CONSTRUCTION WEEKLY REPORT

 

Scheduled construction for week beginning April 4, 2010 for the Department of Design & Construction, Civil Division (Construction Management Branch), & Wastewater Division (Construction Management Branch).  Roadwork is normally done between the hours of 8:30 AM & 3:30 PM unless otherwise noted. 

 

***Motorists should anticipate intermittent lane closures when traversing through the area.

 

 

EWA

 

Ewa Villages Revitalization Project – Area “D” Drainage Improvements – Near Kapolei Parkway/Park Row/O.R.&L Railroad:

 

Installation of an 8’ x 6’ box drain and connection to existing 10’x 8’ box drain.

 

            (Estimated completion date, June 2010)

           

 

HALAWA

 

Aliipoe Ditch Reconstruction – Halawa Heights, Lalawai Drive and Kahema Place area:

 

Demolish, remove and reconstruct existing concrete drainage ditch.  Construct maintenance access ramp and driveway.  Install storm drain manholes, drain inlets, trench drain, and 18” drain pipes.  Install new chain link fence.

 

            (Estimated completion date, March 2009)

           

 

Rehabilitation of Secondary Streets at Pearl City – Ulune Street (Kahuapaani Street to Kulawea Street), Aiealani Place (Halawa Heights Road to end), Fernridge Place (Halawa Heights Road to end), Halawa Heights Road (Fernridge Place to Mauka end), Hele Mauna Place (Halawa Heights Road to end), Kaimakani Street (Moanalua Road to Ulune Street), Palaialii Place (Halawa Heights Road to end), and Palaialii Way (Palaialii Place to end):

 

Cold planing, reconstructing, and resurfacing pavement.  Reconstructing base at bus stops.  Adjusting street monuments, utility manhole frames and covers, installing pavement markings, reconstructing existing asphalt concrete berms with drainage openings.

 

            (Estimated completion date, April 2010)

 

 

Localized Rehabilitation of Streets, Phase 4, Pearl City, Newtown, Royal Summit,  Pacific Palisades, Pearlridge, Aiea, Aiea Heights, Halawa Heights, and Halawa Valley

 

The work includes: cold planing, resurfacing of asphalt concrete pavements, reconstruction of failed pavement areas; adjustment of manhole frame and covers, street survey frame and covers, installation of pavement markings; locating with GPS survey equipment manholes, valve boxes, monuments, etc.

           

            (Estimated completion date, Jan. 2, 2010)

 

 

 

HAWAII KAI

 

Curb Ramps at Various Locations, FY 2006 – Koamano Road/Lunalilo Home Road, Kalanipuu Street/Lunalilo Home Road, Waioli Street/Hawaii Kai Drive, Hawaii Kai Drive/Lunalilo Home Road:

 

Construction of new curb ramps, sidewalks and A.C. transition.  Installation of pedestrian push buttons, traffic signal pull boxes and vehicle detector loops.  Installation of pavement striping, markings and markers.

 

            (Estimated completion date, September 2009)

           

 

Reconstruction of Concrete Sidewalks, Kawaihae Street Area, Hawaii Kai:

Work includes removal and reconstruction of damaged concrete sidewalk, curb and gutter areas; installing root barriers where required, and adjustment of utility boxes to new sidewalk grades, and other incidental related work.

 

(Estimated completion date, March 2010)

 

HONOLULU

 

Amelia Street Relief Sewer – Amelia Street and adjoining School Street:

 

Installation of a new 16” sewer line underground along Amelia Street and portion of School Street at Amelia Street

 

           

            .

            (Estimated completion date, July 7, 2010)

           

 

Curb Ramps at Various Locations, FY 2006 – Mapu Lane/Liliha Street, University Avenue/South King Street, Kaimuki Avenue Mid Block:

 

Construction of new curb ramps, sidewalks and A.C. transition.  Installation of pedestrian push buttons and traffic signal pull boxes.  Installation of pavement striping, markings and markers.

 

            (Estimated completion date, September 2009)

           

 

Curb Ramps at Various Locations, FY 2008 (C) – Queen Emma Street (St. Andrew’s Priory Church Driveway), and Maunalei Avenue (Driveway between Pokole Street and Makapuu Avenue):

 

Construction of new curb ramps, sidewalks and A.C. transition.  Installation of pavement striping, markings and markers.

