Locations, FY 2002(6) Malia Street and Alakoa Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

KALIHI

Curb Ramps at Various Locations, FY 2005(5) Dillingham Blvd. & Mokauea, Dillingham Blvd. & Puuhale Street, Dillingham Blvd. & Laumaka Street, Dillingham Blvd. & GE Supply:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade traffic signal systems.

            (Estimated completion date, July 2007)

 

Curb Ramps at Waiakamilo Road and Alokele Street, Waiakamilo Road and Moonui Road, Dillingham Boulevard and McNeill Street, McNeill Street and Colburn Street.  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers. Relocate regulatory signs.

            (Estimated completion date, June 2007)

 

KANEOHE

Curb Ramps at Kamehameha Highway and Kolokio Street, Kamehameha Highway and Kapalai Road, Kamehameha Highway and Hoene Place:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, June 2007)

 

Kawa Ditch Improvements:  Naumanu Place & Nakuluai Street, Kaneohe:  Removal existing trapezoidal concrete drain channel lining and reconstruction of new concrete rectangular channel.

            (Estimated completion date, August 2007)

 

MILILANI

Curb Ramps at Wailawa Street & Wailawa Place, Waimakua Drive & Wailawa Street, Waimakua Drive & Wainihi Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

PALOLO

Curb Ramps at Palolo Avenue and Palolo Recreation Center:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

Kuahea Street Interim Drainage Repair:  Repair the existing disjointed or damaged 18 reinforced concrete pipes using cured in place lining.

            (Estimated completion date, May 2007)

 

PEARL CITY

Reconstruction of Concrete Sidewalks, Moanalua Road and Kaahumanu Street:  Reconstruct sidewalks, driveways, curbs, gutters and AC pavement.  Adjust utility boxes to new sidewalk grade.  Tree trimming, root pruning, installing root barriers and removal of trees where required.  (Estimated completion date, November 2007)

 

Localized Rehabilitation of Streets, Phase 2, Various Streets  Work includes cold planing; resurfacing of asphalt concrete pavements; reconstruction of failed asphalt concrete pavement areas; adjustment of utility manhole frame and covers; installation of pavement markings; and locating existing manholes, valve boxes, monuments, etc.

            (Estimated completion date, January 2008)

 

Curb Ramps at Noelani St. & Nola St.  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Relocate regulatory signs.

            (Estimated completion date, June 2007)

 

SALT LAKE

Salt Lake Boulevard Widening Phase 2A, Bougainville Drive to Maluna Street:  Landscape maintenance.

            (Estimated completion date, July 2007)

 

Curb Ramps at Ala Puumalu St. and Ala Oliko Pl., Ala Puumalu St. and Ala Punene Pl., Ala Puumalu St. and Ala Puumalu Pl.  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Relocate regulatory signs.

            (Estimated completion date, June 2007)

 

WAIALAE

Curb Ramps at Waialae Avenue and St. Louis Drive, Waialae Avenue and 3rd Avenue, Waialae Avenue and 6th Avenue, Waialae Avenue and 8th Avenue, Harding Avenue and 11th Avenue:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade the traffic signal systems.

            (Estimated completion date, July 2007)

 

WAIANAE

Hakimo Road Drainage Improvements, Hakimo Road and Ulehawa Street:  Construct and install new storm drain inlet structures, RC pipe, manholes, outlet structure, riprap and chain link fence.  Cold plan and repave existing A.C. pavement.

            (Estimated completion date, June 2007)

 

WAIMANALO

Miscellaneous guardrail improvements at 41-771 Kumuhau Street:  Work includes metal guardrails, concrete, asphalt concrete pavement, concrete rubble masonry, and other incidental related work.

            (Estimated completion date, May 2007)

 

WAIPAHU

Curb Ramps at Various Locations, FY 2005(5) Mokuola Street & Kauolu Place, Paiwa Street & Kahuanui Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.

            (Estimated completion date, July 2007)

 

Waikele Road Improvements:  Work includes widening of Waikele Road and addition of curb and sidewalk fronting Waipahu Intermediate School, from Farrington Highway to Waipahu Flood Control Channel; adjustment of manholes, and boxes on the roadway being widened.

            (Estimated completion date, August 2007)

 

Waipahu Street Drainage Improvements:  Construct a new drainage system with 18, 24, 30, and 36 RCP drain lines; drain inlets with concrete aprons; drain manholes; a special catch basin; concrete headwall and concrete swales.  Other work includes the lowering of the existing water line, installing concrete jackets over the existing sewer lines, protecting the existing utility facilities, and necessary restoration work.

            (Estimated completion date, January 2008)

 

WAIPIO

Localized Rehabilitation of Streets, Phase 2, Various Streets  Work includes cold planing; resurfacing of asphalt concrete pavements; reconstruction of failed asphalt concrete pavement areas; adjustment of utility manhole frame and covers; installation of pavement markings; and locating existing manholes, valve boxes, monuments, etc.

