CONSTRUCTION WEEKLY REPORT Scheduled construction for week beginning March 28, 2010 for the Department of Design & Construction, Civil Division (Construction Management Branch), & Wastewater Division (Construction Management Branch). Roadwork is normally done between the hours of 8:30 AM & 3:30 PM unless otherwise noted. ***Motorists should anticipate intermittent lane closures when traversing through the area. EWA Ewa Villages Revitalization Project Area D Drainage Improvements Near Kapolei Parkway/Park Row/O.R.&L Railroad: Installation of an 8 x 6 box drain and connection to existing 10x 8 box drain. (Estimated completion date, June 2010) HALAWA Aliipoe Ditch Reconstruction Demolish, remove and reconstruct existing concrete drainage ditch. Construct maintenance access ramp and driveway. Install storm drain manholes, drain inlets, trench drain, and 18 drain pipes. Install new chain link fence. (Estimated completion date, March 2009) Rehabilitation of Secondary Streets at Pearl City Ulune Street (Kahuapaani Street to Kulawea Street), Aiealani Place (Halawa Heights Road to end), Fernridge Place (Halawa Heights Road to end), Halawa Heights Road (Fernridge Place to Mauka end), Hele Mauna Place (Halawa Heights Road to end), Kaimakani Street (Moanalua Road to Ulune Street), Palaialii Place (Halawa Heights Road to end), and Palaialii Way (Palaialii Place to end): Cold planing, reconstructing, and resurfacing pavement. Reconstructing base at bus stops. Adjusting street monuments, utility manhole frames and covers, installing pavement markings, reconstructing existing asphalt concrete berms with drainage openings. (Estimated completion date, April 2010) Localized Rehabilitation of Streets, Phase 4, Pearl City, The work includes: cold planing, resurfacing of asphalt concrete pavements, reconstruction of failed pavement areas; adjustment of manhole frame and covers, street survey frame and covers, installation of pavement markings; locating with GPS survey equipment manholes, valve boxes, monuments, etc. (Estimated completion date, Jan. 2, 2010) Curb Ramps at Various Locations, FY 2006 Koamano Road/Lunalilo Home Road, Construction of new curb ramps, sidewalks and A.C. transition. Installation of pedestrian push buttons, traffic signal pull boxes and vehicle detector loops. Installation of pavement striping, markings and markers. (Estimated completion date, September 2009) Reconstruction of Concrete Sidewalks, Work includes removal and reconstruction of damaged concrete sidewalk, curb and gutter areas; installing root barriers where required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work. (Estimated completion date, March 2010) Installation of a new 16 sewer line underground along . (Estimated completion date, July 7, 2010) Curb Ramps at Various Locations, FY 2006 Mapu Lane/Liliha Street, Construction of new curb ramps, sidewalks and A.C. transition. Installation of pedestrian push buttons and traffic signal pull boxes. Installation of pavement striping, markings and markers. (Estimated completion date, September 2009) Curb Ramps at Various Locations, FY 2008 (C) Construction of new curb ramps, sidewalks and A.C. transition. Installation of pavement striping, markings and markers. (Estimated completion date, March 2010) Construction of new CRM fence wall and installation of soil nail tie backs and reinforced shotecrete facing along the retaining wall at (Estimated completion date, June 10, 2010) Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1A and 1C: New sewer line and manhole installation on Dillingham Blvd, (Estimated completion date, March 2010) Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1B: New sewer line and manhole installation on Akina and (Estimated completion date, February 2010) Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1D: New sewer line and manhole installation on (Estimated completion date, December 2009) Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1G: New sewer line, manhole installation and sidewalk restoration on (Estimated completion date, November 