Scheduled road work for the week beginning February 17, 2008, for the Department of Design construction, Civil Division (Construction Management Branch), and Wastewater Division (Construction Management Branch) is listed below.  Road work is normally done between the hours of 8:30 AM and 3:30 PM unless otherwise noted.

 

AIEA

Newtown Neighborhood – Kaahele Street Improvements, Vicinity of Komo Mai Drive to Moanalua Road.  Work includes adding left turn pockets, pavement markings, and signs.  Change order work has been completed.  Additional extra work may be added.

            (Estimated completion date, February 2008)

 

Reconstruction of Concrete Sidewalks – Halawa Area:  Work includes:  removal and reconstruction of damaged concrete sidewalk, curb and gutter areas; trimming of trees and cutting and removal of tree roots where the roots have damaged the areas; installing root barriers where required; and adjustment of utility boxes to new sidewalk grades.

            (Estimated completion date, August 2008)

 

HONOLULU

Rehabilitation of Alewa Drive from Wyllie Street to Hoomaikai Street; work includes removal of existing asphalt concrete and Portland cement concrete pavements, roadway reconstruction with asphalt concrete pavement, reconstruction of existing asphalt concrete berms and concrete gutters, adjustment of utility manhole frames and covers, and installation of pavement markings, and other incidental related work.

            (Estimated completion date, October 2008)

 

Curb ramps at Alexander Street/S. Beretania Street, Isenberg Street/S. Beretania Street, Kaheka Street/Kanunu Stree, Kaheka Street/Makaloa Street, Kalauokalani Way/Makaloa Street, Punahou Street/S. King Street, S. Beretania Street/Keeaumoku Street/Piikoi Street, Kinau Street/Victoria Street, S. Beretania Street/Pensacola Street/Victoria Street, S. Beretania Street/Victoria Street, S. Beretania Street/Ward Avenue, Coyne Street/University Avenue, Dole Street/East-West Road, Dole Street/University Avenue, Kahuna Lane/South King Street, University Avenue/Varsity Place, and Pawaina Street/Paumaka Place:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers, upgrade traffic signal system.

            (Estimated completion date, February 2008)

 

Rehabilitation of Beretania Street from N. King St. to Alapai St.  Night work:  Roadway paving from Queen Emma Street to North King Street.  Adjust existing manhole frame and covers Alapai Street to Nuuanu Avenue.  Permanent striping work Alapai Street to Queen Emma Street.  Traffic loop detectors Alapai Street to Queen Emma Street.

            (Estimated completion date, April 2008)

 

Resurfacing of a Portion of Dillingham Boulevard, Waiakamilo Road to Middle Street.  Adjusting utilities to grade; installation of pavement markings and vehicle loop detectors.

            (Estimated completion date, February 2008)

 

Fort St. Mall & Hotel Street Sewer Replacement/Rehabilitation:  Sewer line replacement and CIPP work along Hotel Street between Bethel Street and Bishop Street.

            (Estimated completion date, February 2008)

 

Curb Ramps at Various Locations, FY 2005(3) – Hausten Street/South King Street, Kalakaua Avenue/Kapiolani Boulevard, Hoonanea Street/ Metcalf Street, Campus Road/Metcalf Street/University Avenue, Waialae Avenue/Wihelmina Rise/ 12th Avenue/Alohea Avenue, Alohea Avenue/Wela Street, Alohea Avenue/Edna Street, Mikihana Street/Mooheau Avenue, Francis Street/Upper Street, George Street/Upper Street, Hayden Street/Upper Street, Date Street/Kamoku Street/Kapiolani Boulevard, Young Street/Kaheka Street, 14th Avenue (A)/Waialae Avenue, 14th Avenue (B)/Waialae Avenue, and Elizabeth Street/Waialae Avenue:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers, upgrade traffic signal system.

            (Estimated completion date, March 2008)

 

Curb Ramps at Various Locations, FY 2004(3) – Kapiolani Boulevard & Paani Street, Kapiolani Boulevard & Wiliwili Street, Kapiolani Boulevard & Pumehana Street, Kaaha Street & University Avenue, Kalakaua Avenue & Young Street, Kalakaua Avenue & South King Street, Kalakaua Avenue & Philip Street, Kalakaua Avenue & South Beretania Street, Pensacola Street & Nehoa Street, Pensacola Street & Karratti Lane, Pensacola Street & Davenport Street, Pensacola Street & Hassinger Street, Pensacola Street & Kinau Street, Pensacola Street & South Beretania Street, Pensacola Street & Young Street, Pensacola Street & Alohi Way, Pensacola Street & Elm Street, Pensacola Street & Rycroft Street, Pensacola Street & Hoolai Street, Pensacola Street & Kaimaile Street:  Construct new curb ramps, sidewalks and AC transition.  Install pavement striping, markings and markers.  Upgrade the traffic signal systems.

            (Estimated completion date, February 2008)

 

Rehabilitation of Keeaumoku Street between Kapiolani Boulevard to Kinau Street; Rycroft Street from Kaheka Street to Sheridan; Sheridan Street between Kapiolani Boulevard to South King Street; South Street from Ala Moana Boulevard to South King Street; University Avenue between Coyne Street to Hihiwai Street.  Reconstruction of concrete curbs and gutters, and new bus pads.  Reconstruction and resurfacing of asphalt pavements.  Adjusting manhole to finish grade, installation of vehicle loop detectors, and permanent pavement markings.  Night paving of Keeaumoku Street.  Day time paving of Rycroft Street.

            (Estimated completion date, April 2008)

 

Round Top Drive Emergency Roadway Repairs:  Drilled caissons, tie-back systems, waterline & curbs installed.  Resurfacing and guardrails suspended until completion of Site 3, Phase 1.