 

            (Estimated completion date, March 2010)

           

 

Iolani Avenue Retaining Wall:

 

Construction of new CRM fence wall and installation of soil nail tie backs and reinforced shotecrete facing along the retaining wall at 625 Iolani Avenue fronting Dole Community Garden. Restore A.C. sidewalk fronting new CRM wall.  Remove existing trees and re-plant new trees in the Dole Community Garden.

 

            (Estimated completion date, June 10, 2010)

           

 

 

Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1A and 1C:

New sewer line and manhole installation on Dillingham Blvd, Puuhale Road, Mokauea Street, and Kalihi Street.  Lane closures Monday thru Friday, 8:30 a.m. to 3:30 p.m.

           

            (Estimated completion date, March 2010)

           

 

Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1B:

New sewer line and manhole installation on Akina and Kaili Street. Lane Closures Monday thru Friday, 8:30 a.m. to 3:30 p.m.

           

            (Estimated completion date, February 2010)

           

 

Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1D:

New sewer line and manhole installation on Booth Road and Prospect Street.  Lane Closures Monday thru Friday, 8:30 a.m. to 3:30 p.m.

                       

            (Estimated completion date, December 2009)

           

 

Kalihi/Nuuanu Area Sewer Rehabilitation Phase 1G:

 

New sewer line, manhole installation and sidewalk restoration on Kuakini Street (between Nuuanu Avenue and Pali Highway) is ongoing.  Lane closures Monday thru Friday, 8:30 a.m. to 3:30 p.m.

           

            (Estimated completion date, November 2010)

           

 

Localized Rehabilitation of Streets, Phase 3, Nuuanu (Dowsett Highlands), Pacific Heights, Pauoa Valley, Moanalua Valley to west of Fort Shafter, Salt Lake towards Foster Village:

 

The work includes cold planing, resurfacing of asphalt concrete pavements, reconstruction of failed pavement areas; adjustment of manhole frame and covers, street survey frame and covers, installation of pavement markings; locating with GPS survey equipment manholes, valve boxes, monuments, etc.

 

            (Estimated Completion Date, January 2, 2010)

           

 

 

Mapunapuna Industrial Subdivision Phase One of Tidal Flooding Remediation Program:

Remove existing flap gates and install new check valves at outlet pipes in State channel fronting Kam Highway. Construct new DMH upstream of new check valves.

Re-grade swale and adjust Drain inlet to provide positive Drainage into existing Drain system. Reconstruct concrete wall at outlet pipes at State channel. Remove debris and sediment from existing storm Drains and channel area. Dewater State channel and install temporary dewatering dams.

 

At the intersection of Ahua Street and Awaawaloa Street, abandon existing storm drain on Ahua Street and install new storm drain MH on upstream end of abandoned pipe.

 

            (Estimated completion date, April 30, 2010)

             

 

Peterson Lane and Pua Lane Sewer Rehabilitation:

 

New sewer line and manhole installation in complete on King Street (between Dillingham Blvd. and Peterson Lane), Pua Lane and Peterson Lane.  Repaving of King, Peterson and Pua lane is complete. Punchlist items and reconstruction of Tamashiro market driveway remain.  One lane in each direction will be closed Monday thru Friday, 8:30 a.m. to 3:30 p.m.

 

           

 

(Estimated completion date, December 2009)

           

 

 

Rehabilitation of Localized Streets, Phase 5A – Kahala to Kaimuki Area

 

The work includes localized reconstruction of pavement and resurfacing of the streets indicated below; reconstruction of curbs, gutters, sidewalks and driveways are included; tree trimming, pruning and removal will be performed as necessary; post paving activities include permanent pavement markings and adjustment of utility manhole frames and covers to grade.  The affected roadways and limits of work are as follows:

 