2010) Localized Rehabilitation of Streets, Phase 3, Nuuanu (Dowsett Highlands), Pacific Heights, Pauoa Valley, Moanalua Valley to west of Fort Shafter, Salt Lake towards Foster Village: The work includes cold planing, resurfacing of asphalt concrete pavements, reconstruction of failed pavement areas; adjustment of manhole frame and covers, street survey frame and covers, installation of pavement markings; locating with GPS survey equipment manholes, valve boxes, monuments, etc. (Estimated Completion Date, January 2, 2010) Mapunapuna Industrial Subdivision Phase One of Tidal Flooding Remediation Program: Remove existing flap gates and install new check valves at outlet pipes in State channel fronting Re-grade swale and adjust Drain inlet to provide positive Drainage into existing Drain system. Reconstruct concrete wall at outlet pipes at State channel. Remove debris and sediment from existing storm Drains and channel area. Dewater State channel and install temporary dewatering dams. At the intersection of (Estimated completion date, April 30, 2010) New sewer line and manhole installation in complete on (Estimated completion date, December 2009) WORK COMPLETED AWAITING FINAL INSPECTION Reconstruction of The work includes the reconstruction and resurfacing of the above street; construction of concrete bus landings; curb ramps and associated traffic signal improvements; reconstruction of curbs, gutters and driveways; installation of pavement markings, adjustment of utility covers to grade; tree trimming and root pruning. Project Substantially Complete; Contractor addressing deficiencies. (Estimated completion date, October 2009) Rehabilitation of Kimo Drive Bridge Over Nuuanu Stream, Bridge No. 260 Work includes repair of spalls and cracks in the bridge concrete elements, concrete sidewalk and curb, new metal railing atop exiting guardrail, modification of bridge drainage system, bridge stream embankment erosion control. (Estimated start date April 12, 2010) Rehabilitation of Various Streets on Work on curbs and gutters in Kahala is complete. Work on (Estimated completion date, December 2008) Installation of cured in place pipe (CIPP), manhole rehabilitation, and lateral rehabilitation throughout (Estimated completion date, December 2009) Kuliouou Sewer Rehabilitation: Installation of cured in place pipe (CIPP), manhole rehabilitation, lateral rehabilitation, and some new installation of sewer lines. CIPP installation work at Summer Street and (Estimated completion date, August 2009) Wilhelmina Rise Sewer Rehabilitation: Installation of cured in place pipe (CIPP), lateral rehabilitation, and replacement of sewer lines by open trench. (Estimated completion date, November 2010) Seismic Retrofit of City Bridges at Various Locations, FY 08 Nehoa Street Bridge between Makiki Street and Anapuni Street, and Lusitana Street Bridge between Ladd Lane and Andrews Lane.: Installation of concrete and steel shear keys. Repair concrete spalls and cracks. Construction of concrete back wall. (Estimated completion date, August 2010) Rehabilitation of Secondary Streets at Kaimuki Pahoa Avenue, 8th Avenue to Kokohead Avenue, 22nd Avenue to Kilauea Avenue Excavating, reconstructing and resurfacing asphalt concrete pavements and base; reconstructing base at bus stops; adjusting street monuments, utility manhole frames and covers; installing pavement markings; reconstructing existing asphalt concrete berms with drainage openings. (Estimated completion date, May 2010) Curb Ramps at Various Locations, FY 2006 Lunaai Place/Lunaai Street, Construction of new curb ramps, sidewalks and A.C. transition. Installation of pavement striping, markings and markers. (Estimated completion date, September 2009) SUSPENDED ~ AWAITING CONTRACTOR TO ADDRIVEESS DEFICIENCIES Rehabilitation of Streets, Unit Paving, traffic signal upgrades, adjustment utility manholes frames and covers to grade, vehicle detector loops and pavement markings complete. Installation of traffic signs, bridge deck joints and deficiency require intermittent lane