            (Estimated completion date, January 2008)

 

PARADES, WALKS, RACES AND OTHER STREET CLOSURES

 

May 20, 2007 Sunday
5:45AM Starts
10:30AM Ends

ITU JAL HONOLULU Triathlon World CHAMPIONSHIP RACE sponsored by USA Triathlon/Honolulu Triathlon Race Committee/Japan Air Lines. The event is expected to have 2,000 participants. Staggered wave start 5:45 am.  Ala Moana Blvd, Nimitz Hwy, and Kamehameha Hwy makai side will be closed to traffic. Swim: Loop course (2X) just ewa of Magic Island, to end at Magic Island Swim/Bike Transition Bike: Magic Island Swim/Bike Transition area, to Ala Moana Park Rd., to Ala Moana Blvd., via ewa entrance/exit,  ewa on Ala Moana Blvd, makai half to Nimitz Hwy, ewa on Nimitz Hwy.,crossover to mauka side at Sand Island Rd., under the viaduct, ewa on Kam Hwy., crossover to makai side at Lagoon Dr.., ewa on Kam Hwy.,past airport, u turn at Arizona Rd.(Halawa Gate), kkhd on Kam Hwy., makai half right onto Lagoon Dr., makai on Lagoon Dr., kkhd most, makai bound lane,  to u turn at parking lot at dead end, mauka on Lagoon Dr., right onto Kam Hwy., kkhd on Kam Hwy., crossover to mauka side at Ahua St. ,onto Nimitz Hwy., crossover to makai side just kkhd of Sand Island Rd., kkhd on Nimitz Hwy.,  makai half to Ala Moana Blvd., makai half,  kkhd on Ala Moana Blvd., to ewa entr./exit, to Ala Moana Park Rd., to end at bike/run transition area near Magic Island  Run: Bike/Run transition area to Ala Moana Park Rd., to Atkinson entr./exit,. left to Ala Moana Blvd., makai lanes, ewa on Ala Moana Blvd., crossover to mauka side at Queen St., ewa on Ala Moana Blvd., right onto Cooke St., mauka on Cooke St., kkhd half, u turn just makai of Auahi St. intersection, makai on ewa half of Cooke St.,  left onto Ala Moana Blvd., kkhd on Ala Moana Blvd., U turn at Atkinson, ewa on Ala Moana Blvd., makai lanes, ewa on Ala Moana Blvd., crossover to mauka side at Queen St., ewa on Ala Moana Blvd., right onto Cooke St., mauka on Cooke St., kkhd half, u turn just makai of Auahi St. intersection, makai on ewa half of Cooke St.,  left onto Ala Moana Blvd., kkhd on Ala Moana Blvd., right into Atkinson entrance, makai on Ala Moana Park Rd, to end at Magic Island area  finish line.  Contact:  Premier Event Management, LLC, Steve Foster 864-0113, Fax:  685-6666.  For more info, visit their website:  www.honolulutriathlon.com

 

May 25, 2007  Friday
6:30PM Starts 9:00PM Ends

TROY BARBOZA LAW ENFORCEMENT TORCH RUN sponsored by Special Olympics Hawaii.  The event is expected to have 1,000 participants in relay teams, escorted by HPD.  It will start at Ft. DeRussy Park on Maluhia Rd., to Kalia Rd., to Ala Moana Blvd., Kalakaua Ave., Kapahulu Ave., Old Waialae Rd., end at Les Murakami Stadium.  Walk:  Koko Head/Waialae Ave., Old Waialae Rd., Kalei Rd., Lower Campus Rd., end at Les Murakami Stadium.  Contact Ben Moszkowicz 368-0680.  For more info, visit their website: http://www.specialolympicshawaii.org/index.html

 

May 25, 2007 Friday to 
May 28, 2007 Monday

5:00AM Starts
7:30PM Ends

MEMORIAL DAY PARKING RESTRICTIONS sponsored by City and County of Honolulu.  Parking will be prohibited on: 1)PUOWAINA DRIVE,           both sides, between Hookui Street and the gates to the National Memorial Cemetery of the Pacific at Punchbowl., 2) HOOKUI STREET,    both sides, between Puowaina Drive and Auwaiolimu Street. Contact: DTS-TST Div. 768-8387

 

May 26, 2007 Saturay
7:00AM Starts
9:00AM Ends

Wahiawa Pineapple Run sponsored by Wahiawa CPO Association. The event is in conjunction with the Wahiawa Pineapple Festival Parade.  It is expected to have 1,000 runners/walkersIt will start at Kaala Elementary School, to California Ave., to Kilani Ave., to Kam Hwy., to Kaukonahua Rd., to Kamananui Rd., to Wilikina Dr., to Kam Hwy., to Kam Hwy., to California Ave., to end at Kaala Elementary.  Contact John Cruz 653-0069 Fax: 653-0080

 

May 26, 2007 Saturay
9:00AM Starts
11:00AM Ends

WAHIAWA PINEAPPLE FESTIVAL PARADE sponsored by Wahiawa Community & Business Association. The event is expected to have 300 marchers, & 10 vehicles.  It will start at Kaala Elementary School, to California Ave., to North Cane St., end at Center St., Contact: Elizabeth Smithe  621-7097

 

 

 

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 523-4882, Wastewater Management Division, Construction Management - 527-5879, Department of Transportation Services, TST Division 768-8387..

 

Thursday, May 17, 2007

© Copyright 2002-2008 City and County of Honolulu, Hawaii
Privacy Statement | Technical Support | Customer Service | Policy | Accessibility | Diversity Statement