            18th Avenue, from Harding Avenue to Diamond Head Road

19th Avenue, from H-1 Freeway to Kilauea Avenue including TMK: 32039051

            20th Avenue, from H-1 Freeway to Kilauea Avenue

            21st Avenue, from Harding Avenue to Kilauea Avenue

            22nd Avenue, from Harding Avenue to End

            Ahakea Street, from Aukai Avenue to Elepaio Street

            Ahina Street, from Ahakea Street to Aukai Avenue

            Ahuli Place, from Pahoa Avenue to End

            Alae Street, from Elepaio Street to Onaha Street

            Amau Street, from Hunakai Street to Pueo Street

            Apuwai Place, from Kilauea Avenue to End

            Aukai Avenue, from Kealaolu Avenue to Kahala Avenue

            Elepaio Street, from Kilauea Avenue to Kahala Avenue

            Farmers Road, from Kealaolu Avenue to Ulumaika Street

            Hakaka Place, from Hakaka Street to End

            Hakaka Street, from Palekaua Street to End

            Honua Street, from Onaha Street to Kolohala Street

            Hopeloa Place, from Puu Panini Avenue to End

            Huanui Place, from Huanui Street to End

Huanui Street, from 22nd Avenue to Puu Panini Avenue including TMK: 32061018

            Hunakai Street, from Waialae Avenue to Kahala Avenue

            Hunalewa Street, from 22nd Avenue to Huanui Street

            Hunapaa Street, from Huanui Street to End

            Iiwi Street, from Onaha Street to Kolohala Street

            Ipo Place, from 22nd Avenue to End

            Kaalawai Place, from Diamond Head Road to End

            Kaikoo Place, from Papu Circle to End

            Kaikuono Place, from Papu Circle to End

            Kaimanahila Street, from Paikau Street to Hakaka Street

            Kaimuki Avenue, from 18th Avenue to Luawai Street

            Kala Place, from Aukai Avenue to Kahala Avenue

            Kaualio Place, from 22nd Avenue to End

            Kealaolu Place, from Kealaolu Avenue to End

            Koae Place, from Koae Street to End

            Koae Street, from Hunakai Street to Amau Street

            Koloa Street, from Kahala Avenue to Elepaio Street

            Kolohala Street, from Onaha Street to Elepaio Street

            Kuana Street, from Onaha Street to Kolohala Street

            Kulamanu Street, from Kahala Avenue to Kulamanu Place

            Luakaha Place, from Luakaha Street to End

            Luakaha Street, from Luawai Street to End

            Luawai Place, from Luawai Street to End

            Luawai Street, from 20th Avenue to Pahoa Avenue

            Makaiwa Street, from Kilauea Avenue to Pueo Street

            Makalike Place, from 22nd Avenue to End

            Malapua Place, from 22nd Avenue to End

            Maunaloa Avenue, from 18th Avenue to 22nd Avenue

            Moa Street, from Pueo Street to Makaiwa Street

            Noio Street, from Onaha Street to Kolohala Street

            Onaha Street, from Kilauea Avenue to Kolohala Street

Pahoa Avenue, from Kilauea Avenue to Moa Street and from 18th Avenue to 22nd Avenue

            Paikau Street, from 22nd Avenue to Kahala Avenue

            Palekaua Place, from Palekaua Street to End

            Palekaua Street, from Puu Panini Avenue to Hakaka Street

            Pana Place, from Paikau Street to End

            Panini Loop, from Puu Panini Avenue to Puu Panini Avenue

            Pilialo Street, from Luawai Street to Kaimuki Avenue

            Poka Place, from Poka Street to End

            Poka Street, from Paikau Street to Diamond Head Road

            Pokapahu Place, from Paikau Street to End

            Pueo Street, from Kahala Avenue to Hunakai Street

            Puulani Place, from Hunakai Street to End

            Puu Panini Avenue, from Kilauea Avenue to 22nd Avenue

            Ulili Street, from Onaha Street to Kahala Avenue

            Ulumaika Street, from Hunakai Street to Hunakai Street

            Ulupua Place, from 22nd Avenue to End

            Waikui Street, off Kalanianaole Highway

            Waiohinu Drive, from Makaiwa Street to Makaiwa Street

 

            (Estimated Completion November 23, 2010)

         

 

 

Reconstruction of Lusitana Street – From Pauoa Avenue to Iolani Avenue

 

The work includes the reconstruction and resurfacing of the above street; construction of concrete bus landings; curb ramps and associated traffic signal improvements; reconstruction of curbs, gutters and driveways; installation of pavement markings, adjustment of utility covers to grade; tree trimming and root pruning.