closures and punchlist items. (Estimated completion date, November 2007) Rehabilitation of Streets, Unit Reconstruct curbs, gutters, sidewalks and roadway pavement; construct new curb ramps and concrete bus pads; resurface roadway, reinstall signage, replace vehicle detector loops and install permanent pavement markings. The contractor is working on (Estimated completion date, December 2009) Rehabilitation of Secondary Streets in Repaving work is complete in Rehabilitation of Streets, Unit Cold planing; resurfacing and reconstruction of asphalt concrete pavements (ACP); adjustment of utility manhole frames and covers; installation of pavement markings and vehicle loop detectors; reconstruction of existing concrete curbs, gutters, sidewalks and Driveways; reconstruction of concrete catch basins; and construction of concrete and asphaltic concrete bus pads. (Estimated completion date, March 2010) Rehabilitation of Streets, Unit 63 Kuukama Street (Kalaheo Avenue to End), Kuuala Street (Kuukama Street to end), Kuumele Place, Kuuhale Street (Kuuala Street to Kainalu Drive), Kuuniu Street ( Kalaheo Avenue to Kuuala Street), Kuupua Street (Kuuala Street to Kainalu Drive) and Kuuhoa Place: Mill and resurface roadway surfaces; reconstruct speed humps; replace pavement markings; and adjust utility manholes to new pavement grade. Project substantially completed. Contractor addressing punchlist items. (Estimated completion date, February 2010) Wanaao Road/Keolu Drive Reconstructed Sewer: Installation of new sewer line along (Estimated completion date, April 2010) Installation of Cured In Place Pipe along (Estimated completion date, December 2009) Curb Ramps at Various Locations, FY 2006 Malulani Street/Mimo Place, Construction of new curb ramps, sidewalks and A.C. transition. Installation of pavement striping, markings and markers. (Estimated completion date, September 2009) Construction of a relief drainage system, removing existing drainage system and installing larger drain lines, three new inlets, a trench drain and new storm drain manholes (Estimated completion date, April 2010) Installation of new sewer lines, new manholes, and cured in place pipe (CIPP). Work will occur on Kaneohe Bay Drive between Mokapu Road and Kuono Place, Kaimalu Place and Way, Ikeanani Drive, and Kuakoa Place. (Estimated completion date Dec 2010) Kapunahala Road Retaining Wall near Construction of a concrete retaining wall and railing. Restore AC pavement, AC sidewalk and AC curb. Traffic detours will be provided after working hours. (Estimated completion date, Sept. 2010) Emergency Landslide Remediation Adjacent to Burger King Kaneohe: Grubb and grade the slope at the corner of (Estimated completion date November 2009) Demolish and remove existing RCP pipe, grated inlet and CRM outlet. Install new 24 RCP pipe, construct new inlet and outlet structures, construct new CRM retaining wall, and restore A.C. pavement. (Estimated completion date, December 2009) KAPOLEI Extension of Clearing, grubbing and mass grading for construction of new 6-lane wide roadway with bike lane, raised median strips, sewer, water, Drainage, street lighting and traffic signal systems, fences, sidewalks, curbs, gutters and subdrains, irrigation and landscaping, pavement markings and traffic signs. Installation of erosion controls and dust fences throughout the project. As of 4/2009, all work described above was substantially completed. Pre-final inspection with Federal, State and City agencies was conducted on 4/17/09. Punchlist work completed. Final Inspection was conducted on 8/7/09. One-year landscape maintenance period for street trees and grassing in progress. (Estimated completion date for landscape maintenance period, April 2010) MANOA WORK COMPLETED AWAITING FINAL INSPECTION Rehabilitation of Streets, Unit 50 Kalawao Place (Kalawao St to end), Kalawao Street (Kahaloa Drive to private road), Kalehua Street (Kahaloa Drive to end), Kaloaluiki Street (Lowrey Ave to Kalawao St), Kanu Street (Lowery Ave to Loi St), Loi Street (East Manoa Rd to Woodlawn