            (Estimated completion date, February 2008)

 

Round Top Drive Emergency Roadway Repairs, Site 3, Phase I:  Clearing and grubbing of crib wall area complete.  Installed wire welded fabric in preparation of shotcrete application of existing crib wall.

            (Estimated completion date, February 2008)

 

Round Top Drive Emergency Roadway Repairs, Site 3, Phase II:  Micro-pile installation complete.  Installing reinforcement for crib wall tie-back system and rigid pavement; also included shotcrete wall finish; construct rigid pavement, concrete crib and guardrails.

            (Estimated completion date, February 2008)

 

Sand Island Basin Miscellaneous Sewer Rehabilitation:  Continue replacement of sewer manhole frame and covers and manhole rehabilitation in various locations.  Rehabilitation of the Ward Avenue sewer tunnel, Sand Island Access Road sewerline, Ala Moana Park sewerline, Moanalua sewerline and Nuuanu sewerline are forthcoming.

            (Estimated completion date, March 2008)

 

Rehabilitation of Various Streets on Oahu – St. Louis Drive from Alencastre Street to mauka end, Campbell Avenue from Kapahulu Avenue to Collins Street, Date Street from University Avenue to Kapahulu Avenue, Diamond Head Road from Trousseau Street to Makapuu Avenue, Diamond Head Road from Lighthouse to 3rd Lookout at Kahala end, Fourth Avenue from Waialae Avenue to Harding Avenue, Kapahulu Avenue from Harding Avenue to Kalakaua Avenue, Waialae Avenue from 1st Avenue to 16th Avenue, Dole Street from St. Louis Drive to Wilder Avenue.

            (Estimated completion date, April 2008.)

 

KAILUA

Rehabilitation of Kainehe Street (Kihapai Street to Kailua Road) and Hamakua Drive (Kailua Road to Keolu Drive):  Paving, traffic signal upgrades, adjustment utility manholes frames and covers to grade, and vehicle detector loops complete.  Installation of pavement markings, traffic sign and bridge deck joints require intermittent lane closures.

            (Estimated completion date, February 2008)

 

KANEOHE

Kawa Ditch Improvements:  Naumanu Place & Nakuluai Street, Kaneohe:  Removal existing trapezoidal concrete drain channel lining and reconstruction of new concrete rectangular channel.

            (Estimated completion date, February 2008)

 

MILILANI

Reconstruction of Concrete Sidewalks, Mililani Area, Fiscal Year 2005-2006:  Work includes removal and reconstruction of damaged concrete sidewalk, curb and gutter areas; trimming of trees and cutting, removal of tree roots where the roots have damaged the areas; installing root barriers where required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

            (Estimated completion date, September 2008)

 

NIU VALLEY

Niu Valley WWPS Force Main Reconstruction:  Restoration of the median in Kalaniana’ole Highway between Kawaikui Park and Niu Valley Shopping Center.

            (Estimated completion date February 2008)

 

PEARL CITY

Localized Rehabilitation of Streets, Phase 2, Various Streets (Manana & Momilani).  Work includes cold planing; resurfacing of asphalt concrete pavements; reconstruction of failed asphalt concrete pavement areas; adjustment of utility manhole frame and covers; installation of pavement markings; and locating existing manholes, valve boxes, monuments, etc.

            (Estimated completion date, February 2008)

 

WAIPAHU

Waikele Road Improvements:  Work includes widening of Waikele Road and addition of curb and sidewalk fronting Waipahu Intermediate School, from Farrington Highway to Waipahu Flood Control Channel; adjustment of manholes, and boxes on the roadway being widened.

            (Estimated completion date, February 2008)

 

Localized Rehabilitation of Streets, Phase 2, Various Streets  Work includes cold planing; resurfacing of asphalt concrete pavements; reconstruction of failed asphalt concrete pavement areas; adjustment of utility manhole frame and covers; installation of pavement markings; and locating existing manholes, valve boxes, monuments, etc.

            (Estimated completion date, February 2008)

 

PARADES, WALKS, RACES AND OTHER STREET CLOSURES

 

February 18, 2008 Monday
6:45AM Starts
11:00AM Ends

HAWAIIAN TELCOM GREAT ALOHA RUN sponsored by Great Aloha Run/Carole Kai Charities. The event is expected to have 26,000 runners. It will start on Nimitz Hwy. at Nuuanu Ave., to Nimitz Hwy., ewa bound, to Kamehameha Hwy then under the H-1 viaduct, to Kamehameha Hwy., to Aloha Stadium service road into the main gate of Aloha Stadium, to finish in the north end zone of Aloha Stadium. Contact:  Carol Jaxon 528-7388,  Fax: 528-7392 For more info, visit their website: http://www.greataloharun.com/      

 

February 20, 2008 Wednesday
8:45AM Starts
10:00AM Ends

WAIPAHU ELEMENTARY SCHOOL DRUG FREE WALK sponsored by Waipahu Elem. School. The event is expected to have 1,000 participants. It will start at Waipahu Elem. School on Waikele Rd., to Pupupuhi St., to Pupukahi St., to Farrington Hwy., to Pupupuhi St., to Waikele Rd., to finish at Waipahu Elem. School. Contact Roschelle Kalili 675-0150 ext. 268 Fax: 675-0120

 

- 30 -

 

Contact: Department of Design and Construction, Civil Design Division, Construction Management - 768-8839, Wastewater Management Division, Construction Management - 768-8794, Department of Transportation Services, TST Division 768-8390.

Friday, February 15, 2008

© Copyright 2002-2008 City and County of Honolulu, Hawaii
Privacy Statement | Technical Support | Customer Service | Policy | Accessibility | Diversity Statement