 

Project Substantially Complete; Contractor addressing deficiencies.

           

            (Estimated completion date, October 2009)

         

 

 

Rehabilitation of Kimo Drive Bridge Over Nuuanu Stream, Bridge No. 260

 

Work includes repair of spalls and cracks in the bridge concrete elements, concrete sidewalk and curb, new metal railing atop exiting guardrail, modification of bridge drainage system, bridge stream embankment erosion control.

 

            (Estimated start date April 12, 2010)

           

 

 

Rehabilitation of Various Streets on Oahu:  

 

Curb and gutter work in Kahala is complete.  Work on Nehoa Street is complete.  Work on Pacific Heights Drive is being scheduled for April, 2010.

 

            (Estimated completion date, December 2008)

           

 

 

Saint Louis Heights Sewer Rehabilitation:

 

Installation of cured in place pipe (CIPP), manhole rehabilitation, and lateral rehabilitation throughout Saint Louis Heights.  The contractor will also install new sewer lines via pipe bursting at 3 locations along Saint Louis Drive and one easement location between Saint Louis Drive and Frank Street.

 

            (Estimated completion date, December 2009)

           

 

 

Kuliouou Sewer Rehabilitation:

 

Installation of cured in place pipe (CIPP), manhole rehabilitation, lateral rehabilitation, and some new installation of sewer lines.

 

 

 

CIPP installation work at Summer Street and Kalanianaole Highway and May Way.

           

            (Estimated completion date, August 2009)

           

 

 

Wilhelmina Rise Sewer Rehabilitation:

 

Installation of cured in place pipe (CIPP), lateral rehabilitation, and replacement of sewer lines by open trench.

 

(Estimated completion date, November 2010)

           

 

 

Seismic Retrofit of City Bridges at Various Locations, FY 08 – Nehoa Street Bridge between Makiki Street and Anapuni Street, and Lusitana Street Bridge between Ladd Lane and Andrews Lane.:

 

 

Installation of concrete and steel shear keys.  Repair concrete spalls and cracks.  Construction of concrete back wall.

 

            (Estimated completion date, August 2010)

           

 

 

 

Rehabilitation of Secondary Streets at Kaimuki – Pahoa Avenue, 8th Avenue to Kokohead Avenue, 22nd Avenue to Kilauea Avenue

 

Excavating, reconstructing and resurfacing asphalt concrete pavements and base; reconstructing base at bus stops; adjusting street monuments, utility manhole frames and covers; installing pavement markings; reconstructing existing asphalt concrete berms with drainage openings.

 

            (Estimated completion date, May 2010)

           

 

 

KAILUA

 

Curb Ramps at Various Locations, FY 2006 – Lunaai Place/Lunaai Street, Lunaanela Street/Lunaai Street, Lunaanela Street/Lunaanela Street, Lunahelu St,/Lunaanela Street, Lunaai Street/Lunahelu Street:

 

Construction of new curb ramps, sidewalks and A.C. transition.  Installation of pavement striping, markings and markers.

 

            (Estimated completion date, September 2009)

           

 

 

SUSPENDED ~ AWAITING CONTRACTOR TO ADDRIVEESS DEFICIENCIES

Rehabilitation of Streets, Unit 42 – Kainehe Street (Kihapai Street to Kailua Road) and Hamakua Drive (Kailua Road to Keolu Drive):

 

Paving, traffic signal upgrades, adjustment utility manholes frames and covers to grade, vehicle detector loops and pavement markings complete.  Installation of traffic signs, bridge deck joints and deficiency require intermittent lane closures and punchlist items.

 

            (Estimated completion date, November 2007)

           

 

Rehabilitation of Streets, Unit 46 – Kailua Road (Hamakua Bridge to Kuulei Road); and Kuulei Road (Kailua Road to Kainalu Drive):

 

Reconstruct curbs, gutters, sidewalks and roadway pavement; construct new curb ramps and concrete bus pads; resurface roadway, reinstall signage, replace vehicle detector loops and install permanent pavement markings. The contractor is working on Kainalu Drive in Kailua.  Work is expected to be completed by December 2009.