Drive), Kahawai Street (Lowrey Ave to Huapala St), Woodlawn Drive (Lowrey Ave to Kahaloa St), Lowrey Avenue (Woodlawn Drive to Kalawao St), Kaaipu Avenue (Oahu Ave to end), Loomis Street (Mauka end to Makai end), Hiehie Street (Kaloaluiki St to end) and Vista Place (Lowrey Ave to end): Work includes reconstruction and resurfacing of the above roadways; reconstruction of curbs, gutters, sidewalks and driveways; tree removal, pruning and trimming; installation of pavement markings. Project is substantially complete; contractor addressing deficiencies. (Estimated completion date, July 2009) Rehabilitation of Local Streets, Phase 1: Work in Lanikai is complete except for permanent striping and manhole cover adjustments. Work in Manoa is on-going on MILILANI Curb Ramps at Various Locations, FY 2006 Construction of new curb ramps, sidewalks and A.C. transition. Installation of pavement striping, markings and markers. (Estimated completion date, September 2009) Curb Ramps at Various Locations, FY 2006 Mahimahi Street/Halemaumau Street: Construction of new curb ramps, sidewalks and A.C. transition. Installation of pavement striping, markings and markers. (Estimated completion date, September 2009) Curb Ramps at Various Locations, FY 2008 (C) Construction of new curb ramps, sidewalks and A.C. transition. Installation of pavement striping, markings and markers. (Estimated completion date, March 2010) Seismic Retrofit of City Bridges at Various Locations, FY Installation of concrete shear keys and restrictor boots. Repair concrete spalls and cracks. (Estimated completion date, August 2010) NUUANU Drainage Outfall Improvements for Waolani Stream at Construction of new SDMH and installation a check valve over the existing 18 RCP drain pipe. (Estimated completion date, July 2010) Localized Rehabilitation of Streets, Phase 3, Nuuanu (Dowsett Highlands), Pacific Heights, Pauoa Valley, Moanalua Valley to west of Fort Shafter, Salt Lake towards Foster Village: The work includes: cold planing, resurfacing of asphalt concrete pavements, reconstruction of failed pavement areas; adjustment of manhole frame and covers, street survey frame and covers, installation of pavement markings; locating with GPS survey equipment manholes, valve boxes, monuments, etc. (Estimated completion date, January 2, 2010) Rehabilitation of Kimo Drive Bridge Over Nuuanu Stream, Bridge No. 260 Repair of spalls and cracks in concrete elements, concrete sidewalk topping and curb, construction of new metal railing atop existing guardrail, modification of bridge drainage system, erosion control of bridge stream embankment. (Estimated start date July 2010) PALOLO Curb Ramps at Various Locations, FY 2006 Palolo Terrace/Palolo Avenue, Construction of new curb ramps, sidewalks and A.C. transition. Installation of pavement striping, markings and markers. (Estimated completion date, September 2009) Rehabilitation of Secondary Streets at Kaimuki Excavating, reconstructing and resurfacing asphalt concrete pavements and base; reconstructing base at bus stops; adjusting street monuments, utility manhole frames and covers; installing pavement markings; reconstructing existing asphalt concrete berms with drainage openings. (Estimated completion date, May 2010) Waimalu Sewer Rehabilitation/Reconstruction Phase I: Installation of new sewer lines/man holes and reconnection of existing sewer laterals along Hekaha, Kanuku, Lokowai, Lii-Ipo, Pahemo, and Olepe. (Estimated completion date, September 2010) Manana Infrastructure Improvements, Phase VI Construct 60-foot wide roadway from (Estimated completion date, December 2010) Bridge Rehabilitation At Various Locations Moanalua Road Bridge Over Waimalu Stream (Bridge No. 910): Partial demolition and removal of existing curbs, gutters and sidewalks on bridge deck. Reconstruct curbs, gutters, sidewalk and A.C. pavement. Repair spalled, delaminated and hollow sounding areas in bridge soffit, abutments and pier. Repair bridge parapet, metal railing and expansion and cold joints. (Estimated completion date, June 2010) Localized Rehabilitation of Streets, Phase 4, Pearl City, The work includes: cold planing, resurfacing of asphalt concrete pavements, reconstruction of failed pavement areas; adjustment of manhole frame and covers, street survey frame and covers, installation of pavement markings; locating with GPS survey equipment manholes, valve boxes, monuments, etc. (Estimated completion date, Jan. 2, 2010) Curb Ramps at Various Locations, FY 2006 Miko Street/Ukana Street: Construction of new curb ramps, sidewalks and A.C. transition. Installation of pavement striping, markings and markers. (Estimated completion date, September 2009) Rehabilitation of Secondary Streets at Pearl City Hoolaulea Street below Moanalua Road (Waimano Home Road to Hoomoe Road), Nanakai Place (Nanakai Street to end), Nanakai Street (Waimano Home Road to Hoomalu Street), Puu Kipa Street ( Nanakai Street to Nanakai Street): Cold planing, reconstructing, and resurfacing pavement. Reconstructing base at bus stops. Adjusting street monuments, utility manhole frames and covers, installing pavement markings, reconstructing existing asphalt concrete berms with drainage openings. (Estimated completion date, December 2009) Guardrail Improvements FY2006 Phase II Site C: Replace planter with new concrete sidewalk; install object markers; install standard metal guardrail post & spacers. (Estimated start date, February 2010) PEARLRIDGE Rehabilitation of Secondary Streets at Cold planing, reconstructing, and resurfacing pavement. Reconstructing base at bus stops. Adjusting street monuments, utility manhole frames and covers, installing pavement markings, reconstructing existing asphalt concrete berms with Drainage openings. (Estimated completion date, December 2009) Curb Ramps at Various Locations, FY 2006 Glen Avenue/Kolekole Drive, Construction of new curb ramps, sidewalks and A.C. transition. Installation of pavement striping, markings and markers. (Estimated completion date, September 2009) Curb Ramps at Various Locations, FY 2006 Kuhio Avenue/Kapahulu Avenue: Construction of new curb ramps, sidewalks and A.C. transition. Installation of pedestrian push buttons. Installation of pavement striping, markings and markers. (Estimated completion date, September 2009) Rehabilitation of Streets, Unit Reconstruct identified curbs, gutters, driveways and asphalt roadway. Resurface asphalt roadways; install permanent pavement markings; restore vehicle loop detectors and raise manhole and valve covers to grade. Anticipated start date of September 28, 2009; preliminary surveying to start August 19, 2009 (Estimated completion date, March 2010) WAIALUA Guardail Improvements FY2006 Phase II Site B: Remove existing guardrails & concrete posts; provide archaeological monitoring; install object markers; install standard metal guardrail, post & spacers. (Estimated start date: March 2010) WAIMANALO Retaining Walls Along Demolish existing spillway; construct of new retaining walls; install new GRP; regrade site; install new metal guardrails and posts; install new chain link fence. (Estimated start date: March 1, 2010) Emergency Repairs to Waipahu Street Arch Bridge Over Waikele Stream (Bridge No. 961) Road work complete. PreFinal inspection scheduled for 3/31/10. BMP slopes protection work item will be on punchlist until addressed satisfactorily. (Estimated completion date September 2009) Rehabilitation of Secondary Streets at Pearl City Paiwa Street (Farrington Highway to Waipahu Street), Waipahu Street (Hianakiu Street to Kaupu Place), Makoa Street (Puia Street to end to end), Puia Street (Anonui Street to Eleu Street, and Heahea Street to deadend): Cold planing, reconstructing, and resurfacing pavement. Reconstructing base at bus stops. Adjusting street monuments, utility manhole frames and covers, installing pavement markings, reconstructing existing asphalt concrete berms with drainage openings. (Estimated completion date, December 2009) Demolish and rebuild retaining wall, curb ramp, and portion of sidewalk adjacent to (Estimated completion date February 2010) |