 

            (Estimated completion date, December 2009)

           

 

 

Rehabilitation of Secondary Streets in Kailua

 

Repaving work is complete in Kailua.  Punch list items and permanent striping are being performed by the contractor.

 

           

 

 

Rehabilitation of Streets, Unit 52 – Keolu Drive (Kalanianaole Highway to Akahai Street); Keolu Drive (Akaakaawa Street to Wanaao Road):

 

Cold planing; resurfacing and reconstruction of asphalt concrete pavements (ACP); adjustment of utility manhole frames and covers; installation of pavement markings and vehicle loop detectors; reconstruction of existing concrete curbs, gutters, sidewalks and Driveways; reconstruction of concrete catch basins; and construction of concrete and asphaltic concrete bus pads.

 

            (Estimated completion date, March 2010)

           

 

 

WORK COMPLETE ~ LAST REPORT

Rehabilitation of Streets, Unit 63 – Kuukama Street (Kalaheo Avenue to End), Kuuala Street (Kuukama Street to end), Kuumele Place, Kuuhale Street (Kuuala Street to Kainalu Drive), Kuuniu Street ( Kalaheo Avenue to Kuuala Street), Kuupua Street (Kuuala Street to Kainalu Drive) and Kuuhoa Place:

 

Mill and resurface roadway surfaces; reconstruct speed humps; replace pavement markings; and adjust utility manholes to new pavement grade.

 

Project substantially completed. Contractor addressing punchlist items.

 

            (Estimated completion date, February 2010)

           

 

Wanaao Road/Keolu Drive Reconstructed Sewer:

 

Installation of new sewer line along Keolu Drive (Nanialii Street to Wanaao Road) and Wanaao Road (Keolu Drive to Auwinala Road).

 

            (Estimated completion date, April 2010)

           

 

 

Kalaheo Avenue/Mokapu Road/Aikahi Loop Sewer Rehabilitation:

 

Installation of Cured In Place Pipe along Mokapu Boulevard, from the intersection of Mokapu and Kalaheo, and Aikahi Loop.

 

            (Estimated completion date, December 2009)

           

 

 

 

KANEOHE  

 

Curb Ramps at Various Locations, FY 2006 – Malulani Street/Mimo Place, Miha Street/Malulani Street:

 

Construction of new curb ramps, sidewalks and A.C. transition.  Installation of pavement striping, markings and markers.

 

            (Estimated completion date, September 2009)

           

 

 

 

Duncan Drive – Puahuula Place Relief Drain

 

Construction of a relief drainage system, removing existing drainage system and installing larger drain lines, three new inlets, a trench drain and new storm drain manholes

 

            (Estimated completion date, April 2010)

           

 

 

Kaneohe Bay Drive Trunk Sewer Reconstruction:

Installation of new sewer lines, new manholes, and cured in place pipe (CIPP).  Work will occur on Kaneohe Bay Drive between Mokapu Road and Kuono Place, Kaimalu Place and Way, Ikeanani Drive, and Kuakoa Place.

 

            (Estimated completion date Dec 2010)

             

 

Kapunahala Road Retaining Wall near 45-866 Anoi Road

 

Construction of a concrete retaining wall and railing.  Restore AC pavement, AC sidewalk and AC curb.  Traffic detours will be provided after working hours.

  

(Estimated completion date, Sept. 2010)

           

 

 

Emergency Landslide Remediation Adjacent to Burger King Kaneohe:

 

Grubb and grade the slope at the corner of Likelike Highway and Kamehameha Highway and constructed a two (2) tier retaining wall with segmental concrete blocks.  The work includes restoration of the access road, Burger King’s parking lot and landscape.

 

           

(Estimated completion date November 2009)

           

 

Lilipuna Road Storm Drainage Improvements:

 

Demolish and remove existing RCP pipe, grated inlet and CRM outlet.  Install new 24” RCP pipe, construct new inlet and outlet structures, construct new CRM retaining wall, and restore A.C. pavement. 

 

            (Estimated completion date, December 2009)

           

 

 

KAPOLEI

Extension of Kapolei Parkway, Phase 8B (North-South Road to Renton Road):

 

Clearing, grubbing and mass grading for construction of new 6-lane wide roadway with bike lane, raised median strips, sewer, water, Drainage, street lighting and traffic signal systems, fences, sidewalks, curbs, gutters and subdrains, irrigation and landscaping, pavement markings and traffic signs.  Installation of erosion controls and dust fences throughout the project.

 

 

As of 4/2009, all work described above was substantially completed.  Pre-final inspection with Federal, State and City agencies was conducted on 4/17/09. Punchlist work completed. Final Inspection was conducted on 8/7/09.

 

One-year landscape maintenance period for street trees and grassing in progress.

 

            (Estimated completion date for landscape maintenance period, April 2010)

           

 

 

 

 

MANOA

 

WORK COMPLETED AWAITING FINAL INSPECTION

Rehabilitation of Streets, Unit 50 – Kalawao Place (Kalawao St to end), Kalawao Street (Kahaloa Drive to private road), Kalehua Street (Kahaloa Drive to end), Kaloaluiki Street  (Lowrey Ave to Kalawao St), Kanu Street (Lowery Ave to Loi St), Loi Street (East Manoa Rd to Woodlawn Drive), Kahawai Street (Lowrey Ave to Huapala St), Woodlawn Drive (Lowrey Ave to Kahaloa St), Lowrey Avenue (Woodlawn Drive to Kalawao St), Kaaipu Avenue (Oahu Ave to end), Loomis Street (Mauka end to Makai end), Hiehie Street (Kaloaluiki St to end) and Vista Place (Lowrey Ave to end):

 

Work includes reconstruction and resurfacing of the above roadways; reconstruction of curbs, gutters, sidewalks and driveways; tree removal, pruning and trimming; installation of pavement markings.

 

Project is substantially complete; contractor addressing deficiencies.

           

            (Estimated completion date, July 2009)

         

 

 

 

Rehabilitation of Local Streets, Phase 1: 

 

Work is currently on-going on Oahu Avenue in Manoa.  Work is expected to be completed by the April 9, 2010.  Kihapai Street in Kailua is expected to be completed on April 9th.  Work is being planned for Moanalua Road beginning April 12, 2010.

 

           

 

 

 

MILILANI 

 

Curb Ramps at Various Locations, FY 2006 – Kukolu Street/Hokuula Loop./Kipapa Drive, Hokuula Loop./Kipapa Drive, Ia Place/Kipapa Drive, Naholoholo Street/Kipapa Drive, Wailoa Loop./Kanamee Street/Kipapa Drive, Wailoa Loop./Naholoholo Street/Kipapa Drive:

 

Construction of new curb ramps, sidewalks and A.C. transition.  Installation of pavement striping, markings and markers.

 

(Estimated completion date, September 2009)

           

 

 

NIU VALLEY

 

Curb Ramps at Various Locations, FY 2006 – Mahimahi Street/Halemaumau Street:

 

Construction of new curb ramps, sidewalks and A.C. transition.  Installation of pavement striping, markings and markers.

 

            (Estimated completion date, September 2009)

           

 

Curb Ramps at Various Locations, FY 2008 (C) – Halemaumau Street/Haleola Street, Halemaumau Street/Kanau Street, Halemaumau Street/Kawaikui Street, Halemaumau Street/Pia Street:

Construction of new curb ramps, sidewalks and A.C. transition.  Installation of pavement striping, markings and markers.

 

            (Estimated completion date, March 2010)

           

 

Seismic Retrofit of City Bridges at Various Locations, FY 08 – Halemaumau Street Bridge:  Halemaumau Street/Haleola Street

 

Installation of concrete shear keys and restrictor boots.  Repair concrete spalls and cracks.

 

            (Estimated completion date, August 2010)

           

 

NUUANU

 

Drainage Outfall Improvements for Waolani Stream at Kawananakoa Place – 105-D Kawananakoa Place:

 

Construction of new SDMH and installation a check valve over the existing 18” RCP drain pipe.

 

            (Estimated completion date, July 2010)

           

 

 

Localized Rehabilitation of Streets, Phase 3, Nuuanu (Dowsett Highlands), Pacific Heights, Pauoa Valley, Moanalua Valley to west of Fort Shafter, Salt Lake towards Foster Village:

 

 

The work includes: cold planing, resurfacing of asphalt concrete pavements, reconstruction of failed pavement areas; adjustment of manhole frame and covers, street survey frame and covers, installation of pavement markings; locating with GPS survey equipment manholes, valve boxes, monuments, etc.

 

            (Estimated completion date, January 2, 2010)

           

 

 

Rehabilitation of Kimo Drive Bridge Over Nuuanu Stream, Bridge No. 260

Repair of spalls and cracks in concrete elements, concrete sidewalk topping and curb, construction of new metal railing atop existing guardrail, modification of bridge drainage system, erosion control of bridge stream embankment.

 

            (Estimated start date July 2010)

           

 

PALOLO

 

Curb Ramps at Various Locations, FY 2006 – Palolo Terrace/Palolo Avenue, Wiliama Place/Palolo Avenue, Kanekopa Place/Palolo Avenue, Lamaloa Place/Palolo Avenue, Ahinahina Place/Palolo Avenue:

 

Construction of new curb ramps, sidewalks and A.C. transition.  Installation of pavement striping, markings and markers.

 

            (Estimated completion date, September 2009)          

 

Rehabilitation of Secondary Streets at Kaimuki – Palolo Avenue, Waialae Avenue to 10th Avenue in Palolo Valley

 

Excavating, reconstructing and resurfacing asphalt concrete pavements and base; reconstructing base at bus stops; adjusting street monuments, utility manhole frames and covers; installing pavement markings; reconstructing existing asphalt concrete berms with drainage openings.

 

            (Estimated completion date, May 2010)

 

 

 

PEARL CITY

 

Waimalu Sewer Rehabilitation/Reconstruction Phase I:

 

Installation of new sewer lines/man holes and reconnection of existing sewer laterals along Hekaha, Kanuku, Lokowai, Lii-Ipo, Pahemo, and Olepe.

 

            (Estimated completion date, September 2010)

           

 

 

 

Manana Infrastructure Improvements, Phase VI – Connector Road (Kuala Street to Kuahaka Street)

 

Construct 60-foot wide roadway from Kuala Street to Kuahaka Street. The work includes, vector control; clearing, grubbing and grading; installation of new storm drain, Heco, Hawaiian Telcom, street light and traffic signal systems; concrete slab protection for existing sewer and water lines; grade adjustments in private lots; new noise and retaining walls, chain link fence and gates: reconstruction of existing drain, water and sewer MHs and valves to new finish grade; installation of curbs, gutters, sidewalks, driveways, curb ramps and sidewalk culverts; installation of irrigation system and landscape improvements; tree removal and pruning in private lots; road paving; pavement markings and markers and street signs.

 

            (Estimated completion date, December 2010)

           

 

 

Bridge Rehabilitation At Various Locations

Moanalua Road Bridge Over Waimalu Stream (Bridge No. 910):

 

Partial demolition and removal of existing curbs, gutters and sidewalks on bridge deck. Reconstruct curbs, gutters, sidewalk and A.C. pavement. Repair spalled, delaminated and hollow sounding areas in bridge soffit, abutments and pier. Repair bridge parapet, metal railing and expansion and cold joints.

 

           

 

            (Estimated completion date, June 2010)

           

 

 

Localized Rehabilitation of Streets, Phase 4, Pearl City, Newtown, Royal Summit,  Pacific Palisades, Pearlridge, Aiea, Aiea Heights, Halawa Heights, and Halawa Valley

 

 

 

The work includes: cold planing, resurfacing of asphalt concrete pavements, reconstruction of failed pavement areas; adjustment of manhole frame and covers, street survey frame and covers, installation of pavement markings; locating with GPS survey equipment manholes, valve boxes, monuments, etc.

 

 

            (Estimated completion date, Jan. 2, 2010)

 

 

 

Curb Ramps at Various Locations, FY 2006 – Miko Street/Ukana Street:

 

Construction of new curb ramps, sidewalks and A.C. transition.  Installation of pavement striping, markings and markers.

 

            (Estimated completion date, September 2009)

           

 

Rehabilitation of Secondary Streets at Pearl City – Hoolaulea Street below Moanalua Road  (Waimano Home Road to Hoomoe Road), Nanakai Place (Nanakai Street to end), Nanakai Street (Waimano Home Road to Hoomalu Street), Puu Kipa Street ( Nanakai Street to Nanakai Street):

 

Cold planing, reconstructing, and resurfacing pavement.  Reconstructing base at bus stops.  Adjusting street monuments, utility manhole frames and covers, installing pavement markings, reconstructing existing asphalt concrete berms with drainage openings.

 

            (Estimated completion date, December 2009)

 

 

Guardrail Improvements – FY2006 Phase II

Site C:  Komo Mai Drive – between Hoolaulea and Hoohulu Street:

 

Replace planter with new concrete sidewalk; install object markers; install standard metal guardrail post & spacers.

 

           

            (Estimated start date,  February 2010)

           

 

 

 

PEARLRIDGE

 

Rehabilitation of Secondary Streets at Pearl City – Kaonohi Street ( Kaonohi Place to entire loop), and Kaonohi Street (Kamehameha Highway to Moanalua Road):

 

Cold planing, reconstructing, and resurfacing pavement.  Reconstructing base at bus stops.  Adjusting street monuments, utility manhole frames and covers, installing pavement markings, reconstructing existing asphalt concrete berms with Drainage openings.

 

            (Estimated completion date, December 2009)

 

 

WAHIAWA

 

Curb Ramps at Various Locations, FY 2006 – Glen Avenue/Kolekole Drive, Crest Avenue/Glen Avenue:

 

Construction of new curb ramps, sidewalks and A.C. transition.  Installation of pavement striping, markings and markers.

 

            (Estimated completion date, September 2009)          

 

WAIKIKI

 

Curb Ramps at Various Locations, FY 2006 – Kuhio Avenue/Kapahulu Avenue:

 

Construction of new curb ramps, sidewalks and A.C. transition.  Installation of pedestrian push buttons.  Installation of pavement striping, markings and markers.

 

            (Estimated completion date, September 2009)

           

 

Rehabilitation of Streets, Unit 62 – Ala Wai Boulevard between Kanekapolei Street and Kalakaua Avenue:

 

 

Reconstruct identified curbs, gutters, driveways and asphalt roadway.  Resurface asphalt roadways; install permanent pavement markings; restore vehicle loop detectors and raise manhole and valve covers to grade. Anticipated start date of September 28, 2009; preliminary surveying to start August 19, 2009

           

(Estimated completion date, March 2010)

           

 

WAIALUA

 

Guardrail Improvements – FY2006 Phase II

Site B:  Waialua Beach Road – 66-080 Waialua Beach Road to Kiikii Stream:

 

Remove existing guardrails & concrete posts; provide archaeological monitoring; install object markers; install standard metal guardrail, post & spacers.

 

            (Estimated start date:  March 2010)

           

 

WAIMANALO

 

Retaining Walls Along Waikupanaha Street, Box Culvert No. 5

Demolish existing spillway; construct of new retaining walls; install new GRP; regrade site; install new metal guardrails and posts; install new chain link fence.

           

            (Estimated start date:  March 1, 2010)

           

 

WAIPAHU

 

Emergency Repairs to Waipahu Street Arch Bridge Over Waikele Stream (Bridge No. 961)

Road work complete.  PreFinal inspection scheduled for 3/31/10.  BMP slopes protection work item will be on punchlist until addressed satisfactorily.

 

            (Estimated completion date September 2009)

           

 

Rehabilitation of Secondary Streets at Pearl City – Paiwa Street (Farrington Highway to Waipahu Street), Waipahu Street (Hianakiu Street to Kaupu Place), Makoa Street (Puia Street to end to end), Puia Street (Anonui Street to Eleu Street, and Heahea Street to deadend):

 

Cold planing, reconstructing, and resurfacing pavement.  Reconstructing base at bus stops.  Adjusting street monuments, utility manhole frames and covers, installing pavement markings, reconstructing existing asphalt concrete berms with drainage openings.

 

 

(Estimated completion date, December 2009)

 

 

 

Waipahu Street Retaining Wall Repair & 16th Avenue Boulder Basin Dam Wall Reconstruction:

 

 

Demolish and rebuild retaining wall, curb ramp, and portion of sidewalk adjacent to Waipahu Elementary School.  Reconstruct Boulder Dam Wall along 16th Ave.  Waipahu site construction currently in progress.

 

            (Estimated completion date February 2010)